ML20129H884

From kanterella
Jump to navigation Jump to search
Forwards Executed App 7 to Doe/Nrc site-specific Procedural Agreement Re NRC Onsite Representative for Repository Projects During Site Investigation & Characterization,Per 850614 Meeting
ML20129H884
Person / Time
Issue date: 06/20/1985
From: Miller H
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Stein R
ENERGY, DEPT. OF
Shared Package
ML20129H887 List:
References
REF-WM-1 NUDOCS 8507220013
Download: ML20129H884 (1)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

. DISTRIBUTION:

LWM S/F: 3106 WMRP r/f HMSS r/f cf 106/SG/85/06/17 %01985 REBrowning RCook MJBell JGiarratana Mr. Ralph Stein J0 Bunting KGano (0)

Director MRKnapp SBilhorn Engineering and Licensing JTGreeves RJohnson Division HJMiller KStablein Office of Civilian Radioactive RRBoyle RWright Waste Management SCoplan POR Department of Energy JKennedy Washington, DC 20585 JLinehan SGrace & r/f

Dear Mr. Stein:

TVerma PPrestholt Enclosed is the signed Appendix 7 to the DOE /NRC Site Specific Procedural Agreement, the Agreement Concerning the NRC On-Site Representative (OR) for the Repository Projects During Site Investigation and Characterization. Thank you for the cooperation of you and your staff in helping to develop this agreement.

As we agreed in our June 14, 1985 meeting concerning the proposed Appendix 7, it is important that the effectiveness of Appendix 7 should be jointly evaluated once it is in effect for a period of time. This is important in order to assure that Appendix 7 is working as intended and the OR activities continue to benefit both 00E and NRC. Specifically, we should determine whether the language that you proposed and we agreed upon with respect to such things as OR attendance at meetings are having the effects you said were intended (namely, assuring OR has liberal access to DOE activities and documents). I recommend we evaluate the effectiveness of this Appendix and the manner in which it is being implemented in about six months time.

Again, thank you for the cooperation of you and your staff.

Sincerely, a@!KT3,M E Hubert J. Miller, Chief Repository Projects Branch Division of Waste Management Office of Nuclear Material Safety and Safeguards

Enclosure:

yjg mg g,g j Signed Appendix 7 y {1.;3 %,

44 cc: R. Cook P4 ' .

T. Verma U a:

P. Prestholt Il '"'m 0507220013 0S0620 bM PDR WASTE 3

' ' A.

WM-1 PDR F "n "'? '

d

$5GraceSQb $ineh Miller $ $ $ $

......_....................h.1 NAME .........................___.......__.________................

DATE:06g85 :0 (/y5 :06/?/85  :  :  :  :

_.