Notifies of Change in Schedule for Implementation of Required Station Procedures.All Procedures Required for Station Operation Will Be in Place at Least 90 Days Prior to Fuel Load.Fsar Will Be Revised in Amend 12
ML20129K098
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 07/19/1985
From: Mittl R
Public Service Enterprise Group
To: Butler W
Office of Nuclear Reactor Regulation
References
NUDOCS 8507230384
Download: ML20129K098 (3)


Text

_ _ _ _ _ _ _ _.

4 Pubke Serv +ce E Eintrtc arx1 Gas a Company 80 Park Pl.ua, Newark, NJ 01101/ 201430 8217 MAILING ADDRESS / P.O. Box 670, Newark, NJ 07101 Robert L. Mitti General Monart Nuclear Assurance and Rmulation July 19, 1985 Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 7920 Norfolk Avenuo Bothesda, MD 20814 Attention:

Mr. Walter Butler, Chief Licensing Branch 2 Division of Licensing Gentlemont ilOPE CREEK GENERATING STATION DOCKET NO. 50-354 STATION PROCEDURE IMPLEMENTATION Pursuant to NRC issuanco of an operating licenso for the llopo Crook Generating Station, Public Service Electric and Gas Company (PSE&G) hereby provides notico to the NRC staff of the following change in schedule for the implementation of required station procedures.

Procedures for activities nooded to support system turnover to llope Creek Operations will be in place prior to implomontation of said activi-ties.

All procedures required for station operation will be in place at least ninoty (90) days prior to fuel load.

The llope Crook Final Safoty Analysis Report (FSAR) will be revised accordingly as shown in the attached, in the next scheduled FSAR Amendment (Amendment 12).

Should you have any questions in this regard, please contact us.

Very truly yours, 4' ~/

nmnge A

Enclosure

' I The Energy People Y. 4'll) I1% 7 8 )

O i

Director of Nuclear Reactor Regulation 2

7/19/85 C

D. H. Wagner USNRC Licensing Project Manager A.

R.

Blough USNRC Senior Resident Inspector DE21 1/2

,o NCGS FSAR 5/85 u.

Regulatory Guide 1.144, Auditing Quality Assurance Programs for Nuclear Power Plants v.

Regulatory Guide 1.146, Qualification of Quality Assurance Program Audit Personnel for Nuclear Power Plants w.

BTP 9.5-1, Appendia A, Guidelines for Fire Protection for Nuclear Plants Docketed Prior to July 1, 1976.

Commitments to Regulatory Guides, with respect to revision level, exceptions, etc, are contained in Section 1.8.

L i

i Substantive changes to the quality assurance program described i

herein will be submitted to the NRC within 30 days of implementation.

Monsubstantive changes will be identified in the annual PSAR updates.

The overall quality assurance program is described in the nuclear department manual.

This description is prepared and maintained by nuclear quality assurance.

PSE&G organizations performing activities affecting nuclear safety prepare and maintain implementing procedures and instructions.

These procedures and instructions, and subsequent revisions thereto, are subject to NOA review and approval to the entent necessary to verify compliance with the quellty assurance l

program and the applicable quality-related Regulatory Guides and standards identifled above.

N04 will monitor the preparation and issuance of required procedur g o, assure that they are in place The general manager - Nope Creek operations has instituted and will maintain an administrative procedures (AP) manual for Hope i

Creek Generating Station (MCGS).

Thestationadministrativeproceduresandallsubs1uent l

revisions thereto are prepared by the technical sta f, are i

1 reviewed by the Technical Engineer, Technical Manager, NQA and SORC, and are approved by the General Manager - Hope Creek Operations.

% mplew+ S / %Ab<s *o N $ 5*ffY pvror scA.,u,,_+, m A dw/ A/ d/ W tvecA4ap w in p/ w