ML20129K133
| ML20129K133 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 12/21/1988 |
| From: | Decker T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Hairston W GEORGIA POWER CO. |
| Shared Package | |
| ML20129K135 | List: |
| References | |
| NUDOCS 9611080173 | |
| Download: ML20129K133 (2) | |
See also: IR 05000321/1988035
Text
{{#Wiki_filter:, _ .R M-s5 . ' "% i. 3 NUCLEAR REGULATORY COMMISSION i ' ' '
- h
[ REGION 11 3 , 101 MARtETT A ST N W. } e,,,. f ' i , ., ATLANTA, GEORGIA 30323 b $ i $M Docket Hos. 50-321, 50-366 License Nos. DPR-57, NPF-5 Georgia Power Company ATTN: Mr. W. G. Hairston,111'
Senior Vice President - Nuclear Operations ! P. O. Box 1295 Birmingham, AL 35201 , Gentlemen: < SUBJECT: NOTICE OF VIOLATION (NRC INSPECfl0N REPORT N05. 50-321/88-35 AND 50-366/88-35) This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by G. B. Kuzo on October 31-November 3, 1988. The inspection included a review of activities mithorized for your Hatch facility. At the conclusion of the , inspectior. he findings were discussed with those members o? your staff
identified in the enclosed inspection report. , Areas examined during the inspection are identified in the report. Within . , these areas, the inspection consisted of selective examinations of procedures , and representative records, interviews with personnel, and observation of
activities in progress.
The inspection findings indicate that certain activities appeared to violate
NRC requirements. The violation, references to pertinent requirements, and ' elements to be included in your response are described in the enclosed Notice of Violation. In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosures will be placed in the NRC Public Document Room. The responses directed by this letter and its enclosures are not subject to the clearance procedures of the Office of Management and Budget as required by the , Paperwork Reduction Act of 1980, PL 96-511. . fj l Od I 9611080173 881221 I PDR ADOCK 05000321 i G PDR _ -- -- -- Y
i < ,
. Georgia Power Company 2 g Should you have any questions concerning this letter, please contact us. Sincerely, M k -{*o Thomas R. Decker, Acting Chief Emergency Preparedness and Radiological Protection Branch Division of Radiation Safety and Safeguards Enclosures: 1. Notice of Violation 2. NRC Inspection Report cc w/encls: R. P. Mcdonald, Executive Vice President, Nuclear Operations J. T. Beckham, Vice President, Plant Hatch H. C. Nix, General Manager, Plant Hatch 0. M. Fraser, Site Quality Assurance Manager L. T. Gucwa, Manager, Nuclear Safety and Licensing, Plant Hatch J. P. Kane, Manager, Licensing and Engineering S. B. Tipps, Manager of Nuclear Safety and Compliance State of Georgia i }}