APPENDIX A NOTICE OF VIOLATION Arkansas Power & Light Company Docket:
50-368/85-17 Arkansas Nuclear One, Unit 2 License:
NPF-6 During an NRC inspection conducted during the period June 1-30, 1985, a violation of NRC requirements was identified.
The violation involved the failure to follow the requirements of a valve lineup procedure.
In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1985), the violation is listed below:
Unit 2 Technical Specification 6.8.1 requires that, " Written procedures shall be established, implemented and maintained covering.
. a.
The applicable procedures recommended in Appendix "A" of Regulatory Guide 1.33, Revision 2, February 1978."
Plant Operating Procedure 2102.01, " Plant Pre-heatup and Pre-critical Checklist," has been established in accordance with this Technical Specification.
Section 3.5 of Attachment E to Procedure 2102.01 requires any valve not in
~
the required position be listed on the Cateogry E valve log sheet (Form 1015.01C).
4 Contrary to the above, Category E valve 2BS-32 was found to be out of its required position on June 3, 1985, yet no entry was made on Form 1015.01C.
This is a Severity Level V violation (Supplement I.E) (368/8517-01).
Pursuant to the provisions of 10 CFR 2.201, Arkansas Power & Light Company is hereby required to submit to this office within 30 days of the date of the letter transmitting this Notice, a written statement or explanation in reply, including for each violation: (1) the reason for the violation if admitted, (2) the corrective steps which have been taken and the results achieved, (3) the corrective steps which will be taken to avoid further violations, and (4) the date when full compliance will be achieved.
Where good cause is shown, consideration will be given to extending the response time.
Dated at Arlington, Texas, this t g# day of L 1985.
4-9508010161 850725 ADOCK0500g3 PDR G