ML20129H178
| ML20129H178 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 10/25/1996 |
| From: | Mckee P NRC (Affiliation Not Assigned) |
| To: | |
| Shared Package | |
| ML20129H182 | List: |
| References | |
| NUDOCS 9610310120 | |
| Download: ML20129H178 (7) | |
Text
_..
pS utuqk i
3 UNITED STATES 4
NUCLEAR REGULATORY COMMISSION N
f WASHINGTON. D.C. 20066 4 001
\\*****/
NORTHEAST NUCLEAR ENERGY COMPANY THE CONNECTICUT LIGHT AND POWER COMPANY
)
THE WESTERN MASSACHUSETTS ELECTRIC COMPANY DOCKET NO. 50-336 4
4 MILLSTONE NUCLEAR POWER STATION. UNIT NO 2 j
AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 205 l
License No. DPR-65 4
1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment by Northeast Nuclear Energy i
Company, et al. (the licensee) dated August 27, 1996, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; 3
i B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; j
4 i
C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health l
and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; j
and 4
E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
i l
i 9610310120 961025 PDR ADOCK 05000336 P
1 4
1
' 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-65 is hereby amended to read as follows:
(2)
Technical Soecifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 205, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of issuance, to be implemented within 30 days of issuance.
FOR THE LEAR REGULATORY COMMISSION Phillip F.
cKee, Director Northeast Utilities Project Directorate Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: October 25, 1996
-. ~
ATTACHMENT TO LICENSE AMENDMENT NO. 205 FACILITY OPERATING LICENSE NO. OPR-65 j
DOCKET NO. 50-336 i
Replace the following page of the Appendix A, Technical Specifications, with the attached page.
The revised page is identified by amendment number and contains vertical lines indicating the areas of change.
Remove Insert 3/4 1-11 3/4 1-11
REACTIVITY CONTROL SYSTEMS I
CHARGING PUMP - SHUTDOWN LINITING CONDITION FOR OPERATION 3.1.2.3 One charging pump and one high pressure safety injection pump
- in the boron injection flow path required OPERABLE pursuant to Specification 3.1.2.1 shall be OPERABLE and capable of being powered from an OPERABLE emergency bus. One additional charging pump and high pressure safety injection pump may be capable of injecting provided that the RCS is vented a
through a passive vent of 1 2.8 in,
APPLICABILITY: MODES 5 and 6.
ACTION:
With less than the minimum required pumps OPERABLE, suspend all a.
operations involving CORE ALTERATIONS or positive reactivity changes until at least one of the required pumps is restored to OPERABLE status.
b.
With more than the maximum allowed pumps capable of injecting take l
~
immediate action to comply with 3.1.2.3.
1 SURVEILLANCE REQUIREMENTS i
4.1.2.3.1 The above required charging pump and high pressure safety injection pump shall be demonstrated OPERABLE at least once per 31 days by:
Starting (unless already operating) the pump from the control l
a.
- room, i
b.
Verifying pump operation for at least 15 minutes, and Verifying that the pump is aligned to receive electrical power c.
from an OPERABLE emergency bus.
i 4.1.2.3.2 All charging pumps not intended to be capable of injecting, l
4 shall be demonstrated inoperable at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by verifying that the motor circuit breakers are in the open position.
4.1.2.3.3 All high pressure safety injection pumps not intended to be capable of injecting, shall be demonstrated inoperable at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by either:
(a) verifying.that the motor circuit breakers have been disconnected from their power su) ply circuits, or (b) shutting and tagging the discharge valve with the key loc ( on the control panel (2-SI-654 or 2-SI-656).
...n;. -
When in MODE 6 with the reactor vessel head removed then only one charging pump is required.
MILLSTONE - UNIT 2 3/41-11 Amendment No. Jpp, 205 0271
-.