ML20132D433
| ML20132D433 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 12/10/1996 |
| From: | Grant G NRC (Affiliation Not Assigned) |
| To: | Gipson D DETROIT EDISON CO. |
| Shared Package | |
| ML20132D438 | List: |
| References | |
| NUDOCS 9612190387 | |
| Download: ML20132D433 (1) | |
See also: IR 05000341/1996014
Text
'
o
December 10, 1996
Mr. D. R. Gipson
Senior Vice President
Nuclear Generation
The Detroit Edison Company
6400 North Dixie Highway
Newport, MI 48166
SUBJECT:
NRC INSPECTION REPORT NO. 50-341/96014(DRS)
j
Dear Mr. Gipson:
On November 22, 1996, the NRC completed an inspection of the licensed operator
requalification training program at your Enrico Fermi, Unit 2, facility. The enclosed report
j
presents the results of that inspection.
,
Overall, the inspectors concluded that the licensed reactor operator and senior reactor operator
requalification programs were being implemented in accordance with 10 CFR Part 55
requirements.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and
the enclosed report will be placed in the NRC Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
original signed by B. Clayton
l
Geoffrey E. Grant, Director
Division of Reactor Safety
Docket No. 50-341
1
Enclosure:
NRC Inspection Report
No. 50-341/96014(DRS)
cc w/ encl:
N. Peterson, Supervisor of Compliance
P. A. Marquardt, Corporate Legal Department
James R. Padgett, Michigan Public
j
Service Commission
Michigan Department of Public Health
Monroe County, Emergency Management Division
Distribution:
Docket File w/enci
DRS w/ encl
A. B. Beach, Rlli w/ encl
g
PUBLIC IE-M w/ encl
Rlli PRR w/enct
Enf. Coordinator, Rill w/ enc!
OC/LFDCB w/ encl
SRI, Fermi w/ encl
CAA1 w/enci (E-mail)
I
L' }
DRP w/enct
LPM, NRR w/ encl
W. L. Axelson, Rlli w/enci
M. Bies, Rlll w/encI
S. Richard, HOLB w/ encl
DOCUMENT NAME: G:\\DRS\\FER96014.DRS
i
To receive a copy of this document. Indicate in the box 'C' = Copy without attachment! enclosure "E" = Copy with attachment / enclosure "N"
l
= No copy
(
OFFICE l Rill
d
Rlli
lv Rlli
l
Rlll
/k
l6
\\
l
NAME
DMcNeil:nh 'tp,.
MLeach 4W '
MJordan' Vcp-
HClayton/GGrant
/
l
DATE
11/7/1/96
11/M /96
11/ /96 p/yg
11/f /96
OFFICIAL RECORD COPY
9612190387 961210
ADOCK 05000341
0