Category:SAFETY EVALUATION REPORT--LICENSING & RELATED ISSUES
MONTHYEARML20217K9931999-10-14014 October 1999 Safety Evaluation Supporting Amend 234 to License DPR-56 ML20217B4331999-10-0505 October 1999 Safety Evaluation Supporting Amend 233 to License DPR-56 ML20216H7091999-09-24024 September 1999 Safety Evaluation Supporting Amends 229 & 232 to Licenses DPR-44 & DPR-56,respectively ML20212D1281999-09-17017 September 1999 Safety Evaluation Supporting Proposed Alternatives CRR-03, 05,08,09,10 & 11 ML20211D5501999-08-23023 August 1999 Safety Evaluation Supporting Amends 228 & 231 to Licenses DPR-44 & DPR-56,respectively ML20206A2921999-04-20020 April 1999 Safety Evaluation Concluding That Proposed Changes to EALs for PBAPS Are Consistent with Guidance in NUMARC/NESP-007 & Identified Deviations Meet Requirements of 10CFR50.47(b)(4) & App E to 10CFR50 ML20205K7411999-04-0707 April 1999 Safety Evaluation Supporting Amends 227 & 230 to Licenses DPR-44 & DPR-56,respectively ML20196G7021998-12-0202 December 1998 SER Authorizing Proposed Alternative to Delay Exam of Reactor Pressure Vessel Shell Circumferential Welds by Two Operating Cycles ML20155C6071998-10-26026 October 1998 Safety Evaluation Supporting Amend 226 to License DPR-44 ML20155C1681998-10-22022 October 1998 Safety Evaluation Accepting Proposed Alternative Plan for Exam of Reactor Pressure Vessel Shell Longitudinal Welds ML20154J2401998-10-0505 October 1998 Safety Evaluation Supporting Amends 224 & 228 to Licenses DPR-44 & DPR-56,respectively ML20154H4771998-10-0505 October 1998 Safety Evaluation Supporting Amends 225 & 229 to Licenses DPR-44 & DPR-56,respectively ML20154G6821998-10-0101 October 1998 SER Related to Request for Relief 01A-VRR-1 Re Inservice Testing of Automatic Depressurization Sys Safety Relief Valves at Peach Bottom Atomic Power Station,Units 2 & 3 ML20154G6631998-10-0101 October 1998 Safety Evaluation Supporting Amends 223 & 227 to Licenses DPR-44 & DPR-56,respectively ML20153B9651998-09-14014 September 1998 Safety Evaluation Supporting Amend 9 to License DPR-12 ML20238F2661998-08-24024 August 1998 Safety Evaluation Supporting Amend 222 to License DPR-44 ML20237A7761998-08-10010 August 1998 SER Accepting Licensee Response to NRC Bulleting 95-002, Unexpected Clogging of RHR Pump Strainer While Operating in Suppression Pool Cooling Mode ML20236R8281998-07-15015 July 1998 Safety Evaluation Approving Proposed Alternative (one-time Temporary non-Code Repair) Pursuant to 10CFR50.55a(a)(3) (II) ML20248F4781998-06-0101 June 1998 Corrected Page 1 to SE Supporting Amends 221 & 226 to Licenses DPR-44 & DPR-56,respectively.Original Page 1 of SE Had Three Typos ML20247N5351998-05-11011 May 1998 SER Accepting Third 10-year Interval Inservice Program for Pump & Valves for Plant,Units 2 & 3 ML20198L3331997-12-18018 December 1997 Safety Evaluation Supporting Approval of Proposed Merger of Atlantic Energy,Inc,& Delmarva Power & Light Co ML20212G8301997-10-24024 October 1997 Safety Evaluation Supporting Amends 221 & 226 to Licenses DPR-44 & DPR-56,respectively ML20198S2161997-10-24024 October 1997 Safety Evaluation Accepting Proposed Change to Provisions Identified in Rev 14 of PBAPS QAP Description Re Nuclear Review Board Meeting Frequency ML20217J5631997-10-0909 October 1997 Safety Evaluation Supporting Amend 225 to License DPR-56 ML20217J6161997-10-0707 October 1997 Safety Evaluation Re