Text

. . .. - - -.

-

- -

. - - . - -

. ~ . - - -

._ - _ . ._-.___ -

-

.

-

,

!

.

i

t

!

-9-

j

i

M1.3 Secondary Containment Leak Test

(

!

a.

Inspection Scope (61726)

!

1

The inspectors reviewed a closed condition report (95-1372)concerning containment

)

ventilation testing to verify that the identified condition was properly performed and

that the completed surveillance test included steps that isolated other ventilation

systems from the reactor building ventilation.

-

~

b.

Observations and Findinas

On December 9,1995, Condition Report 95-1372 was written to identify a potential

interaction between secondary containment and the turbine building ventilation system.

The condition report documented that, when the reactor building ventilation flow was

lowered, the turbine building ventilation flow also decreased. Engineering dispositioned

the condition report by stating that: (1) the secondary containment leak test was

l

performed on December 8, with no deficiencies, and (2) the chart recorder showed that

several flow swings had occurred in the turbine ventilation flow for several days.

.

Based on this information, engineering had no evidence that an interaction between the

_

two building ventilation systems existed.

l

The inspector noted during the review of Procedure 6.SC.501 performed on

'

December 8 that steps were performed which secured the turbine ventilation system,

while verifying that the reactor building pressure did not change.

,

l

'

c.

Conclusions

The inspectors found that the condition report was satisfactorily dispositioned and

Procedure 6.SC.501 verified that there was no interaction between the turbine and

reactor building ventilation.

M2

Maintenance and Material Condition of Facilities and Equipment

M2.1 Inspection Tours (71707)

During routine tours of the plant, inspectors noted that housekeeping had declined

slightly in that various materials were observed throughout the plant, for example,

brooms, ladders, radioactive trash containers, and other minor items were seen.

'

Although the material condition of the equipment was not observed to have changed

j

significantly, this degraded housekeeping represents a slight decline in the overall

)

{

appearance of the plant.