ML20132A436
| ML20132A436 | |
| Person / Time | |
|---|---|
| Site: | 07001703 |
| Issue date: | 12/10/1996 |
| From: | Weber M NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| To: | Greco J EASTMAN KODAK CO. |
| References | |
| NUDOCS 9612160079 | |
| Download: ML20132A436 (3) | |
Text
.
1 0 -/ 70 3
- .a atog y*
t UNITED STATES g
,j NUCLEAR REGULATORY COMMISSION "t
WASHINGTON, D.C. 20556-0001 k.....,/
December 10, 1996 Mr. Joseph M. Greco Radiation Safety Officer Eastman Kodak Company Kodak Park, Building 320 Rochester, New York 14652-3615
SUBJECT:
REORGANIZATION OF DIVISION OF FUEL CYCLE LICENSING BRANCH
Dear Mr. Greco:
This letter is to inform you that effective November 18, 1996, the Branch Chief for 2
Fuel Cycle Licensing Branch is Mr. Michael F. Weber. Mr. Weber can be reached at (301) 415-7190.
The Section Chief for Licensing Section 1 is Ms. Mary T. Adams.
Ms. Adams can be reached at (301) 415-7249.
All future correspondence should be addressed as follows:
Mailing envelope:
(Express Letters)
(Standard Letters)
Recipient U.S. Nuclear Regulatory Commission Licensing Branch (T8014)
Document Control Room Division of Fuel Cycle Safety Washington, DC 20555 and Safeguards, NHSS U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852 i
Letters addressed to:
Recipient Licensing Branch (T8014)
Division of Fuel Cycle Safety and Safeguards Office of Nuclear Materials Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555
/D 9612160079 961210 f
PDR ADOCK 07001703 C
PDR 130066 i
3 Mr. Joseph M. Greco 2
Mr. Craig Hrabal has been assigned as Project Manager for your facility. He can be reached on (301) 415-5424.
Sincerely, Original signed by:
Michael F. Weber, Chief Licensing Branch Division of Fuel Cycle Safety and Safeguards, NMSS Docket. 70-1703 License SNM-1513 Distribution Docket 70-1703
.PUBLIC NRC File Center NMSS R/F FCLB R/F FCSS R/F Region I CHrabal
- G:\\ letters]
0FC FCLB C-FCLB
/E FCLB NAME PShea7)/L6 MAdamIYYO [MWeber DATE 12/10 96 12//0/96 12//d /96
/
i j
t Mr. Joseph M. Greco 2
Mr. Craig Hrabal has been assigned as Project Manager for your facility. He can be reached on (301) 415-5424.
Sincerely,
]V.%ff Michael F. Weber, Chief Licensing Branch Division of _ Fuel Cycle Safety and Safeguards, NMSS Docket 70-1703 License SNM-1513