Page 1 of 5

.' E 385501046C Revision 39 04/30/85 LIMERICK GENERATING STATION EMERGENCY PLAN PROCEDURE INDEX l

DATE SIGNED DATE OF LAST PROCEDURE REV. BY SUPER. PERIODIC REVIEW NUMBER NO. TITLE EP-101 4 Classification of 03/25/85 Emergencies 8 Unusual Event Response 03/28/85 EP-102 10 Alert Response 04/30/85 EP-103 Site Emergency Response 03/28/85 EP-104 9 9 General Emergency Response 03/28/85 EP-105 EP-106 4 Written Summary 04/01/85 Notification EP-110 6 Personnel Assembly and Accountability 03/14/65 3 Site Emergency Coordinator 04/01/85 EP-120 4 Technical Support Center EP-201 03/29/85 03/29/85 g

(TSC) Activation EP-202 3 Operations Support Center 12/12/84 (OSC) Activation EP-203 5 Emergency Operations 04/01/85 Facility (EOF) Activation 04/01/85 4 Security Team 12/12/84 EP-208 Dose Assessment Team 12/12/84 EP-210 3 Field Survey Group 03/25/85 EP-211 2 EP-220 CANCELLED

_ _ . - rw EP-221 CANCELLED _

CANCELLED p;

EP-222 r "

EP-230 5 Chemistry Sampling a g y }y ( 03/14/85 ii O L.e.A Analysis Team R, h .*

EP-231 8 Operation of Post-Accident Sampling Systems  %[9hu .

. 3 Q)*/19/8'5 (PASS) uerin c ' '1

  • I\;a>- @Id- b EP-232 CANCELLED P#

U ,0,Q ' t i . .,

8507180626 850528 PDR ADOCK 05000352 F PDR

' Page 2 cf 5 Revision 39 04/30/85 i . LIMERICK GENERATING STATION 4

EMERGENCY PLAN PROCEDURE INDEX 4

PROCEDURE .REV. DATE SIGNED DATE OF LAST NO. TITLE BY SUPER. PERIODIC REVIEW NUMBER EP-233 5 Retrieving and Changing Sample Filters and Cartridges from the Containment Leak Detector

.Durinc Emergencies 03/14/85 EP-234 5 Obtaining Containment Gas Samples from the Containment Leak Detector During Emergencies 03/14/85

. EP-235 5 Obtaining Reactor Water Samples:from Sample Sinks Following 03/14/85 Accident Conditions EP-236 5 Obtaining Cooling Tower Blowdown Line Water Samples Following Radioactive Liquid Release after Accident Conditions 03/14/85 EP-237 7 Obtaining the Iodine /

Particulate and/or Gas Samples from the North Vent Wide Range Gas Monitor (WRGM) 03/28/85 EP-238 4 Obtaining Liquid Radwaste Samples from Radwaste Sample Sink Following Accident Conditions 12/12/84 EP-240 CANCELLED EP-241 8 Sample Preparation and Handling of Highly Radioactive Liquid Samples 03/14/85 EP-242 5 Sample Preparation and Handling of Highly k Radioactive Particulate

) Filters and Iodine Cartridges 03/28/85 EP-243 5 Sample Preparation and

[_ Handling of Highly Radioactive Gas Samples 12/12/84 EP-244 3 Offsite Analysis of High Activity Samples 03/12/85

Page 3 of 5

. Revision 39 04/30/85 S

LIMERICK GENERATING STATION EMERGENCY PLAN PROCEDURE INDEX PROCEDURE REV. DATE SIGNED DATE OF LAST NUMBER NO. TITLE BY SUPER. PERIODIC REVIEW EP-250 2 Personnel Safety Team 12/12/84 EP-251 2 Plant Survey Group 12/12/84 EP-252. 6 Search and Rescue /First '

Aid Group 04/22/85 04/01/85 EP-253 0 Personnel Dosimetry, Bioassay, and Respiratory Protection Group 12/12/94 EP-254 3 Vehicle and Evacuee Control Group 02/04/85 EP-255 2 Vehicle Decontamination 12/12/84

