ML20129H157
| ML20129H157 | |
| Person / Time | |
|---|---|
| Site: | Kansas State University |
| Issue date: | 10/01/1996 |
| From: | Ryan B KANSAS STATE UNIV., MANHATTAN, KS |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9610080025 | |
| Download: ML20129H157 (2) | |
Text
- -
Dep rtm:nt cf Nuctur Engineering 137 Ward hah M
Manhattan, Kansas 66506-2503 uwwastatTY 913-522-5624 01 October 1996 U.S. Nuclear Regulatory Commission Attn. Document Control Desk Washington, DC 20555 Re:
Docket 50-188 License R-88 Document Controller:
Pursuant to 10CFR50.59(b) the following items are submitted for the Kansas State University TRIGA Mark II Nuclear Reactor Facility for the period 1 October 1995 through 30 September 1996.
A. Changes in the Facility Modifications to the Facility Security System were approved
- by the Reactor Safeguards Committee (RSC) on 29 June 1996. Pursuant to 10CFR2.790(d) the details of changes are exempt from this report. The changes were implemented in July 1996 and inspected by the RSC of 27 September 1996.
Modifications were made to the Themializing Column bici Space Drain to allow it to be n:onitored and drained separately f om the Bearn Port i ad Thermal Column lines. Tl e action was taken to prevent. vater buildup from entering the other systems.
Written procedures were approved
- bp the RSC on 8 July 1996. The new system was complete d July 1996 and inspecte i by ha RSC on 27 September 1996.
Proposed administrative changes at the facility require modification of the Operating License and Emergency Plan. A Facility Manager position is to be created, combining the duties of Facility Director and Reactor Supervisor. These changes were approved
- by the RSC on 5 August 1996 and were submitted to the NRC for review.
At this time, the NRC has not taken fmal action on the recommended changes.
B. Changes in Procedures
., q7 Procedure 23, " Automatic Flux Control System," vas approved
- by the RSC on 22 g17 February 1996.
/
cp ann
~
3eA 1 88n ses88ise l
R PDR Phone:(913)532-6657 Fax: (913)532-6952 E-mail: ibryan[ine.ksu.cdu
I O
Procedure 5, Part II, " Semi-Annual Check of 110% Safety Circuits" was revised to clarify the procedure with respect to new instruments. The new procedure was rewritten on 26 June 1996 and approved
- by the RSC on 27 September 1996.
C. Changes in Tests or Experiments None.
- Approval of the Reactor Safeguards Committee signifies that the proposed changes do not involve any unreviewed safety questions, and that their implementation does not represent an increase in the risks to personnel or reactor integrity.
Sincerely, Brendan C. Ryan KSU Reactor Supervisor U.S. Nuclear Regulatory Commission, Region IV cc:
KSU Nuclear Reactor Safeguards Committee Phone:(913)532-6657 Fax: (913)S32-6952 E mail:ibryangne.ksu.edu
_ _ _ _ _ _ _ _ _ _ _