ML20132C987

From kanterella
Jump to navigation Jump to search
Forwards Notice of Upcoming Meetings Re NRC High Level Waste Mgt Program as Result of 840827 Fr Notice.Notice Will Be Updated Weekly
ML20132C987
Person / Time
Issue date: 09/09/1985
From: Bunting J
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To:
AFFILIATION NOT ASSIGNED
References
REF-WM-10, REF-WM-11, REF-WM-16 1161, 1551, 776, NUDOCS 8509270228
Download: ML20132C987 (4)


Text

m3 EECO

[ '

0, UNITED STATES E" }, NUCLEAR REGULATORY COMMISSION 5 j WASHINGTON, D, C. 20555

%,...../

SEP 0 1905 ATTENTION: Potential Host States Affected Indian Tribes Other Interested Parties

SUBJECT:

NOTICE OF UPCOMING MEETINGS The attached notice of upcoming meetings related to the NRC's high-level waste management program is being sent to you as a result of the NRC Federal Register Notice of August 27, 1984. This notice will list both tentative and firmly established meetings between NRC and DOE and will be updated weekly.

In addition to this weekly listing, a telephone recording service has been established for the announcement of upcoming meetings related to the NRC waste management program. The number is 1/800/368-56f 2, Ext. 79002, or 427-9002 for Washington area callers. The recording will be' updated weekly, or when .

changes /cancella~tions occur.

  • -~~ $ h b= $ )

seph 0. Bunting, Chief olicy and Program Control Branch Division of Waste Management Enclosure- '

Notice of fteetings WM Reccrd file W.',i Praitti LC,./J.ZS J,L&2.9, Sf_ DacVt No. . - - . - -

P 3 a v _ .__ __

um B, M, L-D",trduim: _ . _ _ _ _ , _ _ _ . _ _ _ , _

Man to pt 63 sa __

8509270228 850909 PDR WASTE WM-10 PDR l

h64f ~ /S$ '

\

st<w 96 dW ' //6/

85/09/09 NOTICE OF UPCOMING MEETINGS NRC and DOE have agreed upon the need for all of the below mentioned meetings.

The following meetings have been firmly established on the dates noted; actual dates, locations, and times will be added as known:

September 18, 9 a.m., at NRC Willste Bldg, Room 130. Monthly Status Report on NRC Division of Waste Management Issue Tracking and Information Mgmt System. This is the first in a series of status update meetings.

September 26-27, in the D.C. area. Subsystem performance allocation.

September, in the D.C. area. Quality Assurance workshop.

October 8-10, in the D.C. area. BWIP waste package. ,

October 29-31, location unknown. Salt Repository Project waste package; r November 5-7, in the D.C. area. Salt Repository Project surface based test plan.

November 19-21, in the D.C. area. Salt Repository Project exploratory shaft design.

Date TBD, in the D.C. area. Tuff hydrology & geochemistry.

Date TBD, in the D.C. area. Tuff performance assessment plan.

Date TBD, in the D.C. area. Discussion of DOE document " Rationale for Seismo/ Tectonic Investigations for Licensing a Nuclear Waste Repository."

i I

I l

l

85/09/09 The following meetings have been tentatively scheduled on the dates noted; actual dates, locations, and times will be added as known:

October, in the D.C. area. DOE's responses to NRC's comments on the environmental assessments.

October, in the D.C. area. CY 1986 planning meeting.

October, in the D.C. area. 'BWIP geochemistry workshop.

]

October, location unknown. BWIP data management.

October, in the D.C. area. Meteorology monitoring workshop.

October, in the D.C. area. Site Characterization Plan, Chapter 8.

October / November, in the D.C. area. Site Characterization Plan issue -

resolution strategy, issues & data needs.

October / November, in the D.C. area. BWIP hydrology workshop.

November / December, in the D.C. area. BWIP repository design workshop.

November / December, in the D.C. area. BWIP geology workshop.

December 1985/ January 1986, in the D.C. area. Salt Repository Project in situ testing.

December 1985/ January 1986, in the D.C. area. Salt Repository Project repository design.

Date TBD, at DOE's Las Vegas, NV office. Tuff exploratory shaft test plan.

