ML20132D572
| ML20132D572 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 12/16/1996 |
| From: | Gwynn T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Hutchinson C ENTERGY OPERATIONS, INC. |
| References | |
| NUDOCS 9612200028 | |
| Download: ML20132D572 (6) | |
Text
,
i 2 #f oug UNITED STATES
.f.o t
NUCLEAR REGULATORY COMMISSION n
{
REGloN iv g
611 RYAN PLAZA DRIVE, SulTE 400 g%.... +,0 AR LINGToN, TEXAS 76011-8064 OEB l 61996 C. R. Hutchinson, Vice President Operations - Grand Gulf Entergy Operations, Inc.
P.O. Box 756 Port Gibson, Mississippi 39150
SUBJECT:
TEAM INSPECTION - NRC INSPECTION REPORT 50-382/97-01
Dear Mr. Hutchinson:
The purpose of this letter is to announce our Maintenance Rule Baseline Team Inspection at your Waterford 3 reactor facility. We have scheduled this inspection for February 24-28, 1997. The designated inspectior i leader, Mr. C. J. Paulk, of this office, will make arrangements with your staff to t.,
shonically discuss the inspection plans in more detail.
The inspection objective will be to evaluate the effectiveness of your initial activities establishing baseline conditions to support compliance with the requirements of 10 CFR 50.65. The inspection will be conducted using inspection Procedure 62706,
" Maintenance Rule." This inspection willinvolve a team of about six NRC personnel.
l The inspection team will require information about your program and its implementation for their in-office preparation for the inspection. A description of the material that may '.se needed is in the enclosure to this letter. Our designated team leader will be contacting your staff and arranging for specific material to be available to the team by January 2, 1997.
If you have any questions concerning this inspection, please contact me at 817/860-8248 or Dr. Dale A. Powers, Chief, Maintenance Branch, at 817/860-8195.
Sinc T omas P. Gwyn Dire or
/
Division of React S ety Docket: 50-416 License: NPF-29
Enclosure:
(as stated) 9612200028 961216 DR ADOCK 05000416 PDR
B Entergy Operations, Inc. '
cc:
Executive Vice President and Chief Operating Officer Entergy Operations, Inc.
4 P.O. Box 31995 Jackson, Mississippi 39286-1995 Wise, Carter, Child & Caraway P.O. Box 651 Jackson, Mississippi 39205 j
Winston & Strawn 1400 L Street, N.W. - 12th Floor Washington, D.C. 20005-3502 Sam Mabry, Director 4
Division of Solid Waste Management Mississippi Department of Natural Resources P.O. Box 10385 i
Jackson, Mississippi 39209 President Claiborne County Board of Supervisors Port Gibson, Mississippi 39150 Mr. Rod Rogers 6B-7 4
Bechtel Power Corporation Nuclear Operating Plant Services 9801 Washington Boulevard Gaithersburg, Maryland 20878-5356 General Manager Grand Gulf Nuclear Station Entergy Operations, Inc.
P.O. Box 756 Port Gibson, Mississippi 39150 The Honorable William J. Guste, Jr.
Attorney General Department of Justice State of Louisiana P.O. Box 94005
- Baton Rouge, Louisiana 70804-9005
I i
Entergy Operations, Inc. :
Office of the Governor State of Mississippi Jackson, Mississippi 39201 i
Mike Moore, Attorney General l
Frank Spencer, Asst. Attorney General State of Mississippi j
P.O. Box 22947 Jackson, Mississippi 39225 Dr. F. E. Thompson, Jr.
State Health Officer State Board of Health P.O. Box 1700 Jackson, Mississippi 39205 Eddie S. Fuente, Director State Liaison Officer Division of Radiation Health Mississippi Department of Health P.O. Box 1700 Jackson, Mississippi 39215-1700 Vice President Operations Support Entergy Operatiens, Inc.
P.O. Box 31935 Jackson, Mississippi 39286-1995 Director, Nuclear Safety and Regulatory Affairs i
Entergy Operations, Inc.
P.O. Box 756 Port Gibson, Mississippi 39150 Vice President, Operations Grand Gulf Nuclear Station Entergy Operations, Inc.
P.O. Box 756 Port Gibson, Mississippi 39150
_ ~ _ _ -
-t Enter 0y Operations, Inc.,
I l
obcc to DMB (IE01)- 6RS, DRP, and Decommissioning bec distrib. by RIV:
L. J. Callan Resident inspector DRP Director DRS-PSB Branch Chief (DRP/D)
MIS System i
Project Engineer (DRP/D)
RIV File Branch Chief (DRP/TSS)
Leah Tremper (OC/LFDCB, MS: TW.~ 19E10) n 1
1 DOCUMENT N AME: r:\\_GG\\GG7011t.cjp To recoh,e copy ot document. Indicate in box: "C" = Copy wthout encigsures "E" = Copy wth enclosures "N" = No copy I
RI:RIV C:MB D:DRS k ff o
CJPaulk/Imb y DAPowers @
TPGwynn \\]f /
12/jy96 12/jy96 12/% 96 OFFICIAL RECORD COPY
)
?'00003 I
)
Entergy Operations, Inc. bec to DMB (IE01)- DRS, DRP, and Decommissioning bec distrib. by RIV:
L. J. Callan Hesident inspector DRP Director DRS-PSB Branch Chief (DRP/D)
MIS System Project Engineer (DRP/D)
RIV File Branch Chief (DRP/TSS)
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
DOCUMENT NAME: r:\\_GG\\GG7011t.cjp To receive copy of document, Indicate in box: "C" = Copy without encigsures "E" = Copy with enclosures "N" = No copy Rl:RIV C:MB D:DRS jy lf f l
l l
o CJPaulk/Imb Of DAPowers @
TPGwynn \\]I [
12/jy96
~
124396 124b96 OFFICIAL RECORD COPY
~
O I
ENCLOSURE LIST OF ITEMS REQUESTED FOR IN-OFFICE REVIEW 1.
Copy of Maintenance Rule Program 1
l 2.
Copies of procedures that directly relate to, and support, the Maintenance Rule i
Program
)
3.
List of systems, structures, and components, or functions, within the scope of the
]
Maintenance Rule. This list should identify those structures, systems, and j
components, or functions that have been designated as risk significant.
4.
List of systems, structures, and components, or functions, that were excluded from the scope of the Maintenance Rule, including justifications for exclusions 5.
List of systems, structures, and components, or functions, placed within the (a)(1) and (a)(2) Categories of the Maintenance Rule 6.
Background explanation for systems, structures, and components currently assigned to the (a)(1) category 7.
Copy of any internal and external Maintenance Rule assessments or related audits 8.
Current Maintenance Rule trending data 9.
List of maintenance preventive functional failures for the previous two fuel cycles,
]
with any repetitive failures identified i
10.
Current program performance criteria and goals 11.
Risk Reduction Worth, Risk Achievement Worth, and Core Damage Frequency results 12.
Current organization chart depicting key personnelinvolved in the Maintenance Rule implementation and a list of their office telephone numbers 13.
Information on licensee personnel (engineering, operations, and maintenance)
Maintenance Rule functional responsibilities 14.
Qualifications and backgrounds of expert panel members 1
t