Alternative to Reactor Pressure Vessel Circumferential Weld Insps for Plant,Unit 3 ML20211L6241997-10-0303 October 1997 Safety Evaluation Authorizing Licensee Proposed Use of Code Case N-516-1 to Weld Modified Suction Strainer in Suppression Chamber at Plant ML20217D8161997-09-30030 September 1997 Safety Evaluation Supporting Amend 224 to License DPR-56 ML20211D6201997-09-17017 September 1997 SER Accepting VT-2 Examiner Qualification Request for PECO Energy Company,Peach Bottom Atomic Power Station,Units 2 & 3 ML20216G5601997-09-0404 September 1997 Safety Evaluation Supporting Amends 220 & 223 to Licenses DPR-44 & DPR-56,respectively ML20217M8001997-08-19019 August 1997 Safety Evaluation Supporting Amends 219 & 222 to Licenses DPR-44 & DPR-56,respectively ML20149L2841997-07-23023 July 1997 Safety Evaluation Accepting Licensee Relief Request RR-22 for Plant,Units 2 & 3 ISI Program ML20140B0371997-05-30030 May 1997 Safety Evaluation Accepting QAP Description Change ML20135B4111997-02-19019 February 1997 Safety Evaluation Supporting Amends 218 & 221 to Licenses DPR-44 & DPR-56,respectively ML20149L8681996-11-15015 November 1996 SER Accepting Core Spray Piping Insp & Flaw Evaluation for Plant,Unit 2 ML20149L2441996-01-29029 January 1996 Safety Evaluation Accepting Insp & Evaluation Methodology for Operation of Unit 3 Core Shroud for Duration of Current Operating Cycle,Performed in Response to GL 94-03 ML20058F5641993-11-19019 November 1993 SE Accepting Util 930305 Response to NRC Bulletin 90-01, Suppl 1, Loss of Fill-Oil in Transmitters Mfg by Rosemount ML20057B6441993-09-16016 September 1993 SER Concluding That Safe Shutdown Capability at Plant, Satisfies Requirements of Section Iii.G & Iii.L of App R to 10CFR50 ML20126H9031992-12-23023 December 1992 Safety Evaluation Granting Relief from Inservice Insp Requirements for Facilities ML20127N4941992-11-17017 November 1992 Safety Evaluation Accepting Util 120-day Response to Suppl 1 to GL 87-02 ML20062C7501990-10-26026 October 1990 Safety Evaluation Re Evaluation of Response to NRC Bulletin 90-002, Loss of Thermal Margin Caused by Channel Box Bow ML20246E0331989-08-21021 August 1989 SER Supporting Util Response to Generic Ltr 83-28,Item 2,1 (Parts 1 & 2).Programs Exist for Identifying safety-related Components Required for Reactor Trip Function & Vendor Interface W/Nmss Vendor for Required Components ML20205A8801988-10-31031 October 1988 Safety Evaluation of Util Plan for Restart of Peach Bottom Atomic Power Station ML20148P3351988-04-0101 April 1988 SER Accepting Util Responses to Generic Ltr 83-28,Item 2.2.1 Re Equipment Classification Program for All safety-related Components ML20148E6301988-01-15015 January 1988 SER Accepting Util 840116,0927 & 850805 Responses to Generic Ltr 82-33,Item 6 Re Compliance w/post-accident Monitoring Instrumentation Guidelines of Reg Guide 1.97 Concerning Emergency Response Facilities ML20236D0541987-10-22022 October 1987 Safety Evaluation Supporting Util Repts on Computer Program Analyses Methods Intended for Use in Part of Plant Core Reload Analyses ML20235D2431987-09-22022 September 1987 Safety Evaluation Re Proposed Onsite Storage of Liquid Oxygen & Hydrogen for Implementation of Hydrogen Water Chemistry.Permanent Hydrogen Water Installation Acceptable ML20209H0201987-04-24024 April 1987 Safety Evaluation Supporting Util Re Torus Attached Piping Mods - Mark I Program ML20204C1001986-07-24024 July 1986 Safety Evaluation Supporting Listed Util Responses & Actions Reviewed During Insp on 840913-19 Re Generic Ltr 83-28,Items 3.1.1,3.1.2,3.2.1,3.2.2 & 4.5.1 ML20141F6071986-04-0808 April 1986 Safety Evaluation Granting Util Requests for Relief from Inservice Insp Requirements of ASME Code,Section XI ML20209C3141986-03-20020 March 1986 Safety Evaluation Supporting Shroud Head Connection Replacement at Facility,Per Util 860107 Submittal 1999-09-24