.EP-260 2 Fire and Damage Control Team 12/12/84 EP-261 2 Damage Repair Group 12/12/84 EP-272 4 Philadelphia Electric Company Officials Phone List 02/04/85 EP-273 5 Limerick Station Supervision Call List 04/22/85 04/22/85 EP-275 CANCELLED EP-276 6 Fire and Damage Team Phone List 04/22/85 04/22/85 EP-277 7 Personnel Safety Team Phone List 04/30/85 04/30/85 EP-278 5 Security Team Phone List 03/25/85 EP-279 5 Emergency Operations Facility (EOF) Group Phone List 04/18/85 EP-280 6 Technical Support Center Phone List 03/12/85 EP-282 5 Government and Emergency Management Agencies Phone List 04/22/85 04/22/85 ,

EP-284. 4 Company Consultants and Contractors Phone List 01/22/85 EP-287 3 Nearby Public and Industrial Users of Downstream Water 02/11/85

a +1 - -

Page 4 of 5

~/ Revision 39 04/30/85 3 - LIMERICK GENERATING STATION EMERGENCY PLAN PROCEDURE INDEX PROCEDURE REV. DATE SIGNED DATE OF LAST NUMBER NO. TITLE BY SUPER. PERIODIC REVIEW-EP-291 6 Staffing Augmentation 04/18/85 EP-292 8 Chemistry Sampiing and Analysis Team Phone List 04/22/85 04/22/85 EP-294 6 Dose Assessment Team Phone List 04/22/85 04/22/85 EP-301 1 Operating the Evacuation

-Alarm and River Warning System 12/12/84 EP-303 3 Local Evacuation 12/12/84 E'P-304 3 Partial Plant Evacuation 12/12/84 EP-305 5 Site Evacuation 03/25/85 EP-306 2 Evacuation of the Informaticn Center 04/18/85 EP-307 2 Reception and Orientation of Support Personnel 12/12/84 EP-312 4 Radioactive Liquid Release 04/18/85 EP-313 2 Distribution of Thyroid Blocking Tablets 12/12/84 EP-314 1 Emergency Radiation Exposure Guidelines and Controls 03/29/85 EP-315 5 Calculation of Offsite Doses During a'(Potential)

Radiological Emergency Using RMMS in the Manual Mode 04/01/85 EP-316 3 Cumulative Population and Near-Real-Time Emergency Dose Calculations for Airborne Releases Manual Method 04/01/85 EP-317 3 Determination of Protective Action Recommendations 03/25/85 EP-318 2 Liquid Release Dose Calculations Method for Drinking Water 04/01/85 04/01/85

Page 5 of 5

, Revision 39

, 04/30/85 LIMERICK GENERATING STATION EMERGENCY PLAN PROCEDURE INDEX PROCEDURE REV. DATE SIGNED DATE OF LAST NUMBER NO. TITLE BY SUPER. PERIODIC REVIEW EP-319 2 Fish Ingestion Pathway Dose Calculation 03/29/85 03/29/85 EP-325 3 Use of Containment Dose Rates to Estimate Release Source Term 02/27/85 EP-330 4 Emergency Response Facility Habitability 03/14/85 EP-333 0 Adjustment of Wide Range Gas Monitor Conversion Factors 04/03/85 EP-401 2 Entry for Emergency Repair and Operations 12/12/84 EP-410 3 Recovery Phase Implementation 03/29/85 EP-500 2 Review and Revision of Emergency Plan 12/12/84 4

s

'l EP-103, Rev. 10 "y 38$$QjQ47e Page 1 of 13

. VAW/JLP/rgs PHILADELPHIA ELECTRIC COMPANY LIMERICK GENERATING STATION .'u_ 3, . 5 5' EMERGENCY PLAN IMPLEMENTING PROCEDURE EP-103 ALERT RESPONSE 1.0 PARTICIPANTS 1.1 Shift Superintendent or designated alternate shall assume the role of Emergency Director and implement this procedure, until relieved.

1.2 Station Superintendent or designated alternate shall report to the Technical Support Center or Control Room, relieve the Emergency Director, assume the role of Emergency Director and continue implementing this procedure, if necessary.

- 2. 0 ACTIONS-IMMEDIATE 2.1 Emergency Director shall:

2.1.1 Verify the Emergency Classification as determined in EP-101, Classification of Emergencies, unless determination has just been made.

