ML20129H406

From kanterella
Jump to navigation Jump to search
Forwards Individual Exam Results for Applicants on Initial Exam Conducted 960913-20.Six ROs Passed Exam & 5 of 6 SROs Passed Exam.W/O ES-501-2,summary of Overall Exam Results & ES-303-1 & 303-2,Operator License Exam Rept
ML20129H406
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 10/25/1996
From: Meyer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Cwietniewicz V
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
References
NUDOCS 9610310275
Download: ML20129H406 (2)


Text

_ . _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ . . _ _

n y

October 25, 1996 L

4 i

Mr. Vincent J. Cwietniewicz Superintendent - Training PECO Energy Company Peach Bottom Atomic Power Station 1848 Lay Road Delta, Pennsylvania 17314

Dear Mr. Cwietniewicz:

The purpose of this letter is to inform you of individual examination results for your applicants on the initial examination conducted on September 13 - 20, 1996, by my staff at your facility. Six reactor operators were administered the examination, and six passed the examination. Six senior reactor operators-were administered the examination, five passed and one failed. This meets the intent of section E.1 of the Examiner Standards (ES 501) in NUREG 1021. This information is considered to be " proprietary" in accordance with 10 CFR 2.790 and it

supplements the information contained in the related examination report for your facility which will be issued shortly.

Enclosure 1 is the completed ES-501-2, Power Plant Licensing Examination Results Summary, and is a summary of overall examination results.

Enclosure 2 contains the individual results ES-303-1 and 303-2, Operator License Examination Report, (NRC Form 157) for each  ;

applicant. Contained therein are the deficiencies noted for each l applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and  ;

provide appropriate remedial training for these individuals '

independent of their overall pass status. Each applicant has authorized the release of this informatior."o your facility by signing Block 19A of NRC Form 398.

Enclosure 3 are copies of the licenses issued for those who passed the examination. A letter was issued to the one candidate t (?

who failed.

0FFICIAL RECORD COPY

,/

9610310275 961025 PDR ADOCK 05000277 Y PDR

a Mr. V. J. Cwietniewicz: l Thank you for your cooperation in this matter. Please refer any questions you have to me at 610-337-5211.

Sincerely, Original signed by Glenn W. Meyer, Chief Operator Licensing and Human Performance Branch Division of Reactor Safety I

Docket Nos. 50-277 and 50-278

Enclosures:

3

1. ES-501-2, Power Plant Licensing Examination Results Summary
2. ES-303-1 and 303-2, Individual Examination Results
3. Licenses and letter cc w/o encls:

G. R. Rainey, Vice President G. Edwards, Plant Manager PUBLIC 1 I

l bec w/o encls: l D. Florek, DRS Master Exam File l

DOCUMENT NAME: F:\initno, pb OFFIC RI/DRS RI/ RI/DRS RI/ RI/

NAME Curleyk Flo [ek \ Meyer h [

DATE 10/11 /96 10k/96 10/7 h j OFFICIAL RECORD COPY