ML20129K122
| ML20129K122 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 11/05/1996 |
| From: | Grant G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Myers L CLEVELAND ELECTRIC ILLUMINATING CO. |
| Shared Package | |
| ML20129K124 | List: |
| References | |
| NUDOCS 9611080167 | |
| Download: ML20129K122 (2) | |
See also: IR 05000440/1996013
Text
N
t
s
November 5, 1996
Mr. Lew W. Myers
Vice President - Nuclear -
- Centerior Service Company
P.O.' Box 97, A200
Perry, OH .44081
~ SUBJECT:
. NRC ROUTINE RADIATION PROTECTION INSPECTION REPORT NO.
50-440/96013(DRS)
Dear Mr. Myers:
- This refers to the inspection conducted by Ms. K. Selburg and Mr. P. Louden of this office
on October 7-11,1996, of activities authorized for your Perry Nuclear Power Plant, Unit 1,
.
..f acility. The focus of this inspection was on your radiation protection program. At the
conclusion of the inspection, the findings were discussed with those members of your
staff identified in the enclosed report.
.
Areas examined during the inspection are identified in the report. Within these areas, the
inspection consisted of selective examinations of procedures, representative records and
'
interviews with personnel.
Several good ALARA initiatives were used during the refueling outage, including the use of
I
temporary shielding, system and component flushing, and chemical decontaminations
which contributed to significant dose savings. The initial outage planning incorporated the
]
ALARA principle and was effective in planning dose estimates which accurately
'
represented actual work. However, when conflicts in the outage schedule were
encountered, contingency planning was weak in reevaluating new ALARA challenges,
caused by a delay in the chemical decontamination of the reactor recirculation system.
The inspectors also noted that poor planning and pre-job briefing in a non-outage job
contributed to workers spending more time than necessary in a high radiation area.
No violations of NRC requirements were identified during the course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter
and the enclosures will be placed in the NRC Public Document Room.
l
9611000167 961105
g
ADOCK 05000440
e
em
,
i
r
.
.
..
-
.
.
- ..
.
.-
-
-.
v
s
November 5, 1996
L. W. Myers
2
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
Original Signed by Brent Clayton (for)
Geoffrey E. Grant, Director
Division of Reactor Safety
Docket No. 50-440
Enclosure:
Inspection Report No.
50-440/96013(DRS)
cc w/ encl:
J. P. Stetz, Senior Vice
President - Nuclear
L. W. Worley, Director, Nuclear
Services Department
J. D. Kloosterman, Manager,
Regulatory Affairs
W. R. Kanda, Director, Perry
Nuclear Assurance Department
N. L. Bonner, Director, Perry
Nuclear Engineering Department
H. Ray Caldwell, General Superintendent
Nuclear Operations
R. D. Brandt, General Manager Operations
Terry L. Lodge, Esq.
State Liaison Officer, State of Ohio
Robert E. Owen, Ohio Department of Health
C. A. Glazer, State of Ohio
Public Utilities Commission
Distribution:
Docket File w/enci
DRS w/enct
A. B. Beach, Ritl w/ encl
PUBLIC4ted w/ encl
Rlli PRR w/enci
Enf. Coordinator, Rlli w/enci
OC/LFDCB w/enct
SRI, Perry w/enci
CAA1 (E-mail) w/enci
DRP w/enct
LPM, NRR w/ enc!
W. L. Axelson, Rlll w/enci
DOCUMENT NAME: G:DRS\\PER96013.DRS
To receive a copy of this document, indicate in the box "C" = Copy w/o attach /enci "E" = Copy w/ attach /enci *N" = No copy
0FFICE
RIII
l6
Rill
,, l ,
Rlll
l
RIII
lc
[ur
on/gg
NAME
,
DATE
10/Jl /9V
.M/ / /96 /
1 0/4 /96 "
10/r /96
0FFICIAL RECORD COPt