2.1.2 Fill out Appendix EP-103-1 Alert Notification Message and give it to the communicator.

2.1.3 Direct the communicator to complete notification of the appropriate parties as specified in Appendix EP-103-3, Alert Phone List (Initial Notification) or AppendixEP-10% l eip Li gt dEscalation or De-escalation) fai  : shy es.  :- e' .'

THE COMMUNICATO A"L L kE k'ELEPHONE ON A CONTINUOUS BASIS UNTILrtHEiNRC DISCONNECTS. IF THE COMMUNICATOR IS REQUI$ 6 phR DRGENT PLANT OPERATIONS RELATED TO THE EMERGE $ Jgf5E QONCURRENCE FOR SECURING THE PHONE SHOULD BE OBTAINED FROM THE NRC PRIOR TO SECUR WIS 7 HgE..,, ,

2.1.4 Contact the StatiIIn Supe [Tr ter I'andrane Shif t Technical Advisor, inform them of the situation.

d 4

L

J EP-103, Rev. 10 Page 2 of 13 7AW/JLP/rgs 1

2.1.5 Direct the Information Center Staff to implement EP-306, Evacuation of bB In to rma t io r/

Center. Inform the Staff of the wind direction if there is an airborne release.

2.1.6 If there is a radiological release, implement EP-305, Site Evacuation.

2.1.7 If there has not been a radiological release, A. Evacuate all construction mars;apel by Direct them contacting to call forBecntel Safetyhte a " Total Proj Eydb. uation" in accordance with Bechtel procedures. Inform i them of the nature of the hazard.

B. ContaqA Yqbg Construction Securityg. Off-and inform them that ab*ot HoursbtEvauationofBechtelConstruction Proje personnel is being implemented, also inform Operations Security 3 of the evacuation.

THIS WILL CALL FOR THE ASSEMBLY OF PERSONNEL AT THE UPPER PARKING LOT. IF IT IS DESIRED THAT THEY LEAVE THE 9ITE, INFORM BECHTEL COMMAND POSTS AT THE UPPER PARKING LOT.

C. Select the type of accountability desired for personnel in the protected area and implement the required actions below:

1. Emergency Assembly Without Accountability

-Make the following announcement "THIS (IS)(IS NOT) A DRILL. DESIGNATED EMERGENCY PERSONNEL REPORT TO ASSIGNED EMERGENCY RESPONSE FACILITIES OR ASSEMBLY AREA. ALL OTHER PERSONNEL STAND BY FOR FURTHER ANNOUNCEMENT. THIS (IS) (IS NOT)

A DRILL."

2. Emergency Assembly With Accountability A. Contact the Security Team Leader.

Inform him of the selected exist point (s), that emergency assembly with accountability is going to be implemented, and to activate the Security Team (EP-208) and to perform p_ersgnal acg gtability in

- ,m ame _w PerS ""*1

' {Ag@blylan a E'.E - 15ccat Et aWli;y .

e e

\

\ '

~

EP-103, Re'v. 10 I

  • Page 3 of 13 VAW/JLP/rgs W

B. ,pontact Yoh Construcg4and n Security inform

,i Stem that personnel leaving Unit 1 will be reassembling at the g Personnel Processing Center (PPC).

"THIS (IS)(IS NOT) A DRILL, THIS (IS){IS NOT) A DRILL. DESIGNATED EMERGENCY PERSONNEL REPORT TO ASSIGNED EMERGENCY RESPONSE FACILITIES OR ASSEMBLY AREA. ALL OTHER UNIT ONE PERSONNEL LEAVE THE PROTECTED AREA IMMEDIATELY AND REASSEMBLE AT THE PERSONNEL PROCESSING CENTER. THIS (IS) (IS NOT) A DRILL. THIS (IS) (IS NOT) A

' DRILL."

2.1.8 For off-hours, direct the Shift Clerk to activate the call list using EP-291, Staffing Augmentation. If Shift Clerk is not available, this function shall be assigned to any available individual. ,'

2.1.9 Direct the activation of the Technical Support Center in accordance with EP-201, Technical Support Center (TSC) Activation.

I 2.1.10 If necessary, activate the Emergency Operations Facility in accordance with EP-203, Emergency Operations Facility (EOF) Activation.

2.1.11 Assign an Operations Support Center Coordinator (PO) to direct available personnel to report to the Operations Support Center on 269' Elev. Turbine Bldg.

and to activate it in accordance with EP-202, Operations Support Center (OSC) Activation.

