Forwards QA Program Insp Rept 99901006/85-01 on 850429-0502 & Notice of Nonconformance
ML20129J186
Person / Time
Issue date: 07/17/1985
From: Zech G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Matt Thomas
A&G ENGINEERING
Shared Package
ML20129J190 List:
References
REF-QA-99901006 NUDOCS 8507220340
Download: ML20129J186 (3)


See also: IR 05000429/2005002

Text

-

8

!n a asa

%,

o

UNITED STATES

NUCLEAR REGULATORY COMMISSION

t j wAsHiNoToN, D. C. 20555

k * * . . . ,/

July 17, 1985

Docket No. 99901006/85-01

A&G Engineering Co. II, Inc.

ATTN: Mr. Marvin Thomas

President

4640 E. LaPalma Avenue

Anaheim, California 92806

Gentlemen:

This refers to the inspection conducted by Ms. Nancy J. Miegel of this office

on April 29- May 2,1985, of your facility in Anaheim, California, and to the

discussions of our findings with you and members of your staff at the conclusion

of the inspection.

This inspection was performed as the result of an allegation made to the NRC

concerning inadequate implementation of the A&G Engineering Co. II, Inc. (A&G)

quality assurance program. The allegation was not substantiated. Areas examined

during the inspection and our findings are discussed in the enclosed report.

Within these areas, the inspection consisted of an examination of procedures and

representative records, interviews with personnel, and observations by the

,

inspector.

During the inspection it was found that the implementation of your QA program

failed to meet certain NRC requirements. Significant findings include a failure

to provide objective evidence to support and/or substantiate the decision to

'

accept a vendor as a qualified supplier. The specific findings and references

to the pertinent requirements are identified in the enclosures to this letter.

!

l

Please provide us within 30 days from the date of this letter a written

statement containing: (1) a description of steps that have been or will be

taken to correct these items; (2) a description of steps that have been or

l will be taken to prevent recurrence; and (3) the dates your corrective actions

and preventive measures were or will be completed. Consideration may be given

to extending your response time for good cause shown.

l

'

The responses requested by this letter are not subject to the clearance

procedures of the Office of Management and Budget as required bi ~the Paperwork

Reduction Act of 1980, PL 96-511.

l

4c1

eso72gog0B A #

l 9E

l ho1006 Original document not availatnam tm

certittee w61 o A>LyW0 A dM.,

L

I

.

.

A&G Engineering Co. II, Inc. -2- July 17, 1985

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed inspection report will be placed in the NRC's Public

Document Room.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

.

Gary . ech, ief

Vendor Program Branch

Division of Quality Assurance, Vendor,

and Technical Training Center Programs

Office of Inspection and Enforcement

Enclosures:

1. Appendix A-Notice of Nonconformance

2. Appendix B-Inspection Report 99901006/85-01

,

O

a

..

pgEngineering Co. II, Inc. July 17, 1985

OISTRIBUTION:

DMB:IE:09

VPB Reading

DQAVT Reading

RVollmer

JTCollins

JStone

'

GHolahan,NRR/0RAB

EMerschoff

NJMiegel

Region V

TBurns, BNL

l

VP W.: T / PB:DQAVT PB:DQAVT DM : AVT

.erschoff ch I

Nfd  : sam G

6/) /85 6/2 7/85 fn g /85 }pBG'mes

j/g/85