ML20129G824
| ML20129G824 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 10/28/1996 |
| From: | Alexion T NRC (Affiliation Not Assigned) |
| To: | NRC (Affiliation Not Assigned) |
| References | |
| NUDOCS 9610300225 | |
| Download: ML20129G824 (3) | |
Text
>
(
e.
October 28, 1996 i
LICENSEE:
HOUSTON LIGHTING AND POWER COMPANY (HL&P), et. al.
FACILITY:
South Texas Project, Units 1 and 2 (STP)
SUBJECT:
SUMMARY
OF MEETING ON MANAGEMENT-LEVEL DISCUSSIONS ON RISK-INFORMED l
LICENSING APPLICATIONS On October 15, 1996, the licensee met with Nuclear Regulatory Commission (NRC) on the Tbove subject. Meeting attendees are listed in the Attachment.
The licensee indicated that it has a number of initiatives that use probabilistic risk assessment'(PRA).
In light of recent industry events, the licensee requested a sense of where NRC was going in the PRA area in order to decide if it wanted to continue spending resources in the PRA area.
1 The NRC provided the licensee with feedback in the areas of risk-informed safety compliance, NRC's reviews of recent industry events, and NRC's PRA-informed activities.
j Original signed by i
Thomas W. Alexion, Project Manager Project Directorate IV-1 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket Nos.
50-498 and 50-499
Attachment:
List of Meeting Attendees cc w/atts:
See next page DISTRIBUTION:
Hard Copy Docket File PUBLIC OGC (15B18)
ACRS PD4-1 r/f TAlexion JDyer, RIV E-Mail FMiraglia (FJM)
JMitchell (JAM)
)
RZimmerman (RPZ)
SDinsmore (SCD1)
JRoe (JWR)
RGramm (RAG)
C' I
/
)
WBeckner (WDB)
SBlack (SCB) i CHawes (CMH2)
WHaass (W 'd)
EJordan (JKR)
JFlack (J F)
LCampbell (L C)
Document Name: ST101596.MTS OFC PM/PDJLM
__( A)LA/PD4-1 D/PD4-1 4 NAME TAlexid h CHawes bfM WBeckner 10/N96 10/7/96
,10/h96 DATE
[YEShN0
[YES'/NO YES/NO COPY 8(){;
0FFICIAL RECORD COPY 9610300225 961028 ADOCK0500g8 DR
s go teroq p
UNITED STATES g
j NUCLEAR REGULATORY COMMISSION o
WASHINGTON, D.C. 20666 c001
- '+9.....
October 28, 1996 4
9 LICENSEE: HOUSTON LIGHTING AND POWER COMPANY (HL&P), et. al.
FACILITY: South Texas Project, Units 1 and 2 (STP)
SUBJECT:
SUMMARY
OF MEETING ON MANAGEMENT-LEVEL DISCUSSIONS ON RISK-INFORMED LICENSING APPLICATIONS i
On October 15, 1996, the licensee met with Nuclear Regulatory Commission (NRC) on the above subject. Meeting attendees are listed in the Attachment.
The licensee indicated that it has a number of initiatives that use probabilistic risk assessment (PRA).
In light of recent industry events, the licensee requested a sense of where NRC was going in the PRA area in order to decide if it wanted to continue spending resources in the PRA area.
The NRC provided the licensee with feedback in the areas of risk-informed safety compliance, NRC's reviews of recent industry events, and NRC's PRA-informed activities.
l Wh1W }
Thomas W. Alexion, Project Manager Project Directorate IV-1 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket Nos.
50-498 and 50-499
Attachment:
List of Meeting Attendees cc w/atts:
See next page
0 l
Houston Lighting & Power Company South Texas, Units 1 & 2 cc:
Mr. David P. Loveless Jack R. Newman, Esq.
Senior Resident Inspector Morgan, Lewis & Bockius U.S. Nuclear Regulatory Commission 1800 M Street, N.W.
P. O. Box 910 Washington, DC 20036-5869 Bay City, TX 77414 Mr. J. C. Lanier/M. B. Lee General Manager, Nuclear Assurance Licensing City of Austin Houston Lighting and Power Company Electric Utility Department P. O. Box 289 721 Barton Springs Road Wadsworth, TX 77483 Austin, TX 78704 Rufus S. Scott Mr. M. T. Hardt Associate General Counsel Mr. W. C. Gunst Houston Lighting and Power Company City Public Service Board P. O. Box 61867 P. O. Box 1771 Houston, TX 77208 San Antonio, TX 78296 Joseph R. Egan, Esq.
Mr. G. E. Vaughn/C. A. Johnson Egan & Associates, P.C.
Central Power and Light Company 2300 N Street, N.W.
P. O. Box 289 Washington, DC 20037 Mail Code: N5012 Wadsworth, TX 74483 Office of the Governor ATTN: Andy Barrett, Director INP0 Environmental Policy Records Center P. O. Box 12428 700 Galleria Parkway Austin, TX 78711 Atlanta, GA 30339-3064 Arthur C. Tate, Director Regional Administrator, Region IV Division of Compliance & Inspection U.S. Nuclear Regulatory Commission Bureau of Radiation Control 611 Ryan Plaza Drive, Suite 400 Texas Department of Health Arlington, TX 76011 1100 West 49th Street Austin, TX-78756 Dr. Bertram Wolfe 15453 Via Vaquero J. W. Beck Monte Sereno, CA 95030 Little Harbor Consultants, Inc.
44 Nichols Road Judge, Matagorda County Cohasset, MA 02025-1166 Matagorda County Courthouse 1700 Seventh Street Bay City, TX 77414 l
Mr. William T. Cottle Executive VP & General Manager Nuclear Houston Lighting & Power Company South Texas Project Electric Generating Station P. O. Box 289 Wadsworth, TX 77483
]
MANAGEMENT-LEVEL DISCUSSIONS ON RISK-INFORMED LICENS1f1G APPLICATIONS MEETING BETWEEN HL&P AND NRC October 10. 1996 Haag Oraanization L. Martin HL&P A. Thadani NRC R. Zimmerman NRC W. Beckner NRC C. Grimes NRC S. Black NRC R. Gramm NRC J. F1ack NRC W. Haass NRC L. Campbell NRC S. Dinsmore NRC T. Alexion NRC i
i ATTACHMENT