Text
_
June 6,1996 l
William L. Axelson, Director 1 READING FILE MEMORANDUM T0:
Division of Reactor Projects Region III FROM:
Charles E. Rossi, Directog Safety Programs Division Office for Analysis and Evaluation of Operational Data
SUBJECT:
UPDATED AE00 INPUT FOR THE CHAIRMAN'S JULY 12, 1996, VISIT TO POINT BEACH Attached is our updated input to the Chairman's briefing package for the July 12, 1996, visit to Point Beach. Our input summarizes recent plant operational experience, and updates my February 23, 1996, memo supplying information for the previously scheduled Point Beach visit. Our input is based on several data sources, including Emergency Notification Reports, Licensee Event Reports, and AE00 Performance Indicator data.
Attachment:
As stated CONTACT:
L. Mark Padovan, AE00/SPD/RAB (301) 415-6374 cc w/att:
W. Dean, OED0 G. O'Dwyer, RIII A. Hansen, NRR T. Kobetz, Point Beach SRI i
Distribution:
j File Center gg.?
SPD R/F FCongel PBaranowsky KRaglin, TTD DHickman Dross EJordan LSoffer, OEDO DOCUMENT NAME: C:\\WP51\\WPDOCS\\COMVISIT\\PTBEACH2.LMP To receive a copy of this document, indecate in the box: *C" = Copy witho enclosures
- E" = Copy with enclosures "N" = No copy (T /
0FFICE RAB E
.G C:RAB f
D:SPD 4/
NAME LMPadovan:mmk RLloyd W JRosenthal CRossi W 4
~
DATE 6/4/96 6/f/96 6/4/96 6/f/96 0FFICIAL RECURD COPY
&=?4-9610070319 960926 PDR FOIA A[
DUMS96-322 PDR
1 RECENT POINT BEACH PLANT OPERATIONS EXPERIENCE
SUMMARY
L OVERVIEW The review period began January 1,1995, and included Licensee Event Reports (LERs) and emergency notification system reports that AEOD processed through June 1,1996. During this period, the NRC did not classify any Point Beach events as NUREG-0090 Abnormal Occurrences or Appendix C items ("Other Events of Interest"). Of the events reported to the NRC during the review period, we determined that none of the events were important, based on AEOD event screening criteria.
i LL OTHER OPERATIONAL DATA We reviewed Unit 1 LER Nos. 266/95-01 through 266/96-01, and Unit 2 LER Nos. 301/95-01 through 301/95-06. We used the AEOD screening process to determine that none of these LERs were important. However, the licensee made a report to the emergency nonfication system on May 28,1996, (report number 30552). The report indicated that a brief combustible gas burn occurred inside a dry spent fuel assembly storage container when licensee personnel were welding a shield lid to the top of the container. The burn did not cause any radiation to be released to the public, and did not cause any injuries to people at the site. The licensee is investigating the cause of the gas burn.
HL PERFORMANCE INDICATOR DATA The most recent Performance Indicator (PI) information is attached. This information is the same as that included in my February 23,1996, memo to ycu. The PIs do not show any significant problems at Point Beach. Note that the PI safety system actuations are composed of emergency core cooling system (ECCS) actuations and emergency ac power (diesel-generator) actuations in response to a dead bus.
1 Attachment
s Legend.
POINT BEACH 1 5""*"""""",
Refueling R
Operation m industry Avg. Trend shutdown M 92-4 to 95-3 Quarte @ Det' Not Shown using op.Cyc!e IEM l
1 Ops., l l
1 Ops. l l l
s it p.
I l
I I
I I
a it s
W i
93-1 SM 94 1' 94-3 95-t 93 1' B33 94-1 94-3 95-1' Year - Quarter Year - Quarter Automatic Screme While Critical Safety System Actuations 4
I i
3-j 3-f
]
I g
2-4 2J d1 1
i 0
m
=
0 93-3 94-1' 94 3 IN1 95-3 93 1' 93-3 94-1' 94-3 95 1' 95-3 93-1' Year - Quarter Year-Quarter S%n Eves Safety System Failures 2.0
( 1.5
!I 3J l
h h i
i 5
g2 W
a i
1 1.0 --
g4 jE 0.5 f1-.
O.0 0
93-1' 93-3 941' 94 3 95-1' 95-3 93-1' 93,1 94 13 94 3 95 1' 95-5 Yeer - Quarter Year - Quarter Equipment Forood Outegeel MC M CM hm Forced Outage Rate (%)
6 100 l
1' alt i
J a0 -
i I
djy 4~
E w.
