Text
i i
VinointA I?r.scTunc Axn Pownu COMPANY Hirsixoxn,Vaum.m ununt W.L.sinwrur Vers l'umanumar l
Narra. man OPmNATIONS September 19, 1985 l
Mr. Harold R. Denton, Director Serial No.85-645 Office of Nuclear Reactor Regulation N0/EJL:acm Attn:
Mr. Edward J. Butcher, Acting Chief Docket Nos. 50-338 Operating Reactors Branch No. 3 50-339 Division of Licensing License Nos. NPF-4 U. S. Nuclear Regulatory Commission NPF-7 Washington, D. C. 20555 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 PROPOSED TECHNICAL SPECIFICATIONS CHANGES Pursuant to 10 CFR 50.90, Virginia Electric and Power Company requests an amendment, in the form of changes to the Technical Specifications, to-Operating License Nos. NPF-4 and NPF-7 for North Anna Power Station Units 1 and 2.
In accordance with the guidance provided in Generic Letter 84-13,
" Technical Specification For Snubbers," we are proposing changes to Sections 3/4.7.10 and 6.10.2 of the Technical Specifications.
The proposed changes to the Technical Specifications are provided in Attachments 1 and 2 for Units 1 and 2, respectively. A discussion of the proposed changes to the Technical Specifications is provided in.
In accordance with 10 CFR Part 170 an Application Fee of
$150 is also enclosed.
This request has been reviewed and approved by the Station Nuclear Safety and Operating Committee and the Safety Evaluation and Control Staff. It has' been determined that this change does not pose an unreviewed safety question as defined in 10 CFR 50.59 and does not pose a significant hazards consideration as defined in 10 CFR 50.92.
As we have discussed with members of your staff, Unit 1 is scheduled to begin a refueling outage November 1,1985. We would like to implement l
these requirements with the snubber work that will be performed during this outage. We would appreciate any assistance that you and your staff can provide in expediting this request.
q
\\
eV 00
$if pg ?Bau "o%,ilil"
.h
/
r s
_i Mr. Harold R. Denton VamonwsA Ex.mcTaIC AND POWER COMPANY TO If you have any questions, or need additional information to process this request, please contact us.
Very truly yours, b)u T
W. L. Stewart Attachments:
1.
Proposed Technical Specification Change for North Anna Unit 1 2.
Proposed Technical Specification Change for North Anna Unit 2 3.
Discussion of Proposed Changes 4.
Application Fee cc:
Dr. J. Nelson Grace Regional Administrator NRC Region II Mr. M. W. Branch NRC Resident Inspector North Anna Power Station Mr. C. Price Department of Health 109 Governor Street Richmond, Virginia 23219 1
1 L-.
i COMMONWEALTH OF VIRGINIA )
)
CITY OF RICHMOND
)
The -foregoing document was acknowledged before me, in and for the City and Commonwealth aforesaid, today by W.
L.
Stewart who is Vice President Nuclear Operations, of Virginia Electric and Power Company.
He is duly authorized to execute and file the foregoing document in behalf of that Company, and the statements in the document are true to the best of his knowledge and belief.
Acknowledged before me this F\\
day of hekedwt 19 D My Commission expires: kkhea
, 19 i %
\\o
\\
b n\\
k\\d%C10 Ndtary Public
~
m' J
(
(SEAL)
S/001 i
t