2.1.12 For samples, direct the Shift Chemistry Technician or Chemistry Sampling and Analysis Team Leader to implement EP-230, Chemistry Sampling and Analysis Team.

2.1.13 For in-plant surveys, direct a Shift HP Technician or Personnel Safety Team Leader to implement EP-250, Personnel Safety Team.

2.1.14 For field surveys, when a release of gaseous radioactive material has occurred or is suspected, direct the Dose Assessment Team Leader to implement EP-210, Dose Assessment Team. -

, _ _ === "

e

,4 s

d

1 O 1 ,

EP-103, Rev. 10 Page 4 of 13

}. VAW/JLP/rgs 2.1.15 For a release at or greater than the Alert level in EP-101, Classification of Emergencies, direct the Dose Assesment Team Leader to implement EP-210, Dose Assessment Team.

2.1.16 On an interim bases, direct the Shift Technical

, Advisor to perform dose projections using EP-316, l Cumulative Population and Near Real - Time Emergency Dose Calculations For Airborne Releases - Manual Method or EP-315 Calculation of Offsite Doses during a radiological Emergency using RMMS in the manual mode and to suggest Protective .;ction Recommendations per EP-317.

2.1.17 For fire / damage reoair direct the Maintenance Shift Assistant Foreman or Fire and Damage Team Leader to implement EP-260, Fire and Damage Team and/or EP-261, Damage Repair Group.

2.1.18 For a liquid release, implement EP-312 Radioactive Liquid Release, if required.

2.1.19 For Security matters, contact Security Shift Supervision and direct implementation of EP-208, Security Team unless previously done.

3.0 ACTIONS-FOLLOW-UP 3.1 Emergency Director shall:

3.1.1 Verify that the Technical Support Center, the Emergency Operations Facility (if necessary) and the Operations Support Center have been activated.

3.1.2 Periodically evaluate the event classification in accordance with EP-101, Classification of Emergencies and maintain, escalate or de-escalate the classification, as necessary.

3.1.3 If classification is de-escalated, fill out Appendix EP-103-2, Alert De-Escalation Notification Message and give it to the communicator and direct the communicator to perform notification of the appropriate parties listed in Appendix EP-103-4, Alert Phone List (Escalation or De-escalation).

3.1.4 Obtain the following information as necessary to formulate further actions:

a . _

.c 'EP-103, Rev. 10 Page 5 of 13 VAW/JLP/rgs A. Security status from Security Team Leader 3

B. Sample analysis from Shift Chemistry Technician or Chemistry Sampling and Analysis Team Leader s

C. In plant surveys from Shift HP Technician or Personnel Safety Team Leader D. Field surveys from Dose Assessment Team Leader fr E. Dose projections and protective action s recommendations from Shift Technical Advisor or Dose Assessment Team Leader s F. Fire / damage repair status from the Maintenance Shift Assistant Foreman or Fire and Damage Team Leader G. Notification results from Communicator 3.1.5 Determine which additional support personnel are necessary for emergency functions and direct the Shift Clerk or other assigned communicator in TSC to contact those personnel.

3.1.6 Provide site personnel with public add'ress (PA) announcements for any major changes in plant emergency status, such as changing emergency action levels and evacuations.

3.1.7 Evaluate the need and order evacuation of effected areas as necessary. Refer to the following procedures: EP-303 Local Evacuation, EP-304 Partial Plant Evacuation, EP-305 Site, Evacuation.

3.2 The Communicator shall:

3.2.1 Inform Emergency Director $nen-appropriatd Notifications have been made and submit completed t copy of Appendix EP-103-3 Alert Phone List (Initial Notification) or Appendix EP-103-4 Alert Phone List (Escalation or De-Escalation) for Emergency Director's Signature. 3 4.0 APPENDICES 4.1 EP-101-1 Alert Notification Message 4.2 EP-103-2 Alert De-Escalation Notification Message 4.3 EP-103-3 Alert Phone List (Initial Notification)

, Page 6 of 13 VAW/JLP/rgs

. 4.4 EP-103-4 Alert Phone List (Escalation or De-escalation) 5.0 SUPPORTING INFORMATION 5 .1 - Purpose v

The purpose of this procedure is to provide

- guidelines for site response-to an Alert.

