Text
-
8
!n a asa
%,
o
UNITED STATES
NUCLEAR REGULATORY COMMISSION
t j wAsHiNoToN, D. C. 20555
k * * . . . ,/
July 17, 1985
Docket No. 99901006/85-01
A&G Engineering Co. II, Inc.
ATTN: Mr. Marvin Thomas
President
4640 E. LaPalma Avenue
Anaheim, California 92806
Gentlemen:
This refers to the inspection conducted by Ms. Nancy J. Miegel of this office
on April 29- May 2,1985, of your facility in Anaheim, California, and to the
discussions of our findings with you and members of your staff at the conclusion
of the inspection.
This inspection was performed as the result of an allegation made to the NRC
concerning inadequate implementation of the A&G Engineering Co. II, Inc. (A&G)
quality assurance program. The allegation was not substantiated. Areas examined
during the inspection and our findings are discussed in the enclosed report.
Within these areas, the inspection consisted of an examination of procedures and
representative records, interviews with personnel, and observations by the
,
inspector.
During the inspection it was found that the implementation of your QA program
failed to meet certain NRC requirements. Significant findings include a failure
to provide objective evidence to support and/or substantiate the decision to
'
accept a vendor as a qualified supplier. The specific findings and references
to the pertinent requirements are identified in the enclosures to this letter.
!
l
Please provide us within 30 days from the date of this letter a written
statement containing: (1) a description of steps that have been or will be
taken to correct these items; (2) a description of steps that have been or
l will be taken to prevent recurrence; and (3) the dates your corrective actions
and preventive measures were or will be completed. Consideration may be given
to extending your response time for good cause shown.
l
'
The responses requested by this letter are not subject to the clearance
procedures of the Office of Management and Budget as required bi ~the Paperwork
Reduction Act of 1980, PL 96-511.
l
4c1
eso72gog0B A #
l 9E
l ho1006 Original document not availatnam tm
certittee w61 o A>LyW0 A dM.,
L
I
.
.
A&G Engineering Co. II, Inc. -2- July 17, 1985
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed inspection report will be placed in the NRC's Public
Document Room.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
.
Gary . ech, ief
Vendor Program Branch
Division of Quality Assurance, Vendor,
and Technical Training Center Programs
Office of Inspection and Enforcement
Enclosures:
1. Appendix A-Notice of Nonconformance
2. Appendix B-Inspection Report 99901006/85-01
,
O
a
..
pgEngineering Co. II, Inc. July 17, 1985
OISTRIBUTION:
DMB:IE:09
VPB Reading
DQAVT Reading
RVollmer
JTCollins
- JStone
'
GHolahan,NRR/0RAB
EMerschoff
NJMiegel
Region V
TBurns, BNL