ML20132B371
| ML20132B371 | |
| Person / Time | |
|---|---|
| Issue date: | 11/19/1996 |
| From: | Hill W NRC OFFICE OF THE SECRETARY (SECY) |
| To: | Taylor J NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
| References | |
| REF-10CFR9.7 SECY-96-202-C, NUDOCS 9612170178 | |
| Download: ML20132B371 (3) | |
Text
.-
~ >
- - ~ - - -
l l
)
I 00ooooooooecoco.......,h
(
[prro %,^
RELEASEDTOTHE PDR UNITED STATES O
NUCLEAR REGULATORY COMMISSION
- g WASHINGTON, D.C. 20555-0001 g
k da!0 jai 4
%,*****,o/
e s e e e.........,,,!!als,,,,,,0 November 19, 1996 OFFICE OF THE SECRETARY l
MEMORANDUM TO:
James M. Taylor Ex cutive Director for Operations
,n'
- 74. Akt.l FROM:
W lliam M.
Hill, Acting Secretary
SUBJECT:
STAFF REQUIREMENTS - SECY-96-202 - DRAFT STANDARD REVIEW PLANS ON' ANTITRUST AND FINANCIAL QUALIFICATIONS AND DECOMMISSIONING FUNDING ASSURANCE The Commission has approved publication of the draft Standard Review Plans (SRP) on Antitrust and Financial Qualifications and Decommissioning Funding Assurance for a 75-day comment period subject to incorporation of the comments below and the editorial corrections noted in the attachment.
(EDO)
(SECY Suspense:
12/20/96)
The-staff should add clarifying statements to Section I, Areas of Review, of the SRP on Financial Qualifications and Decommissioning Funding Assurance and to the introduction of the SRP on Antitrust that indicate the SRPs, as presented reflect current regulation and policy, and will be updated to reflect changes to regulations resulting from responses to the Advanced Notice of Proposed Rulemaking and the Draft Policy Statement.
The Federal Reaister Notice should clearly state that the SRPs are being published to obtain public comments and do not reflect the Commission's final positions.
Attachment:
As stated cc:
Chairman Jackson Commissioner Rogers Commissioner Dicus Commissioner Dia:
I 7
Commissioner McGaffigan OGC h-()3 OCA OIG Office Directors, Regions, ACRS, ACNW, ASLBP (via E-Mail)
SECY NOTE:
THIS SRM, SECY-96-202, AND THE VOTE SHEETS OF ALL COMMISSIONERS WILL BE MADE PUBLICLY AVAILABLE 5 WORKING DAYS FROM THE DATE OF THIS SRM.
l hl-- h 38 A/
9612170178 961119 F
i i
I I
Editorial Corrections to Attachment 2 of SECY-96-202 1
Page Correction-Abstract In line 8, place a comma after " permits."
In line 10, change " licenses" to " licensees."
v Add abbreviation for EPACT - ???
Add abbreviation for SEC - Securities and Fnchange Commission i
vi In first line of third paragraph, the "T"
should be lowercase.
1-2 In line 3 of last paragraph, remove apostrophe from
+
"1970s."
l I
1-3 In line 5 of first paragraph, change "from" to "to."
In the next line, remove "to."
1-4 In line 4, change the period after "same" to a colon.
Change the next word of each subparagraph to " [t] he. "
2-1 In line 1 of the second paragraph, replace "his" with "such an."
2-7 In line 8 of the second paragraph, add " case" after 4
"(1977))" and before the comma.
In line 9, insert "in the" after " decisions" and remove the comma at the end
)
i of the line.
2-8 In line 6 of the second paragraph, delete the comma after "Farley."
2-9 In line 3 of the second paragraph, delete the "s" on
" invites."
1 3-3 In line 9 under section 3.3.1, delete the comma after "of."
In line 7 of the last paragraph, provide a citation for the reference.
3-4 In line 5 of the first paragraph, insert "a" after "from."
In line 6, delete the "a."
a 3-5 In line 5 of the first paragraph, delete the "s" in
" conditions."
4-4 Place a semi-colon at the end of items (1) and (2).
J 4-5 Place "; and" at the end of item (3) and a period at the und of item (4)
At the bottom of the page, place i
a semi-colon at the end of item (1) 4
l e
r Page Correction 4-6 Place semi-colons at the end of items (2) and (3).
Place "; and" at the end of item (4) and a period at the end of item (5).
4-7 Place a semi-colon at the end of item (1) l 4-8 Place "; and" at the end of item (2) and a period at l
the end of item (3).
l l
l l
l l
l l
l l
l i
l i
i a
1
_