5.2 ' Criteria For Use 5.2.1 This procedure shall be implemented when an event has been classified as an Alert per EP-101, Classification of Emergencies, and EP-101 has been completed.

5.3 Special Equipment i-None 5.4 References J

5.4.1 Limerick Generating Station Emergency Plan

- 5.4.2 NUREG 0654, Criteria for Preparation and Rev. 1 Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants.

5.4.3 EP-303 Local Evacuation

.s..

[' 5.4.4 EP-101 Classification of Emergencies 5.4.5 EP-304 Partial Plant Evacuation S

5.4.6 EP-305 Site Evacuation 5.4.7 EP-306 Evacuation of the Information Center 5.4.8 EP-291 Staffing Augmentation 0

5.4.9 EP-201 Technical Support Center (TSC) Activiation 5.4.10 EP-202 Operations Support Center (OSC) Activation 5.4.11 EP-203 Emergency Operations Facility (EOF)

Activation

\

s

)

~k

\

D

+,

.I EP-103, Rev. 10

. Page 7 Of 13 VAW/JLP/rgs 5.4.12 EP-317 Determination of Protective Action Recommendations 5.4.13 EP-316 Cumulative Population Dose Calculations I for Airborne Releases- Manual Method 5.4.14 EP-110 Personnel Assembly and Accountability 5.4.15 EP-208 Security Team 5.4.16 EP-210 Dose Assessment Team 5.4.17 EP-230 Chemistry Sampling and Analysis Team 5.4.18 EP-250 Fersonnel Safety Team 5.4.19 EP-260 Fise and Damage Team 5.4.20 EP-261 Damage Repair Group 5.4.21 EP-312 Radioactive Liquid Release 5.4.22 EP-315 Calculations of offsite doses during a Radiological Emergency using RMMS in the manual mode ,

1 1

- . s.,

EP-103, Rev. 10

' "' Page 8 cf 13 VAW/JLP/rgs

~

APPENDIX EP-103-1

~

ALERT NOTIFICATION MESSAGE MESSAGE: This (is) (is not) a drill. This (is) (is not) a drill. This is Limerick. Generating Station calling to report an Alert.

telephone Limerick Generating My name is ,

Station is reporting an Alert declared at Unit No. . Time and date The basic

-cf Alert classification are ,

(date)

(24 hr. clock time) problem is . There (has been) (has not been) an (airborne) (liquid) radioactive release from the plant. The plant status is (stable)(improving)(degrading)(not known). There is no I

protective action recommended. This (is) (is not) a drill. This (is) f (is not) a drill.

1 l

I L

L, . . .. ..

l '

EP-103, Rev. 10 Page 9 of-13 VAW/JLP/rgs-APPENDIX EP-103-2 ALERT DE-ESCALATION NOTIFICATION MESSAGE

' MESSAGE: *This (is) (is not)* a drill. This *(is) (is not)* a drill.

This is Limerick Generating Station calling to report a change in l

emergency classification. The Alert has been *(de-escalated to an Unusual Event) (Terminated)*.

H Time and date are , .

(24 Hr Clock Time) (Date)

The plant status is *(stable) (improving)*. My name is .

.\

This *(is) (is not)* a drill. This *(is) (is not)* a drill, p-o l'

l; l-I L

L

rdN i---

l 1:I'- 10 ' , . , t >< v . 10 Pa rle. In ri l ..

. r A. ? /. l ! . P / r . l

  • APPEllDTX CP-103-3 AT.I'RT PITO!!P. T.T ST Time' Initiated ( TllTTT AT. ?!OTIT'TCATIOtl) x CIRCT.C PliOrlE fillf1 TIER UST'D PATronne]/Agoney To P.c !!otified Phonc !!umbe r Time Pernon Recponi"ino

[

a. Station Superintendent Ilomo G. ft. T.citch Office J. P. Franz llome i Offico ,

P. J. Duca llomo Office

). T.caA Di npa tcl:or Office

c. f!ontgomery County Office of i Emergency Preparerinonn
d. Penncylvania Emergency t?anagemen t Aqency _
c. Pennnylvania Cureau of 1

Rat'intion Protection larric:urg, PA

f. flanager - Public Information 110mc Rona l:1 Ila rpe r Office

. 4

h l 1:1 - 10 ' , ! l. . 1P

, P. i. p . 1I <.t ,1. .

