December 4, 1996 Mr. E. Kraft, Site Vice President Quad Cities Station Commonwealth Edison Company i
22710 206th Avenue Norti Cordova, IL 61242
Dear Mr. Kraft:
Enclosed for your review is the Systematic Assessment of Licensee Performance (SALP) 13 Report for the Quad Cities Nuclear Power Station covering the period l
July 23, 1995, through October 26, 1996. This report will be discussed with you at a public meeting to be held at the Quad Cities Station on December 18,
)
1996, at 10:00 a.m. (CDT).
During this meeting you are encouraged to candidly discuss any comments you may have regarding our report.
1 i
In accordance with Nuclear Regulatory Commission (NRC) policy, I have reviewed the recommendations from the SALP Board assessment and concur with their ratings. The functional areas of plant operations and plant support were rated Category 2; maintenance and engineering areas were rated a Category 3.
It is my view that the conduct of nuclear activities in connection with the Quad Cities facility was adequate. While overall performance improved in some areas, persistent weaknesses in the work control process, material condition, engineering evaluations, and corrective actions limited your progress.
Of particular importance this assessment period was your ability to sustain j
the momentum started last assessment period to improve performance in the area of plant operations.
Improvements in plant operations included better implementation of performance standards, improved procedural adherence, and enhanced trending and investigation of operations performance problems.
j Sustained improvements were also demonstrated in radiation protection, particularly with ALARA planning and plant water chemistry.
In addition, progress was made toward improving the material condition of the station through modification and repair of selected systems. Your initiatives to i
improve the residual heat removal service water, control rod drive, feedwater, and electro-hydraulic control systems were notable. The decision to keep i
Unit 1 shut down for an additional 90 days and Unit 2 shut down for 75 days
/
1 this past summer while restoring safety margins and resolving design related I
}
problems was conservative and clearly focused on' safety. Also noted during
/
l l
this assessment period was your improved self assessment capability across all j
functional areas as a result of lowering the threshold for problem fIghg identification and improving the tracking and trending of problems.
3 y
I 9612160057 961204 PDR ADOCK 05000254 G
PDR I
l i
o e
E. Kraft !
At the end of the previous assessment period, some progress was seen at i
improving engineering support to the station. Of note during this assessment i
period was the contribution engineering made regarding material condition improvements and resolving design problems. However, a number of examples i
this period indicate that the expected engineering performance level was not l
achieved.
Specifically, narrow root ause evaluations for multiple failures i
of safety systems, inadequate corrective actions for long-standing deficiencies with structural support of safety systems, and weak understanding of plant design associated with your proposed restart after the May 1996 severe storm demonstrated that continued management attention is required to foster improved performance. These examples weighed heavily in our assessment and supported the Category 3 rating in engineering.
i Station performance continued to be challenged by weaknesses in safety system performance, work control, supervisory oversight, and the quality of maintenance activities. These same concerns were noted as weaknesses in the last assessment period and contributed to the repeat Category 3 ratir,g in maintenance.
At the SALP meeting you should be prepared to discuss our assessments and your plans to improve performance in the maintenance and engineering areas in particular, and in other areas where weaknesses are discussed in the enclosed SALP report. Additionally, you are requested to respond in writing within 30 days after the meeting, specifically addressing corrective actions planned to improve your performance in the maintenance and engineering areas.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter will be placed in the NRC's Public Dt.cument Room.
Should you have any questions concerning the SALP report, we would be pleased to discuss them wi?.h you.
Sincerely,
/s/A. Bill Beach A. Bill Beach Regional Administrator Docket No. 50-254 Docket No. 50-265
Enclosure:
SALP 13 Report No. 50-254;265/96001
!NdEbh:0Ch*lt sm..
c - c., m m s.ss-nf.-i c - con ws
.ss-nf.=i n-0FFICE RIII NRR RIII RIII RIII RI/)
NAME Hiland Capra Caniano Clayton Caldwell Bdahh DATE 11/ /96 11/ /96 11/ /96 11/ /96 11/ /96 1&/ 4 /96 See attached distribution 0FFICIAL RECORD COPY
_o_._.
l E. Kraft i l
Distribution Continued:
Chairman, Illinois Commerce i
Commission J. R. Bull, Vice President, General &
Transmission, MidAmerican Energy Company l
Document Control Desk-Licensing l
INPO Chairman Jackson Commissioner Rogers Commissioner Dicus Commissioner Diaz Commissioner McGaffigan OEDO J. Lieberman, Director, Office of Enforcement F. J. Miraglia Jr., Acting Director, NRR R. Zimmerman, Associate Director for Projects, NRR A. C. Thadani, Acting Deputy Director, NRR i
J. W. Roe, Director, Division of Reactor Projects III/IV, NRR l
R. A. Capra, Director, Project Directorate III-2, NRR R. M. Pulsifer, Quad Cities Project Manager, D. L. Gamberoni, SALP Program Manager, NRR (2 copies)
DRP Division Directors, All Regions R. J. Caniano, RIII L. Cox, RIII Docket File1w/ enc 1h(
/ enc 1 Project Manager, NRR w/ enc 1 PUBLIC IE DRP w/ encl OC/LF w/ enc 1 SRI Quad Cities, Dresden, l
RAC1 (E-Mail)
LaSalle w/ enc 1 l
A. B. Beach, w/ enc 1 B. L. Burgess, w/ enc 1 W. L. Axelson, w/ enc 1 b %'7/Qh""
d M h*?..
c-c,e
/.-ic-c win..
/.-i M
=-
i 0FFICE RIII E
NRR F-RIII E
RIII E
RUI RIII l
PW Caniano@ Y ClaytonAi h4 hell Beach NAME Hiland M Capra Wa Tp 6c e s u Ven c w'ai {
vi e cea e i W
j DATE 11/X/96 11/.n~/96 11/.2r/96 11/#/96 M/A996 11/ /96 f
0FFICIAL RECORD COPY n
4 E. Kraft Distribution cc w/ enc 1:
l D. A. Sager, Vice President, Generation Support H. W. Keiser, Chief Nuclear Operating Officer L. W. Pearce, Station Manager N. Chrissotinos, Regulatory Assurance Supervisor.
C. C. Peterson, Regulatory Affairs Manager
' I. Johnson, Acting Nuclear Regulatory Services Manager Richard Hubbard Nathan Schloss, Economist Office of the Attorney General State Liaison Officer Chairman, Illinois Cramerce Commission J. R. Bull, Vice President, General &
Transmission, MidAmerican Energy Company Document Control Desk-Licensing INPO Chairman Jackson i
Commissioner Rogers Commissioner Dicus Commissioner Diaz Commissioner McGaffigan OEDO J. Lieberman, Director, Office of Enforcement F. J. Miraglia Jr., Acting Director, NRR R. Zimmerman, Associate Director for Projects, NRR A. C. Thadani, Acting Deputy Director, NRR J. W. Roe, Director, Division of Reactor Projects III/IV, NRR R. A. Capra, Director, Project Directorate III-2, NRR R. M. Pulsifer, Quad Cities Project Manager, D. L. Gamberoni, SALP Program Manager, NRR (2 copies)
DRP Division Directors, All Regions M. N. Leach, RIII L. Cox, RIII Docket File w/ enc 1 Project Manager, NRR w/ enc 1 PUBLIC IE-01 w/ enc 1 DRP w/ enc 1 OC/LFDCB w/ encl SRI Quad Cities, Dresden, RACI (E-Mail)
LaSalle w/ enc 1 A. B. Beach, w/ enc 1 B. L. Burgess, w/ enc 1 W. L. Axelson, w/ enc 1 j
...