ML20132B052

From kanterella
Jump to navigation Jump to search
Forwards SE Re Temporary Relief from ASME Code Section 11 Requirements to Repair Flaws in Essential Cooling Water Sys Piping
Date released: 05/25/2020 Download: ML20132B052


Safety Evaluation Accepting Licensee Structural Integrity & Operability Assessments
ML20132B056
Person / Time
Site: South Texas STP Nuclear Operating Company icon.png
Issue date: 12/11/1996
From:
NRC (Affiliation Not Assigned)
To:
References
Download: ML20132B056 (6)
Forwards SE Re Temporary Relief from ASME Code Section 11 Requirements to Repair Flaws in Essential Cooling Water Sys Piping
ML20132B049
Person / Time
Site: South Texas STP Nuclear Operating Company icon.png
Issue date: 12/11/1996
From: Beckner W
NRC (Affiliation Not Assigned)
To: COTTLE W T
HOUSTON LIGHTING & POWER CO.
References
Download: ML20132B049 (3)