- ~
2-
'iO 1 20 -
.f.- 0
'M E
0 l 3,3,1, g
N y,3,i;
,M
,,,1,
,,,3
,,,,, g w
,n
,,,1,
,,,3
,,,i, w
Year - Quarter Year - Quarter Cause Codes
=
Conective Radiation Exposuve 200
{
j e-w-
u.
'l W 150 s.
e-i.,
E j 1,oj o.m. = s
_..a l
- d. Mawit
- e. Desagn
- f. Misc
- E
~
{[50dg, r,
"i l
' * ~
- ~
o
.JL E
_L shfR A NA i
'1 93-1; 93 3 94-1' 94-3 95-1' 95-3 eg..@
l t
Year - Quarter
-~
.'e"~
e
- See Average Radsstion Exposure
\\
i 4
I POINT BEACH 1 l L.s.ad:st=ne i sier*.nc.
wien immini Medium j
Peer Group:Wes6nghouse Small 1.
924 to 95 3 Trends and DeviabonsI
^
i Deviations From Plant Peer Group Self-Trend Median Short Term Long Term OPERATIONS (including startup) i Automatic Scrams While Critical -
-0.18 0
- {
Safety System Actuations -
o o
?
4 Significant Events -
o o
Safety System 'railures -
0 o
l 2
l Cause Codes (All LERs) 1
]'
[ 0.08 0
e Asmauseuswo ceneet Promens -
1
- m. usenene operener Eners -
0 O
] 0.10
_. 0.36
- c. osser 7-.
' Eners -
] 0.07 0.28 e asennenance Premens -
y I
- e. ".- -
.t Premens -
0 i 0.40 J
- t. - -
0 0.90 i
SHUTDOWN Safety System Actuations -
0.63
-0.14 Significant Events -
0 0
Safety System Failures -
0 0.59 Cause Codes (All LERs)
] 0.23 E
4.59
- a. Aemmesweeve conens Premens -
1
- n. usensee operseer eners -
0 0
- c. osier Pereennel snore -
0.90 M 4.60
]
] 0.is 4.25
- e. :
Premens -
- e. E _-
a Premens -
i 0.30 4.09 [
- r. u _ ---
0 0
FORCED OUTAGES i
Forced Outage Rate * --
-0 03 0
Equipment Forced Outages /
- 1000 Commercial Critical Hours
-0'14 0
i 10
-05 0'.0 0.5 1.0
-t 0 45 0.0 0'.5 1.0 l
Performance index Performance Index
- Not Cucmetes for operemonal Cycw e
Legend:
I POINT BEACH 2 5""*'*""*"'""",'
l Refueling R
Operation m industry Avg. Trend shutdown L5555S i
924 to 95-3 Quarterfy Date Not shown using op. Cycle glEREi Ops.
Ops.
f.
F R
f.
8 S/D '
93-1 93-3 94 1 D4-3 95-1 D5 3 93-li 93-3 94 1' 94 3 51-95 3 Year - Quarter Year - Quarter AutomeNe Scrams Whue Critical Satsty System ActuaSons 4
l f
f.3-3-
l 3
1 2-2-
4 i
3 3
i e
j i
i i
i 0
O h
93-1' 93 4 94 1' 94 3 95-1 95-3 93-1 93 3 D41; 94-3 95-1' 95 3 l
Year - Quarter Year - Quarter l
{
E.1 E ents Safety System Fauures 2.0 i
1.5 --
3
=
j I
l 5;y 'j 9 f
I m
0.5 -
1.)
- g g
i m
00 o
93 1' 93 4 94 1' beJ 95 1' 95J
' 93 1' 33J 94-ti VJ 95 1' 96 4 Yeer - Quarter Year - Quarts.
Equipment Fotood Outa wel s
100 Foeced Outage Rate (%)
1000 CM CM Kws 6-l 7
.l
]ll'
- l 90 _
4
] $
~.
d li 40 -
6 y s 2-
'lO
} 20 f~
l '
i i
JA B
t 8
33 1' D34 54-1' 54 3 951' 95 4 w
93 1i 93-3 to-it 94 3 9 7 5 -
95-3 I
Year - Quarter Year - Querior Cause Codes Cotoceve Radiellon Exposure a,
=
200,
f
=j
=-
=
uJ e 150-1 Eg iJ l s-ea I
N
==
100 i
e e
e
- d. Maint
- e. Desegn
- f. Misc q,
j*
50 -
RR 1,,
i J
ILE.JLh5 bi 0
I 5
93-1l 93 3 94-1i b4-3 95-1 95 3 5m l
Year - Quarter
.i S=
- Site Average Redsston Exposure
=
s
.~ -.
