BECO-LTR-96-104, Forwards Supplemental Pages to Proposed Amend to Standby Liquid Control/Rps/Rod Block Tech Spec

From kanterella
(Redirected from ML20132E529)
Jump to navigation Jump to search
Forwards Supplemental Pages to Proposed Amend to Standby Liquid Control/Rps/Rod Block Tech Spec
ML20132E529
Person / Time
Site: Pilgrim
Issue date: 12/10/1996
From: Boulette E
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20132E533 List:
References
BECO-LTR-96-104, NUDOCS 9612230317
Download: ML20132E529 (2)


Text

.-_ _ ._ __ ..._ _. _..

_ _ - _. _ . _.- ~..-..__._..-m._ . _ _ . _ . . _ - . . . _ . _ . - - _ _ _ _ - . -

i  !

e i- e .  !

h  !

k Boston EcEson 10CFR50.36 l Pilgrim Nuclear Power Station Rocky Hill Road j

=

Plymouth, Massachusetts 02360 .

I l- l E. T. Boulette, PhD i Senior Vice President-Nuclear BECo Ltr. #96 104

]

! U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Docket No. 50-293 License No. DPR-35

Subject:

Submittal of Supplemental Pages to Pilgrim's Proposed Amendment to Standby Liquid Control /RPS/ Rod Block Technical Specification

Reference:

Proposed Technical Specification Change to Reactor Protection System, Rod Block Instrumentation and Standby Liquid Control Requirements, dated May 1,1996.

By letter of May 1,1996, Pilgrim requested an amendment to section 3/4.4, Table 3.1.1, and Table 3.2.C.1. During subsequent discussions with the NRC, further changes to enhance that amendment i request were identified and developed. The changes add surveillances, surveillance frequencies and operability requirements for rod blocks associated with the mode switch in the shutdown position.

l

. We submit the attached pages 3/4.2-20 (Table 3.2.C.1), 3/4.2-22 (notes for Table 3.2.C-1), 3/4.2-23, l (Table 3.2.C-2) and 3/4.2-35 (Table 4.2.C) for incorporation into our May 1,1996, amendment request. They are submitted in accordance with 10CFR50.36(b) and 10CFR50.90.

'The changes are encompassed by the .significant hazards considerations accompanying our ,

May 1,1996, amendment request. l Should you require further informatiion conceming this issue, please contact P.M.Kahler at (508)  !

830-7939.  !

h. , h~ -

o-0033 E. T. Boulette, PhD PMK/dmc/rodblock g Attachments pl 9612230317 961210 PDR ADOCK 05000293 P pyg _

+r,- ,--, -

cc: Mr. Alan B. Wang, Project Manager Project Directorate 1-1 Office of Nuclear Reactor Regulation Mail Stop: 14B2 U. S. Nuclear Regulatory Commission 1 White Flint North 11555 Rockville Pike Rockville, MD 20852 Regional Administrator, Region i U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Senior Resident inspector Pilgrim Nuclear Power Station i

l l

j i

l 1

_ . _