Amend to Final Potential Significant Deficiency Rept SD-42 Re Incorrectly Crimped Main Control Board Termination Lugs. Initially Reported on 850829.Seismic Testing Performed on Samples.Problem Not Reportable
ML20132A892
Person / Time
Site: Millstone Dominion icon.png
Issue date: 09/06/1985
From: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
F0206A, F206A, SD-42, NUDOCS 8509260047
Download: ML20132A892 (2)


Text

o NORTHEAST tfTILITIES o.nor. Omc... seio.n sir i. sornn. conn.cucui tog ComECTCyt #.NO Poet.CC.8P m' l

.w..

u.c uns sucw ccw='

P.O. BOX 270

- " ****"* ma'*cc"**'

HARTFORD, CONNECTICUT 06141-0270 k

L J

(("d,Ci"w'.,,',

(203) 665-5000 September 6,1985 Docket No. 50-423 F0206A Dr. Thomas E. Murley, Regional Administrator U.S. Nuclear Regulatory Commission Region 1 631 Park Avenue King of Prussia, PA 19406

Reference:

(1)

W.G. Counsil letter to T.E. Murley, B10906, dated September 29,1983.

Dear Dr. Murley:

Millstone Nuclear Power Station, Unit No. 3 Reporting of Potential Significant Deficiencies in Accordance with 10CFR50.55(e)

Main Control Board Termination Lugs (SD-42)

In an August 29, 1983 telephone conversation between your Mr. T. Rebelowski and our Mr. A.K. Gulesserian, Northeast Nuclear Energy Company (NNECO) reported a potential significant deficiency in the construction of Millstone Unit No. 3 in accordance with 10CFR50.55(e).

As noted in Reference (1), the potential significant deficiency involved the main control board in which various terminations performed by Reliance Electric Company had incomplete or incorrectly crimped lugs. It was also discovered that lugs sized for 16-14 AWG were used to terminate 20 AWG resistor leads on Cutler-Hammer type E30

. switches and Stanwick terminal blocks.

The purpose of this letter is to amend our final report for SD-42.

In Reference (1), NNECO committed to test the listed samples under the seismic qualificatien program for the main control board. Seismic testing was performed on the listed samples and the samples passed the test with no anomalies noted.

Test results were documented in the seismic test report (SQP-99X2087) issued by Reliance Electric Company and approved by Stone & Webster Engineering Corporation and NNECO.

8509260047 850906 PDR ADOCK 05000423 S

PM

)

' h s *1 i

._ As such, we consider this not to_' constitute a significant deficiency in accordance with 10CFR50.55(e).

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY N

F /LA

3. F. Opel4t_J O

Senior Vice President t

I cc:

Mr. 3.M. Taylor, Director Division of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 i