NRC-20-0034, Notification of Intention Regarding NRC Inspection Report 05000341/2020403; EA-19-138

From kanterella
(Redirected from ML20132A244)
Jump to navigation Jump to search
Notification of Intention Regarding NRC Inspection Report 05000341/2020403; EA-19-138
ML20132A244
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 05/11/2020
From: Peter Dietrich
DTE Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
EA-19-138, NRC-20-0034 IR 2020403
Download: ML20132A244 (2)


Text

Peter Dietrich Senior Vice President and Chief Nuclear Officer DTE Energy Company 6400 N. Dixie Highway, Newport, Ml 48166 Tel: 734.586.4153 Fax: 734.586.1431 Email: peter.dietrich@dteenergy.com May 11 , 2020 DTE EA-19-138 NRC-20-0034 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Fermi 2 Power Plant NRC Docket No. 50-341 NRC License No. NPF-43

Subject:

Notification oflntention Regarding NRC Inspection Report 05000341/2020403; EA-19-138

References:

1) Fermi Power Plant, Unit 2 - Secmity Baseline Inspection Report 05000341/2020403 ; NRC Investigation Repo1i No. 3-2019-004 and Apparent Violations (ML20120A443)

In Reference 1, the Nuclear Regulatory Commission (NRC) documented tlu-ee apparent violations against DTE Electric Company (DTE) that it is considering for escalated enforcement action in accordance with the NRC Enforcement Policy. Also in Reference 1, the NRC concluded that the apparent violations have very low security significance (green). The NRC letter provided DTE with the opportunity to (1) request a Pre-Enforcement Conference (PEC),

(2) participate in Alternative Dispute Resolution (ADR) or (3) to submit a written response to the NRC regarding the apparent violations. DTE appreciates the opportunity to respond to the NRC on this issue. Mr. Steven O1ih, Division of Reactor Safety, was verbally notified on May 7, 2020 of DTE's intent to submit a written response on this matter and not to request a PEC or participate in ADR. This letter further documents that DTE intends to submit our position on the proposed findings and apparent violations to the NRC in writing, as allowed by the NRC in Reference 1. As the letter was received by DTE on April 29, 2020, DTE will respond to the NRC ' s apparent violations within 30 days ofreceipt, which is by May 29, 2020.

No new commitments are being made in this submittal.

Should you have any questions or require additional information, please co Ms. Margaret Offerle, Manager - Nuclear Licensing, at (734) 586-507 --=~-

Sincerely, Peter Dietrich Senior Vice President and Chief Nuclear Officer

USNRC NRC-20-0034 Page 2 cc: NRC Project Manager NRC Resident Office Regional Administrator, Region III Mr. David Curtiss, Acting Director, Division of Reactor Safety