ML20132A457
| ML20132A457 | |
| Person / Time | |
|---|---|
| Site: | 07001374 |
| Issue date: | 12/10/1996 |
| From: | Weber M NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| To: | Vivian Dean IDAHO STATE UNIV., POCATELLO, ID |
| References | |
| NUDOCS 9612160091 | |
| Download: ML20132A457 (3) | |
Text
.
'b e no uq$%
UNITED STATES p
y
,j NUCLEAR REGULATORY COMMISSION o
't WASHINGTON, D.C. 20555 4001
)
k, 8
December 10, 1996 1
..... o
\\
l Dr. V. Charyulu, Dean College of Engineering Idaho State University ISU Box 8060 Pocatello, Idaho 83209
SUBJECT:
REORGANIZATION OF DIVISION OF FUEL CYCLE LICENSING BRANCH
Dear Dr. Charyulu:
This letter is to inform you that effective November 18, 1996, the Branch Chief for Fuel Cycle Licensing Branch is Mr. Michael F. Weber. Mr. Weber can be reached at (301) 415-7190.
The Section Chief for Licensing Section 1 is Ms. Mary T. Adams.
Ms. Adams can be reached at (301) 415-7249.
3 All future correspondence should be addressed as follows:
Mailing envelope:
(Express Letters)
(Standard Letters)
Recipient U.S. Nuclear Regulatory Commission Licensing Branch (T8D14)
Document Control Room Division of Fuel Cycle Safety Washington, DC 20555 and Safeguards, NMSS U.S. Nuclear' Regulatory Commission One White Flint North 11555 Rockville Pike 4
l Rockville, MD 20852 Letters addressed to:
Recipient Licensing Branch (T8014)
Division of Fuel Cycle Safety and Safeguards Office of Nuclear Materials Safety and Safeguards U.S. Nuclear Regulatory Commission h
Washingtoa, DC 20555 f
pob 9612160091 '.'61210 PDR ADOCK 07001374 C
PDR 0
\\t 130073 1
j I
Dr. V. Charyulu 2
Mr. Ed Flack has been assigned as Project Manager for your facility. He can be reached on (301) 415-8115.
4 Sincerely, l
Original signed by:
4 Michael F. Weber, Chief Licensing Branch Division of Fuel Cycle Safety and Safeguards, NMSS Docket 70-1374 License. SNM-1373 Distribution Docket 70-1374 PUBLIC NRC File Center NMSS R/F FCLB R/F FCSS R/F NMSS R/F Region IV EFlack
- G:\\ letters]
0FC FCLB b
FCLB h
FCLB N
NAME PShea M MAdakSfh
[MWeber DATE 12//6 /96 12//[/96 12//0 /96 i
w r
9 Dr. V. Charyulu 2
Mr. Ed Flack has been assigned as Project Manager for your facility.
He can be reached on (301) 415-8115.
Sincerely, 1
kl/lal Y
\\
Michael F. Weber, Chief Licensing Branch i
Division of Fuel Cycle Safety and Safeguards, NMSS Docket 70-1374 License SNM-1373