October 24, 1996
j
l
Mr. D. M. Smith, President
PECO Nuclear
Nuclear Group Headquarters
Correspondence Control Desi
P. O. Box 195
Wayne, Pennsylvania 19087-0195
SUBJECT:
INITIAL OPERATOR EXAMINATION REPORTS 50-277/96-10 (OL),
'
50-278/96-10 (OL)
j
l
Dear Mr. Smith:
This report transmits the findings of the initial operator examination conducted by NRC
examiners m the period of September 13 -20,1996, at the Peach Bottom Atomic Power
Station. At the conclusion of the examination, Mr. D. Florek discussed the examination
j
observations with Mr. T. Mitchell of your staff.
a
Based on the results of the examination, the applicants were well prepared for the
examination. Eleven of twelve applicants passed the examination and were subsequently
issued licenses. One SRO applicant did not pass the operating portion of the examination.
In accordance with 10 CFR 2.790 of the NRC's Pules of Practice," a copy of this letter
and its enclosures will be placed in the NRC Public Document Room.
No reply to this letter is required, but should you have any quest: ens regarding this
examination, please contact me at 610-337-5211.
Sincerely,
'
'
'
,.
Glenn W. Meyer, Chief
Operator Licensing and
310024
Human Performance Branch
Division of Reactor Safety
Docket Nos. 50-277 and 50-278
Enclosure:
NRC Region I Combined Examination inspection Report 50-277/96-10 (OL)
50-278/96-10 (OL) w/ Attachments 1 - 3
/
\\
T
9610310270 961024
ADOCK 05000277
V
-
j
e-
t
Mr. D. M. Smith
2
cc w/ encl; w/o Attachments 1 - 3:
G. A. Hunger, Jr., Chairman, Nuclear Review Board and Director, Licensing
T. Mitchell, Vice President, Peach Bottom Atomic Power Station
G. Rainey, Senior Vice President, Nuclear Operations
D. B. Fetters, Vice President, Nuclear Station Support
T. Niessen, Director, Nuclear Quality Assurance
C. D. Schaefer, External Operations - Delmarva Power & Light Co.
G. Edwards, Plant Manager, Peach Bottom Atomic Power Station
G. J. Lengyel, Manager, Experience Assessment
J. W. Durham, Sr., Senior Vice President and General Counsel
P. MacFarland Goelz, Manager, Joint Generation, Atlantic Electric
B. W. Gorman, Manager, External Affairs
R. McLean, Power Plant Siting, Nuclear Evaluations
J. Vannoy, Acting Secretary of Harford County Council
R. Ochs, Maryland Safe Energy Coalition
J. H. Walter, Chief Engineer, Public Service Commission of Maryland
L. Jacobson, Peach Bottom Alliance
Commonwealth of Pennsylvania
State of Maryland
TMl - Alert (TMIA)
cc w/enci and Attachments 1 - 3:
V. Cwietniewicz, Director of Training
D. McClellan, Manager, Operations Training
Distribution w/enci and Attachments 1 - 3:
DRS Master Exam File
Nuclear Safety Information Center (NSIC)
PUBLIC
Distribution w/ encl; w/o Attachments 1 - 3:
Region I Docket Room (with concurrences)
J. Wiggins, DRS
D. Florek, DRS
NRC Resident inspector
J
1
=
.
Mr. D. M. Smith
3
Distribution w/ encl; w/o Attachments 1 - 3 (Via E-Mail)
W. Dean, OEDO
J. Sheai NRR
J. Stolz, PDI-2, NRR
Inspection Program Branch, NRR (IPAS)
R. Correia, NRR
R. Frahm, Jr., NRR
i
i
DOCUMENT NAME: A:PB961010.lNS
To receive e copy of this document, indicate in the box: 'C' = Copy without attachment / enclosure
'E' = Copy with attachment / enclosure
"N' = No copy
nj
OFFICE
f(f/J$
RI/DRS
/
,
NAME
D 67
GMEYER
/b . . /
DATE
- f23/95/
10/gt'/96 1 W
10/
/96
10/
/96
10/ /96 !
OFFICIAL R' CORD COPY