ML20129J800

From kanterella
Jump to navigation Jump to search
Forwards Response to Insp Rept 50-341/85-23 on 850501-02. Response Withheld
ML20129J800
Person / Time
Site: Fermi 
Issue date: 07/03/1985
From: Jens W
DETROIT EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NE-85-0398, NE-85-398, NUDOCS 8507230355
Download: ML20129J800 (1)


Text

l wryne H. J ns 1

Vice Pressdent i

Nuclear Operat ons Detrol,t

"-2 6400 North Dme Highway July 3, 1985 ISOn (Ne* pori. uenigan 4aise 3133 s86-415 NE-85-0398 Mr. James G. Keppler Regional Administrator Region III U. S.' Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

Reference:

Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-33

Subject:

Detroit Edison Response Inspection Report 50-341/85023 This letter responds to the item of noncompliance described in your Inspection Report No. 50-341/85023.

This inspection was conducted by Mr.

J.

L.

Belanger of NRC Region III on May 1 and 2, 1985.

The item of noncompliance is discussed in this reply as required by Section 2.201 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations.

We trust this letter satisfactorily responds to the non-compliance cited in the inspection report.

If you have questions regarding this matter, please contact Mr. Lewis Bregni, (313) 586-5083.

Sincerely, e

(

cc:

(*With attachment)

P.

M.

Byron

  • N. J. Chrissotimos J.

R. Creed

  • USNRC, Document Control Desk

,(,[O' Washington, D.C.

20555

/

8507230355 850703 ^

0 PDR ADOCK 05000341 M

G PDR-WHEN SEPARATED FROM ENCLOSURES, HANDLE THIS DOCUMENT AS DECONTROLLED.

i