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217K9931999-10-14014 October 1999 Safety Evaluation Supporting Amend 234 to License DPR-56 ML20217B4331999-10-0505 October 1999 Safety Evaluation Supporting Amend 233 to License DPR-56 ML20217G3541999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbaps,Units 2 & 3. with ML20216H7091999-09-24024 September 1999 Safety Evaluation Supporting Amends 229 & 232 to Licenses DPR-44 & DPR-56,respectively ML20212D1281999-09-17017 September 1999 Safety Evaluation Supporting Proposed Alternatives CRR-03, 05,08,09,10 & 11 ML20212A5871999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Peach Bottom,Units 2 & 3.With ML20211D5501999-08-23023 August 1999 Safety Evaluation Supporting Amends 228 & 231 to Licenses DPR-44 & DPR-56,respectively ML20212H6311999-08-19019 August 1999 Rev 2 to PECO-COLR-P2C13, COLR for Pbaps,Unit 2,Reload 12 Cycle 13 ML20210N7641999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for PBAPS Units 2 & 3. with ML20209H1121999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbaps,Units 2 & 3. with ML20195H8841999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbaps,Units 2 & 3. with ML20206N1661999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Pbaps,Units 2 & 3. with ML20206A2921999-04-20020 April 1999 Safety Evaluation Concluding That Proposed Changes to EALs for PBAPS Are Consistent with Guidance in NUMARC/NESP-007 & Identified Deviations Meet Requirements of 10CFR50.47(b)(4) & App E to 10CFR50 ML20205K7411999-04-0707 April 1999 Safety Evaluation Supporting Amends 227 & 230 to Licenses DPR-44 & DPR-56,respectively ML20205P5851999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Peach Bottom Units 2 & 3.With ML20207G9971999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Peach Bottom Units 2 & 3.With ML20199E3471998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Peach Bottom,Units 1 & 2.With ML20205K0381998-12-31031 December 1998 PECO Energy 1998 Annual Rept. with ML20206P1651998-12-31031 December 1998 Fire Protection for Operating Nuclear Power Plants, Section Iii.F, Automatic Fire Detection ML20206D3651998-12-31031 December 1998 1998 PBAPS Annual 10CFR50.59 & Commitment Rev Rept. with ML20206D3591998-12-31031 December 1998 1998 PBAPS Annual 10CFR72.48 Rept. with ML20196G7021998-12-0202 December 1998 SER Authorizing Proposed Alternative to Delay Exam of Reactor Pressure Vessel Shell Circumferential Welds by Two Operating Cycles ML20196E8261998-11-30030 November 1998 Response to NRC RAI Re Reactor Pressure Vessel Structural Integrity at Peach Bottom Units 2 & 3 ML20198B8591998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Pbaps,Units 2 & 3. with ML20206R2571998-11-17017 November 1998 PBAPS Graded Exercise Scenario Manual (Sections 1.0 - 5.0) Emergency Preparedness 981117 Scenario P84 ML20198C6751998-11-0505 November 1998 Rev 3 to COLR for PBAPS Unit 3,Reload 11,Cycle 12 