V/.t */. ? :.!* / r'J '

i i

APPEt: DIX l'P- 10 3 - 3 j AI.UR'i' PIIOflR I. T ST g .ime Initiated ( IllITI AI. IIOT T P T rATI Ot!)

i

\" CIRCT.E PIIO!!C l IIUtillCR USED

{ Pe r nannel / Agency '"o Be flot i f i ed Phone llumher Timo Pernon nonnon?ino

g. Director - Emergency llome
  • Preparcanenn Offico

.; noberta Ranhun Jack Pelly lione Office l I

a Victorla Marren Ilomo f l !

Officei i

h.  !?PC Operationn Center:

Dethen aa, ItD

}

f  !!ahe this call lant and remain on i telephone until t:Rc dinconnects I (Pernon con tact ing !!nr munt he I.icenned operator) L_______ _

Agencien to be contacted after j t be above per nonnel/agencien have been notir ea

( ___ _ _ -

i. Perhn rounty Pmergency j l t'a nagemen t Agency \ k 1

-i . chenter rounty Emergency i Servicon

h. Operat.innn Security

) _____________

completcJ Ily : '"i me /Da t e /

Vorified I'y : __

, c.,,m,,,--.m_______,,m, . . m .. n ,

,j I:!'-IO?o t . < -) . .I f t P;;r:< . I <.s. t *-

'//I'/ ? f.I'/r 1- ' ;

APPCt1DT/ EP-103-4 AT.ERT P!fOt!C T.i ST -

Tirte in i t i n ted. - _

( P. SCAT.ATTOf! On Dr.-P.GrAT.ATIOt!)

CIPCT.C PIIOf1P.

IIll!!BER IISED

( ~'

Pe r nonne l / Agency - To Be flot i fical Phone - flumSer ime Pernon Pennonding I!ome a.. Station Super intentiont G. ft. I.eitch Office

.T . P. Pran7 Ilome Office

'P. J. Duca llomo Office '

h. I.narl Dispatcher Office
c. Pennnylvania nureau of Parliat ion Protection l lia r r i chu rg , PA l_ _

el . tine Operatinnn Conter g I De tho ne?a , f1D -

!bl:e thin call lant and remain on telephone until !!RC dinconnectn ,..s

( Perron con tact ing f!PC mur.t be (

T.icenced Opa r a t.o r ) \ __

4

i l l'P- 101, I r. ". 'l O P.ie*<- 1

  • r .1 1*>

val l/.!!.l*/r<J:

APPEt!DTX EP-103-4 ALERT PilotlE I.IST Time Initiate <1 (ESCAT.ATIOf! OR DC-ESCAI.ATIOf!)

CTRCLE Pl!Of1E

!!UT111ER USED Personnel / Agency To Be riot i f ied Phone !! umber Tim, Pe: <'ing

\

Agencies to be contacted after j Lhe above personnel / agencies have  ;

heen not i fed i

e. ftontgomery County Office of Emergency Preparedness  !
f. Berks County Emergency rianagmen t Agency 9 Chester County Emergency Services Completed By: Time /Date Verifie? Dy:

Er*ERGEt!CY DInnrTOR

I

, l EP-277, Rev. 7

-j Page 1 of 5 385501Os,c,c .

vAW/ MPG /3e4

/

PHILADELPHIA ELECTRIC COMPANY 9,, gg , y.jp

' LIMERICK GENERATING STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE EP-277 PERSONNEL SAFETY TEAM PHONE LIST 1.0 PARTICIPANTS 1.1 Personnel Safety Team Leader calls in Group Leaders.

1.2 Plant Survey Group Leader calls the Health Physics (HP) Unit Technical Assistant and the HP Senior Technicians.

1.3 Health Physics (HP) Senior Technicians calls the HP technicians assigned to their shift.

NOTE: THE AREA CODE IS 215 UNLESS OTHERWISE SPECIFIED.

2.0 ACTIONS-IMMEDIATE 2.1 ePersonnel Safety Team Leader: s Name Home Work R. W. Dubiel R. Titolo (1st alternate)

T. J. Mscisz f (2nd alternate) 2.1.1 Personnel Safety Team Leader shall call people from the following list until appropriate group

{leaderpositionsare i 9 ~

2.1.2 Plant Survey Group Le E

rfI C_.. .. .. . R, j i x

Name Ebme ts', /- Work T. J. Mscisz S. Baker (1st alternate)

{A. Parducci ~

}(2nd alternate)

.c.

f . .

