ML20132A373

From kanterella
Jump to navigation Jump to search
Potential Significant Deficiency Rept SD-81 Re Structural Steel Connections in Main Steam Valve Bldg.Initially Reported on 850510.Connections in Other QA Category 1 Bldgs Being Sampled.Next Rept Will Be Submitted by 850912
ML20132A373
Person / Time
Site: Millstone Dominion icon.png
Issue date: 08/29/1985
From: Mroczka E, Opeka J
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
F0811A, F811A, SD-81, NUDOCS 8509250324
Download: ML20132A373 (2)


Text

>

=/e N UTILITIES o.nor.i On.c... s.io.n stre.t. s.ri.n. connect cut 9

N Es c$==

P O. BOX 270 x m.ce m.a c~~

HARTFORD. CONNECTICUT 06141-0270 L

J CO/.[$".717%*.',

(203) 665-5000 August 29, 1985 Docket No. 50-423 F0811A Dr. Thomas E. Murley Regional Administrator U.S. Nuclear Regulatory Commission Region 1 631 Park Avenue

~ King of Prussia, PA 19406

References:

(1) 3.F. Opeka to T.E. Murley, F0754A, dated May 10, 1985.

(2) 3.F. Opeka to T.E. Murley, F0777A, dated July 11,1985.

Dear Dr. Murley:

Millstone Nuclear Power Station, Unit No. 3 Reporting of Potential Significant Deficiencies in Accordance with 10CFR50.5S(e):

Structural Steel Connections in the Main Stream Valve Building (SD-81)

In an April 12,1985 telephone conversation between your Mr. T. Rebelowski and our Mr. P.J. Quinlan, Northeast Nuclear Energy Company (NNECO) reported a potential significant deficiency in the construction of Millstone Unit No. 3 in accordance with 10CFR50.55(e).

As noted in Reference (1), the potential significant deficiency involved structural steel connections in the Main Steam Valve Building (MSVB).

During the NRC Construction Appraisal Team inspection at Millstone Unit No. 3, a concern was identified regarding undersized fillet welds on the clip angics for three (3) W14 x 68 beams welded to embedded plates for the structural steel installation in the MSYB. Further concerns were identified with beams utilizing fixed end and slotted connections. The inspection also revealed beams with slotted connections to have bolts tensioned beyond the finger-tight requirement of the design drawing.

As noted in Reference (2), NNECO determined this to be a significant deficiency in accordance with 10CFR50.55(e). NNECO also noted that these conditions are expected to be limited to the MSVB. The sampling of connections in other QA Category 1 Buildings is still being performed to verify this.

8509250324 850829 PDR ADOCK 05000423 S

PDR O

g

r

e. As such, we are not able to provide a final report at this time. We will provide an update on this matter by September 12,1985.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY T.F Oc>exa 3.F. Opeka Senior Vice President 4

lu By: E.3. Mropped

(/

Vice Presider #

cc:

Mr. 3.M. Taylor, Director Division of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555