Deficiency Rept SD-81 Re Structural Steel Connections in Main Steam Valve Bldg.Initially Reported on 850412. Connections Dispositioned for Rework to Original Specs.Next Rept Expected by 850829
ML20132D426
Person / Time
Site: Millstone Dominion icon.png
Issue date: 07/11/1985
From: Opeka J
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
F0777A, F777A, SD-81, NUDOCS 8508010003
Download: ML20132D426 (2)


Text

_

I.

e x

., s NORTIE!AST UTILITIES o.nor i Ornc... s.w.n sir i. so,iin. conneci, cut w cow.icw ie o ao a u e=

T,

.w.

- nia.c=ccw e P.O. BOX 270 otm..m..oa.a cw=

HARTFORD CONNECTICUT 06NI-0170 C'

L J

((U,C.7.,'c"~,

(203) 665-5000 July 11,1935 t

Docket No. 50-423 F0777A 1

^

Dr. Thomas E. hiurley Regional Administrator U. S. Nuclear Regulatory Commission Region 1,

631 Park Asenue g

King of Prussia, PA 19406

Reference:

(1)

3. F. Opeka to T. E. Murley, F0734A,Jated May 10, 1935.

Dear Dr. Murley:

,['

\\

Mill: tone Nuclear Power Station, tinit No. 3 Reporting of Potential Significarn Deficiencies in Accordance with 10CFR30.55(e):

Structural Steel Connections in the Main Steam Valve Building (SD-81) la an April 12,1985 telephone conversation between your Mr. T. Rebelowski and

,i our Mr. P. J. Quinlan, Northeast Nuclear Energy Company (NNECO) reported a potential significant deficiency in the construction of Millstone Unit No. 3 in

" ~

accordance with 10CFR50.55(e).' The potential significant deficiencyin<olved structural steel connections in the Main Steam Valve Building (MSVB). As noted t

in Reference (1), we are hereby providing the following update.

Of the 96 previously reported deficient fixed-end connections, 31 have been dispositioned for re-work to the original design. Engineering has accepted the balance of the fixed-end connections as is. The 70 slotted connections with overtightened bolts were reworked to the original specifications.

If these conditions had remsined undetected, it ahpears that plastic deformation T

in members as well as we'.d failure could have ocprred due to either a severe temperature environment resulting from an crcadent condition or a safe shutdown earthquake event.

N y

\\

Therefore, we consider this to be a significant'peficiency in accordance with 10CFR50.55(e).

t These conditions are expected to be limited to the MSYB. However, a sampling of connections in other QA Category 1 Building is still being performed to verify this.

\\

5 f

4 a

S 4

ll0 i

d#L

\\

l

.... - As such, we are not able to provide a final report at this time. We will provide an update on this matter by August 29,1985.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY

% F-cxL

3. F. Obekh V

Senior Vice President cc:

Mr. 3. M. Taylor, Director Division of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555

.