ML20129J388

From kanterella
Jump to navigation Jump to search
Forwards LERs 83-079/03L-0 & 83-080/03L-0
Date released: 05/22/2020 Download: ML20129J388


/03L-0:on 830817,during A/B Diesel Generator Operability Test,Generator Would Not Trip.Caused by Open Solenoid Valve Coil.Coil Replaced
ML20129J408
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 09/14/1983
From: Palmer R
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
References
Download: ML20129J408 (1)
Forwards LERs 83-079/03L-0 & 83-080/03L-0
ML20129J384
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 09/14/1983
From: Will Smith
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML20129J384 (1)