Date TBD, in the D.C. area. BWIP exploratory shaft test plan.

Date TBD, in the D.C. area. BWIP_ exploratory shaft design.

- - . . . _ . _. _ _ _ - . . _ _ - _ . _ _ - . _ _ _ . . _ _ m _ _ _ _ _ _ _ _ _ . _ . . _ _ . _ . _ - - ._.

5, g .

SUNSHINE FEDERAL RECISTER NOTICE 2 l- AGENCY HOLDING THE MEETING: Nuclear Regulatory Connission 2:00 p.m. Discussion of Management-Organization and Internal i

, DATE: lleeks of September 2, 9, 16, and 23, 1985 Personnel Matters (CLOSED--Ja,32 & 6) i f' 3 . I PLACE: . Consissioners' Conference Room,-1717 H Street, N.W., Washington, D.C. Wednesday, Septeo6er 11 i ' STATUS: Open and Closed 1:30 p.m. Discussion of Proposed Station Blaikeut Rule j (PUBLICMEETING)-

, MATTERS TO BE CONSIDERED:

j 3:00 p.m. Discussion of Plant Issues with Regional Admini-j- Week of September 2 strators (PUBLIC MEETING)

Tuesday, September 3 Thursday, September 12  ;

2:00 p.m. Periodic Briefing on NT0Ls 2:00 p.m. Staff Briefing on TVA (PUBLIC MEETING)

.(0 pen / Portion may be CLOSED--Ex. 5 & 7) 3:30 p.m. Affirmation Meeting (PUBLIC MEETING) (if needed) ,

Wednesday, September 4  !

j. Friday, Septec6er 13 e k .,

.10:00 a.m. Discussion of Management-Organization and Internal Personnel Matters (CLOSED--Ex. 2 & 6) 2:15 p.m. Periodic Meeting with Advisory Conenittee on Reactor.

Safeguards (ACRS) (PUBLIC MEETING) 2:00 p.m. Continuation of 7/23 Discussion on Threat Level and Fhysical Security (CLOSED--Ex. 1) Week of Septeneer 16 - Tentative .

l Thursday, September 5 Tuesday, September 17 11:30 a.m. ' Affirmation /DiscussionandVote(PUBLICMEETING) 2:00 p.m. Status of Progress on Environmental Qualification

a. Final Policy Statement on Engineering Expertise of Electrical Equipment (PUBLIC MEETING) on Shift
b. Final 10 CFR Part 2 Subpart K, ' Hybrid Hearing 3:30 p.m. Affirmation Meeting (PUBLIC MEETING) (if needed) I Procedures for Expansions of Onsite Spent Fuel ,

Storage Capacity at Civilian Power Reactors" Wednesday, September 18 '

) c. Mr. Husted's.Pequest for Hearing +

. d. Procedures to be followed When a Subpoena or 9:00 a.m. Continuation of 7/24 Briefing on Davis-Besse

' l Other Demand for Disclosure of Records or (PUBLIC MEETING) ,

Information is Served on NRC Employees'(tentative) i 10
30 a.m. Status of Interpretation of Appendix R - Fire t j Friday, September 6 Protection (PUBLIC MEETING) i '

4 9:30 a.m. Oral Presentations on. Timing of DOE's Preliminary Week of September 23 - Tentative Determination on Sultability of Sites for Development .

as Repositories (PUBLIC MEETING) Thursday, September 26 ,

i Week of September 9 - Tentative . 11:30 a.m. Affirmation Meeting (PUBLIC MEETING) (if needed)

I Monday, September 9 TO VERIFY THE STATUS OF MEETINGS CALL (RECORDING) - (202) 634-1498 f 2:00 p.m. Discussion on Earthquakes and Emergency Planning CONTACT PERSON FOR MORE INFORMATION: Julia Corrado (202) 634-1410 1 (PUBLIC MEETING)

Tuesday, September 10 10:00 a.m. Discussion and Oral Presentations on Uranium Mill Julia Corrado 7

Tallings Regulations (PUBLIC MEETING) (tentative) Office of the Secretary B/29/85

, , s. .

, . - - -