ML20129H394

From kanterella
Jump to navigation Jump to search
Forwards Initial Operator Exam Repts 50-277/96-10OL & 50-278/96-10OL on 960913-20
ML20129H394
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 10/24/1996
From: Meyer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Danni Smith
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20129H398 List:
References
NUDOCS 9610310270
Download: ML20129H394 (3)


See also: IR 05000277/1996010

Text

\

s

y -

i

j

October 24, 1996

j

l

l

Mr. D. M. Smith, President l

PECO Nuclear l

Nuclear Group Headquarters

Correspondence Control Desi

P. O. Box 195

Wayne, Pennsylvania 19087-0195

SUBJECT: INITIAL OPERATOR EXAMINATION REPORTS 50-277/96-10 (OL),

'

50-278/96-10 (OL) j

l

Dear Mr. Smith:

This report transmits the findings of the initial operator examination conducted by NRC

examiners m the period of September 13 -20,1996, at the Peach Bottom Atomic Power

Station. At the conclusion of the examination, Mr. D. Florek discussed the examination j

observations with Mr. T. Mitchell of your staff. I

a

Based on the results of the examination, the applicants were well prepared for the

examination. Eleven of twelve applicants passed the examination and were subsequently

issued licenses. One SRO applicant did not pass the operating portion of the examination.

In accordance with 10 CFR 2.790 of the NRC's Pules of Practice," a copy of this letter

and its enclosures will be placed in the NRC Public Document Room.

No reply to this letter is required, but should you have any quest: ens regarding this

examination, please contact me at 610-337-5211.

I

Sincerely,

' '

'

,.

Glenn W. Meyer, Chief

Operator Licensing and

310024 Human Performance Branch

Division of Reactor Safety

Docket Nos. 50-277 and 50-278

Enclosure: NRC Region I Combined Examination inspection Report 50-277/96-10 (OL)

50-278/96-10 (OL) w/ Attachments 1 - 3

/

T \

9610310270 961024

PLR ADOCK 05000277

V PDR -

j

e-

t

Mr. D. M. Smith 2

cc w/ encl; w/o Attachments 1 - 3:

G. A. Hunger, Jr., Chairman, Nuclear Review Board and Director, Licensing

T. Mitchell, Vice President, Peach Bottom Atomic Power Station

G. Rainey, Senior Vice President, Nuclear Operations

D. B. Fetters, Vice President, Nuclear Station Support

T. Niessen, Director, Nuclear Quality Assurance

C. D. Schaefer, External Operations - Delmarva Power & Light Co.

G. Edwards, Plant Manager, Peach Bottom Atomic Power Station

G. J. Lengyel, Manager, Experience Assessment

J. W. Durham, Sr., Senior Vice President and General Counsel

P. MacFarland Goelz, Manager, Joint Generation, Atlantic Electric

B. W. Gorman, Manager, External Affairs

R. McLean, Power Plant Siting, Nuclear Evaluations

J. Vannoy, Acting Secretary of Harford County Council

R. Ochs, Maryland Safe Energy Coalition

J. H. Walter, Chief Engineer, Public Service Commission of Maryland

L. Jacobson, Peach Bottom Alliance

Commonwealth of Pennsylvania

State of Maryland

TMl - Alert (TMIA)

cc w/enci and Attachments 1 - 3:

V. Cwietniewicz, Director of Training

D. McClellan, Manager, Operations Training

Distribution w/enci and Attachments 1 - 3:

DRS Master Exam File

Nuclear Safety Information Center (NSIC)

PUBLIC

Distribution w/ encl; w/o Attachments 1 - 3:

Region I Docket Room (with concurrences)

J. Wiggins, DRS

D. Florek, DRS

NRC Resident inspector

DRS OL Favility File

J

1

=

l

l

l

.

Mr. D. M. Smith 3

Distribution w/ encl; w/o Attachments 1 - 3 (Via E-Mail)

W. Dean, OEDO

J. Sheai NRR

J. Stolz, PDI-2, NRR

Inspection Program Branch, NRR (IPAS)

R. Correia, NRR

R. Frahm, Jr., NRR

l

l

l

i

I

i

!

DOCUMENT NAME: A:PB961010.lNS

To receive e copy of this document, indicate in the box: 'C' = Copy without attachment / enclosure 'E' = Copy with attachment / enclosure

"N' = No copy nj

OFFICE f(f/J$ RI/DRS , /

NAME D 67 GMEYER /b . . / l

DATE #f23/95/ 10/gt'/96 1 W 10/ /96 10/ /96 10/ /96 !

OFFICIAL R' CORD COPY