~-
~
POINT BEACH 2
, too.nd s w.0c.istorviic.nc.
si0n Peer Group:Westnghouse small Medium s
j 92-4 to 95-3 ~
Trends and Devistons Deviations From j
Plant Peer Group Self-Trend Median Short Term Long Term Dochned improved worse sener Autorratic Scrams While Critical -
l 0.36 0
Safety System Actuaticens -
o
-0.36 Significant Events -
0 0
1 Safety System Failures -
0.15 0
Cause Codes (All LERs) j
[ 0.15
' O.30
- a. Ammaumeoswa cenew Preneems -
- t. usenses opermeer errors -
0 0
- c. omer Pereennes arrers -
. 0.40 O
- e. mannemence Presiens -
0.62 0.28 I
e.
annemmen Proniens -
0 0.60 l
f-s-
0 0
SHUTDOWN i
l Safety System Actuations -
o
-0.84 Significant Events -
0 0
Safety System Failures -
o
.o.03 Cause Codes (All LERs)
] 0.23 O
- s..- -
-.; conow Premiens -
m.ueesses opermeer arvers -
0 O
s.come Pereennes arroes -
0 M 0.75
- s. -
--- Preseens -
1 0.36 0.15 [
- e. '-
r Preseene -
0 0.01
- f. "
0 0
FORCED OUTAGES Forced Outage Rate * -
o 01
! 0.05 Equipment Forced Outages / *
~~"
1 0 26 0
1000 Commercial Critical Hours 1.0
-05 0.0 0.5 1.0
-1.0 O'.5 0.0 0'S 1.0 Performance index performance index
- east caecuamed #er operemonal cyc6e
. _ ~
i f i
4 2
POINT BEACH 1 i
PI EVENTS FOR 94-4 l
NONE PI EVENTS FOR 95-1 SSA 03/13/95 LER8 26695002 50.728: 28519 PWR HIST: COLD SHUTDOWN DESC
- A SAFEGUARDS BUS WAS DEENERGlZED AS THE RESULT OF A WIRE PULLING FREE FR0h ITC LUG DURING A PLANT MODIFICATION. THE EMERGENCY DIESEL STARTED AND LO4DED THE BUS.
f PI EVENTS FOR 95-2 No.
1 l
PI EVENTS FOR 95-3
)
8 CRAN 07/14/95 LER# 26695006 50.728: 29064 PWR HIST: POWER OPERATIONS AT 100%
DESC
- A TUR8tNE/ REACTOR TRIP OCCURRED ON A LOSS OF GENERATOR EXCITATION. CONDENSATION IN THE EXCITER HOUSING CAUSED SHORTING AND FAILURE OF THE EXCITER.
i 4
1 4
?
i i
4 1
I h
1 4
l a
POINT BEACH 2 PI EVENTS FOR 94-4 NOME PI EVENTS FOR 95-1 SSA 02/27/95 LER* 30195001 50.72# 28448 PWR HIST: HOT SHUTDOWN DESC
- THE "A" EMERGENCY DIESEL GENERATOR AUTO-STARTED AND LOADED ONTO ITS SAFETY BUS. THIS RESULTED FROM A PERSONNEL ERROR WHEN SOME WIRES WERE DISCONNECTED FROM A TERMINAL BLOCK DURING MAINTENANCE.
SCRAM 03/07/95 LER# 30195003 50.72#: 28501 PWR HIST: POWER OPERATIONS AT 100%
DESC A REACTOR TRIP RESULTED FROM AN OVER TEMPERATURE DIFFERENTIAL TEMPERATURE SIGNAL WHEN A TURBINE STOP VALVE CLOSED BECAUSE OF AN ELECTR0 HYDRAULIC CONTROL SYSTEM CIL LEAK.
SSF 03/28/95 LER# 26695004 50.72#: 28598 PWR HIST: EVENT DISCOVERED DURING OPERATION AT 99% POWER GROUP EMERGENCY AC/DC POWER SYSTEMS GROUP SYSTEN : EMERGENCY ONSITE POWER SUPPLY SYSTEM DESC
- 50TH EMERGENCY DIESEL GENERATORS WERE DECLARED INOPERABLE. ONE DIESEL WAS TAGGED OUT FOR MODIFICATION AND THE OTNER DIESEL NAD UNDERVOLTAGE RELATS IMPROPERLY SET.
i PI EVENTS FOR 95-2 NONE PI EVENTS FOR 95-3
]
NONE i
I i