ML20132A481
| ML20132A481 | |
| Person / Time | |
|---|---|
| Site: | 07000938 |
| Issue date: | 12/10/1996 |
| From: | Weber M NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| To: | Masse F MASSACHUSETTS INSTITUTE OF TECHNOLOGY, CAMBRIDGE |
| References | |
| NUDOCS 9612160101 | |
| Download: ML20132A481 (3) | |
Text
i s
"4 UNITED STATES g
i NUCLEAR REGULATORY COMMISSION
!f WASHINGTON, D.C. 20555-0001
%...../
December 10, 1996 Mr. Frank X. Mass 6, Director MIT Radiation Protection Programs Massachusetts Institute of Technology 77 Massachusetts Avenue, Room 20C 207 Cambridge, Massachusetts 02139
SUBJECT:
REORGANIZATION OF DIVISION OF FUEL CYCLE LICENSING BRANCH
Dear Mr. Mass 6:
This letter is to inform you that effective November 18, 1996, the Branch Chief for Fuel Cycle Licensing Branch is Mr. Michael F. Weber. Mr. Weber can be reached at (301) 415-7190.
The Section Chief for Licensing Section 1 is Ms. Mary T. Adams.
Ms. Adams can be reached at (301) 415-7249.
All future correspondence should be addressed as follows:
)
Mailing envelope:
(Express Letters)
(Standard Letters)
Recipient U.S. Nuclear Regulatory Commission Licensing Branch (T8014)
Document Control Room Division of Fuel Cycle Safety Washington, DC 20555 and Safeguards, NHSS U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852 Letters addressed to:
Recipient Licensing Branch (T8014)
Division of Fuel Cycle Safety i
and Safeguards Office of Nuclear Materials Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555 h
a 9612160101 961210 PDR ADOCK 070009 8
o 1
I Mr. Frank X. Mass 6 2
1 Mr. Ed Flack has been assigned as Project Manager for your facility.
He can be reached on (301) 415-8115.
Sincerely, Original signed by:
Michael F. Weber, Chief Licensing Branch Division of Fuel Cycle Safety and Safeguards, NMSS Docket 70-938 License SNM-986 Distribution Docket No.70-338 PUBLIC NRC File Center NMSS R/F FCLB R/F FCSS R/F NMSS R/F Region I l
EUllrich, RI EFlack
- G:\\ letters]
i 0FC FCLB C-FCLB N
FCLB M
NAME PShea moS MAdamdfl/YOkMWeber DATE 12///) /96 12//()/96 12/ /# /96 i
i i
i i
l I
4 i
1 J
3 1
1 l
l 1
4
i Mr. Frank X. Mass 6 2
l Mr. Ed Flack has been assigned as Project Manager for your facility.
He can be reached on (301) 415-8115.
i Sincerely, b
9' yon 1
Michael F. Weber, Chief I
Licensing Branch j
Division of Fuel Cycle Safety and Safeguards, NHSS j
' Docket 70-938 j
License SNM-986 i
I 4
s
+
1 I
i d
i i
-