4 h

i

\.

EP-277, Rev. 7 Page 2 of 5 VAW/ MPG /je'<

f 2.1.3 ( Personnel Dosimetry, Bioassay, and Respiratorf~ )

Protection Group Leader Name Home Work B. Bolger .,

i R. Barclay 2.1.4 Vehicle and Evacuee Control Group Leader Name Home Work

/ j j C. Smith j J. Scone

( (Alternate) .

k k 2.2 [ Plant Survey' Group Leader shall call the Health

} Physics Unit Technical Assistant and the Health Physics Sr. Technicians:

Name Home Work f

f bnt A A. Parducci (Sr. Tech)

D. Fay (Sr. Tech)

D. Hines 4 (Sr. Tech)

R. Gosnay (Sr. Tech) l- R. Shortes (Sr. Tech)

J. Creedon (Sr. Tech) --

2. 3' Beslth Physics Sr. Technicians shall call the individuals on their shift and instruct them to report to the OSC (unless an alternate area is designated by The Personnel Safety Team Leader)as follows:

NOTE THE FOLLOWING SHIFTS ARE THOSE IN EFFECT ON l 04/08/85. AS CHANGES OCCUR, THE SR. TEC '*"C '

SHOULD CALL THOSE PERSONNEL ASSI D .

SHIFT AT THAT TIME. ,

i

F; j. cP-277, Rev. 7 l' Page 3 of 5 VAW/ MPG /jek I 2.3.1 Name Home Work l D. Hines l ,B. Florian l S. Sweisford ,

l- D. Nugent l D. Roberts l B. Kephart l M. Vandenburg i

? l 2.3.2 Name Home Work

-l A. Parducci S..Schymanski R. Dailey C. Red J. Gerhart

  • B. Muntz l l D. Nagle l F. Jarrett l 2.3.3 Name Home Work l D. Fay

(.' R. Gidding  !

B. Landis

! J. Chobot i

E. Golden .

l R. Call i L. Foley l J. Hay  ;

l 2.3.4 Name Home Work l R. Gosnay l S. Alligood l N. Root l B. Strubilla l N. Irwin l T. Donovan l J. Bruno l P. Smith l .

.E.

l .

i i

  • k 2.

- ~ - - _ ._

. . - -. ..--- .-- - . - - . - - - - - _ _ - - _ - . - -~ - - - . . - _ - -- --

. EP-277, Rev. 7 Page 4 of 5 VAW/ MPG /jek 2.3.5 f

f Name ml l Mcme Work j J. Creedon N. Hunter

! J. Fitzsimmons i J. DeGostin j  ! J. Kanaskie D. Haas

! M. Wagar

} l J. Moore t

{ 2.3.6 Name Home Work I B. Shortes i R. Sopata i' I M. Bilinski  !

I C. Engle I l C. Reyes l B. Lehmbeck l S. Scott I F. McCaughey l l D. Handy

! l

< 3.0 ACTIONS-FOLLOW-UP i V- \

j 3.1 None required l

4.0 APPENDICES None l

l 5.0 SUPPORTING INFORMATION 5.1 Purpose l

The purpose of this procedure is to provide guidelines and information to call in Personnel Safety Team Members.

5.2 Criteria for Use This procedure can be used when the Personnel Safety Team is activated or when additional people are needed. i-l

r-s EP-277, Rev. 7

' ~

. Page 5 of 5 VAW/ MPG /jek 1

5.3 Special Equipment None 5.4 References None s

Se M_

[ b, UNITED STATES E "i NUCLEAR REGULATORY COMMISSION g E WASHINGTON, D. C. 20555

% g July 10,1985

....+

50-352/353 Limerick MEMORANDUM FOR: Chief, Document Management Branch, TIDC FROM: Director, Division of Rules and Records, ADM

SUBJECT:

REVIEW 0F UTILITY EMERGENCY PLAN DOCUMENTATION The Ditision of Rules and Records has reviewed the attached document and has determined that it may now be made publicl available.

[-/

^

7

. M. Felton, Director Division of Rules and Record AI Office of Administration

Attachment:

As stated i

i h