ML20129K092
| ML20129K092 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 07/10/1995 |
| From: | Bowerman B BROOKHAVEN NATIONAL LABORATORY |
| To: | Jennifer Davis NRC (Affiliation Not Assigned) |
| Shared Package | |
| ML20129K094 | List: |
| References | |
| CON-FIN-E-2089 NUDOCS 9611080133 | |
| Download: ML20129K092 (1) | |
Text
s b
~ J F i BROOKHAVEN NATIONAL LABORATORY
[4*E":
l' ASSOCIATED UNIVERSITIES,INC.
';C P.O. Box 5000 Upton, New York 11973-5000 TEL (516) 282 2946 FAX (516) 282 4486
{
Department of Advanced Technology E-MAIL July 10,1995 l
i Mr. James Davis Mail Stop 7D4 i
NRR/DE/EMC U.S. Nuclear Regulatory Commission Washington, DC 20555 i
Dear Mr. Davis,
Enclosed is the final report documenting testing and characterization of two stud bolts and four nuts, as called for under Task 9 of Job Code E-2089. These fasteners are in compliance with applicable material standards, and pass System 21 and System 22 dimensional gaging methods. This completes the work under Task 9.
If you have any questions or comments, please contact me at the above number.
Sincerely,
.?
l.
i
/
Biays S. Bowerman l
Materials Characterization and Innovative Technologies Group cc:
C. J. Czajkowski B. Grenier, NRC M. Bonner osoooa fp t
o(
EE A etR5tc B't 0;#
C AE.E E*GOE TU/u 9611080133 950710
[ C - l " )y a
PDR TOPRP EXIBNL C