ML20195E5341998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Pbaps,Units 2 & 3. with ML20155C6071998-10-26026 October 1998 Safety Evaluation Supporting Amend 226 to License DPR-44 ML20155C1681998-10-22022 October 1998 Safety Evaluation Accepting Proposed Alternative Plan for Exam of Reactor Pressure Vessel Shell Longitudinal Welds ML20155H7721998-10-12012 October 1998 Rev 1 to COLR for Peach Bottom Atomic Power Station Unit 2, Reload 12,Cycle 13 ML20154J2401998-10-0505 October 1998 Safety Evaluation Supporting Amends 224 & 228 to Licenses DPR-44 & DPR-56,respectively ML20154H4771998-10-0505 October 1998 Safety Evaluation Supporting Amends 225 & 229 to Licenses DPR-44 & DPR-56,respectively ML20154G6821998-10-0101 October 1998 SER Related to Request for Relief 01A-VRR-1 Re Inservice Testing of Automatic Depressurization Sys Safety Relief Valves at Peach Bottom Atomic Power Station,Units 2 & 3 ML20154G6631998-10-0101 October 1998 Safety Evaluation Supporting Amends 223 & 227 to Licenses DPR-44 & DPR-56,respectively ML20154H5541998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Pbaps,Units 2 & 3. with ML20153B9651998-09-14014 September 1998 Safety Evaluation Supporting Amend 9 to License DPR-12 ML20151Y2901998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbaps,Units 2 & 3. with ML20238F2661998-08-24024 August 1998 Safety Evaluation Supporting Amend 222 to License DPR-44 ML20237B9531998-08-10010 August 1998 Specification for ISI Program Third Interval,Not Including Class Mc,Primary Containment for Bpaps Units 2 & 3 ML20237A7761998-08-10010 August 1998 SER Accepting Licensee Response to NRC Bulleting 95-002, Unexpected Clogging of RHR Pump Strainer While Operating in Suppression Pool Cooling Mode ML20237A5351998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Pbaps,Units 2 & 3 ML20236R8281998-07-15015 July 1998 Safety Evaluation Approving Proposed Alternative (one-time Temporary non-Code Repair) Pursuant to 10CFR50.55a(a)(3) (II) ML20236M3471998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbaps,Units 2 & 3 ML20249C4791998-06-0202 June 1998 Rev 6 to COLR for PBAPS Unit 2 Reload 11,Cycle 12 ML20248F4781998-06-0101 June 1998 Corrected Page 1 to SE Supporting Amends 221 & 226 to Licenses DPR-44 & DPR-56,respectively.Original Page 1 of SE Had Three Typos ML20248F7441998-05-31031 May 1998 Reactor Vessel Working Group,Response to RAI Regarding Reactor Pressure Vessel Integrity ML20248M3001998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Pbaps,Units 2 & 3 ML20247N5351998-05-11011 May 1998 SER Accepting Third 10-year Interval Inservice Program for Pump & Valves for Plant,Units 2 & 3 ML20249C4751998-05-0707 May 1998 Rev 5 to COLR for PBAPS Unit 2 Reload 11,Cycle 12 ML20247G0721998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Pbaps,Units 2 & 3 1999-09-30
[Table view] |
Text
.
+? nsu
?, UNITED STATES
[g ' ,g NUCLEAR REGULATORY COMMISSION g 4 j WASHINGTON, D. C 20555
/
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO SALEM ATWS EVENT, ITEMS 3.1.3 AND 3.2.3 PHILADELPHIA ELECTRIC COMPANY PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 DOCKET NOS. 50-277 AND 50-278
1.0 INTRODUCTION
By letter dated November 4,1983, the Philadelphia Electric Company (PEco, the licensee) submitted a response to our Generic Letter 83-28 for the Peach Bottom Atomic Power Station, Units 2 and 3. This review covered Items 3.1.3 and 3.2.3.
