ML20132C623

From kanterella
Jump to navigation Jump to search
Forwards LAR Revising Section 2.1.A for SLMCPR & Deleting Sentence from Section 3.11.C of OLMCPR Re Limit Penalty for Single Recirculation Loop Operation
ML20132C623
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 11/25/1996
From: Hill W
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20132C629 List:
References
NUDOCS 9612180419
Download: ML20132C623 (2)


Text

. .

Northem States Power Company Monticello Nuclear Generating Plant 2807 West Hwy 75 Monticello, Minnesota 55362-9637 November 25,1996 10 CFR Part 50 Section 50.90 U S Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Ucense Amendment Request Dated November 25,1996 Safety Limit Minimum Critical Power Ratio Attached is a request for a change in the Technical Specifications, Appendix A of the Operating Ucense for the Monticello Nuclear Generating Plant. This request is submitted in accordance with the provisions of 10 CFR Part 50, Section 50.90.

Changes are proposed to Section 2.1.A for the Safety Limit Minimum Critical Power Ratio (SLMCPR) and to Section 3.11.C for the Operating Limit Minimum Critical Power Ratio (OLMCPR). The proposed change to section 2.1.A revises the SLMCPR value from 1.07 to 1.08 for two recirculation pump operation and from 1.08 to 1.09 for single loop operation. The proposed change to section 3.11.C deletes the sentence that specifies the OLMCPR limit penalty for single recirculation loop l operation and adds a statement which references the Core Operating Limits Report as the source for  !

this information.

Exhibit A contains a description of the proposed changes, the reasons for requesting the changes, a Safety Evaluation, a Determination of Significant Hazards Consideration, and an Environmental Assessment. Exhibit B contains the current Technical Specification pages marked up with the proposed changes. Exhibit C contains revised Monticello Technical Specification pages.

Please contact Sam Shirey (612-295-1449) if you require further information related to this request.

lk **

William J Hill Plant Manager Monticello Nuclear Generating Plant c: Regional Administrator-Ill, NRC NRR Project Manager, NRC Resident inspector, NRC State of Minnesota Attn: Kris Sanda ,

DR O Ohbbh63 P ppg l'70053 ed

\

USNRC NORTHERN STATES POWER COMPANY November 25,1996 Page 2 Attachments: Affidavit to the US Nuclear Regulatory Commission Exhibit A - Evaluation of Proposed Changes to the Technical Specifications for Operating Ucense DPR-22 l Exhibit B - Proposed Changes Marked Up on Existing Technical Specification Pages Exhibit C - Revised Monticello Technical Specification Pages l

l l

l I