s y
g W ITES $f4T(3 16 st-40 e
LIA8 #iGULaT04r COPMlii!0m345PECT10 ggygg W
Id45N181G70s. 8.C.
30555 Starch 30, 33g1 If '** tion Motice me. g}.4c; PO 8
- 3 CAUSING UNECESSARYTENTIALL Y SIM;rgcA,g g
.p.,.
PUBLIC RESULT!kG FROM ORuGRK ;a ; t og t i p,r. g '.'C, tcently issued h4C requirements 4 cn engineering evaluation
-RELAt[$' g;t $ c.,
t' the scree efechacee 4tial path for less of primary c,oel sne tossen tetsen c. air licensee found that the installed locati systes ta clear.nsi,e,.po..
ant at its Plierts,asu..,
ie h.
s scras (AretS) alternate red insertion (AAI) selof control Power.,.
!t ica.
ssettom.
h sent and drain valves.
enoid valve could cause iticn the sg% the opsn vent and drain valves to thThe less of coolant cou ment drain tank and then to the rea t mt less through the inserted delves co ldc or buitting suso. cter bull, ding e rea to 4 gre pe* drive for 145 u
be a The rate of men vent and drain valves. control red drives)pprominately 500 ype (based t
This less rate is well within the 4250 spethat would be eased by itity of the high pressure coetant injection (NPCI capability of the reacter core isolation coolin
) system. h eter the the loc ps of the CR0 pumps to maintai n level.
g (RCIC) system wou,ld otte nate red insertion installation was completed sg sn e refueling outage ending in Isay 1900.
at the Pilgets gWE emit daaring the air heaser supplying the scras valvesThe installation Pac to that provided t>y the t>ackup scras valve inserting the control rods in the event of This function is 4 reccter protection systee.
s, and it provides a means The testing of the ARI installation atan ATW5 that inc 10 arcarently failed to confire vent and drain valve function.
p ing identification of the potential path for les bcensee reviewed plant procedures t t
ps could be completed, immediate operatar actions d ri o assure that until syntes modift-s of primary caelant.
1 include closin0 the scram discharge ventinstr. menta
}
u ng an tin 80 17 and the instrumented volume l It is noted te header in response to
' or operator to the presence of reacter coolant fe11 evel ow tches shov18 alert the itensee modified the syntes during a sch d l oulag ARI actuatten, ase the scras discharge volume vent and dest e u ed outage in Febryary, 1981
( of A41 actuation.
a valves to close in the 1
J g 72 g s 850517 i
,I
l l
=
ai.
e t,..
c.,,<..,i,.. i,....,is.i ieito,.
s d
Ja o. H $Pterek, $lretter Dis 19 406 ef let t de%% end Leg. is 8 ester laspection t a< ' e..
1 0.a'i 'r.
i-.iet tetter fce Act a-2 t'e<
' e s-'tta?.e ter f - :,'g-s: cn 6
3 l F '..; ; 'r e t sc 4 to I. 'et Ne 8.'
17 wesx sta t e
03 'l '9t now 'i.
ELJorsen lett)(w; Of s0 'at ot/h*/94