2.0 RACKGROUND On February 25, 1983, both of the scram circuit breakers at Unit 1 of the Salem Nuclear Power Plant failed to open upon an automatic reactor trip signal from the Reactor Protection System. This' incident occurred during the plant startup and the reactor was tripped manually by the operator l about 30 seconds after the initiation of the automatic trip signal. The l failure of the circuit breakers has been determined to be related to the j sticking of the under voltage trip attachment. Prior to this incident, on .
February 22, 1983, at Unit 1 of the Salem Nuclear Power Plant, an automatic trip signal was cenerated based on steam generator low-low level during plant startup. In this case, the reactor was tripped manually by the operator almost coincidentally with the automatic trip. Following these incidents, on February 28, 1983, the NRC Executive Director for Operations I (EDO), directed the staff to investigate and report on the generic implications of these occurrences at Unit 1 of the Salem Nuclear Power Plant. The results of the staff's inquiry into the generic implications of the Salem unit incidents are reported in NUREG-1000. " Generic Implications of ATWS Events at the Salem Nuclear Power Plant." As a result of this investigation, the Commission (NRC) requested (by Generic letter 83-28 dated July 8,1983) all licensees,of operating reactors, applicants for
, an operating license, and holders of construction permits to respond to certain generic concerns. These concerns are categorized into four areas:
(1) Post-Trip Review, (2) Equipment Classification and Vendor Interface, (3) Post-MaintenanceTesting,and(4)ReactorTripSystemReliability improvements.
Item 3.1.3 Components)(Post-MaintenanceTestingofReactorTripSystem(RTS) requires licensees and applicants to identify, if applicable, any post maintenance test requirements for the RTS in existing Technical Specifications which can be demonstrated to degrade rather than enhance safety. Item 3.2.3 extends this same requirement to include all other
\
l safety-related components. Any proposed Technical Specification changes resulting from this action shall receive a pre-implementation review by NRC.
! 3.0 EVALVATION Our review of the licensee's submittals was performed with the assistance of EGAG, Idaho, Inc. The submittal from PEco was reviewed to determine compliance with items 3.1.3 and 3.2.3 of the generic letter. First, the submittal was reviewed to determine if these two items were specifically addressed. Second, the submittal was checked to determine if there were any post-maintenance test requirements specified by the Technical Specifications that were suspected to degrade rather than enhance safety.
Last, the submittal was reviewed for evidence of special conditions or other significant information relating to the two items of concern.
The review of Generic Letter 83-73, Item 4.5.3 may result in proposed changes to the Technical Specifications reouirements for surveillance testing frequency and out-of-service intervals for testing. The primary concern of Item 4.5.3 is the surveillance testing intervals. Items 3.1.3 and 3.2.3 are specifically directed at post-maintenance test requirements.
These concerns are essentially independent. However, the evaluation of these concerns are coordinated so that any correlation between these concerns will be adequately considered. Since no specific proposal to change the Technical Specifications has been submitted, there is no l identifiable need at this time for correlating the reviews of item 4.5.3 l with this review. !
We have reviewed the November 4, 1983 PEco response to items 3.1.3 and 3.2.3 of Generic Letter 83-28. Within the response, the licensee's evaluation for Items 3.1.3 and 3.2.3 is that, following a review of the Peach Bottom Technical Specifications, no existing testing requirements in the Technical Specifications which degrade safety in the Reactor Protection System or other safety-related components were identified.
4.0 CONCLUSION
The licensee stated that it has reviewed its Technical Specification requirements to identify any post-maintenance testing which could be demonstrated to degrade rather thhn enhance s'afety and found none that degraded safety. Based on our review, assisted by our contractor, EG&G, Idaho, Inc., we find that the licensee's submittal, with respect to the Peach Bottom facilities, is acceptable.
Principal Contributor: D. Lasher Dated: July 22, 1985 L