ML20129G433

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Mar 1985
ML20129G433
Person / Time
Site: Yankee Rowe
Issue date: 03/31/1985
From: Heider L, Whipple S
YANKEE ATOMIC ELECTRIC CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
FYR-85-42, NUDOCS 8506070267
Download: ML20129G433 (6)


Text

,

OPERATING DATA REPORT DOCKET NO.

50-29 DATE idO402 COMPLETED BY S. UNIPPLE TELEfHONE (617) 872-8100 OPERATING STATUS 1.

Unit Name: Yankee Rowe 2.

Reporting Period: March, 1985 3.

Licensed Thermal Power (Mt):

600 4.

Naseplate Rating (6ross M e):

185 5.

Design Electrical Rating (Net Me):

175 6.

Marious Dependable Capacity (6ross Me): 180 7.

Maalaus Dependable Capanty (Net Me):

167 8.

If Changes Occur in Capacity Ratings (Items Nuaber 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level To Nhich Restricted. If Any (Net Me):

10. Reasons For Restrictions, if Any:

This Month Yr.-to-Date Cumulative

11. Hours In Reporting Period 744.00 2,160.00
12. Number of Hours Reactor Has Critical 744.00 2,160.00 170,083.10
13. Reactor Reserve Shutdown Hours 0.00 0.00 0.60
14. Hours Generator On-Line 744.00 2,160.00 145,344.42
15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
16. Sross Thereal Energy Sturated (MH) 444,337.00 1,281,261.M 89,771,913.52
17. Gross Electrical Energy Generated (MH) 135,786.60 391,551.30 27,210,354.60
18. Net Electrical Energy Generated (MH) 127,478.48 367,432.29 25,461,982.74
19. Unit Service Factor 100.00 100.00 77.36
20. Unit Availability Factor 100.00 100.00 77.36
21. Unit Capacity Factor (Using MDC Net) 102.60 101.86 73.32
22. Unit Capacity Factor (Using DER Net) 97.91 97.20 69.80
23. Unit Forced Outage Rate 0.00 0.00 5.40
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

None

25. If Shutdown At End of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMERCIAL OPERATION 8506070267 850 g

gy y

a== a.

i

a AVERA8E DAILY llNIT POWER LEVEL DOCKET 110.

50-29 UlliT YAIACEE R0WE DATE 850402 COMPLETED BY S.IAf!PPLE TELEPH0llE (6171 872-8100 M0llTH MARCH,1985 DAY AVERA6E DAILY POWER LEVEL DAY AVERAGE DAILY POIER LEVEL (IRie-liet)

(Mlle-Met) 1 171.9 17 171.9 2

172.1 18 171.9 3

171.9 19 171.9 4

171.8 20 171.8 5

171.9 21 171.8 6

171.9 22 171.9 7

171.9 23 171.8 8

172.0 24 171.9 9

172.1 25 171.9 10 171.8 26 171.9 l

11 171.7 27 171.7 12 156.7 28 171.6 13 171.6 29 171.3 14 172.0 30 171.2 15 172.1 31 171.3 16 172.1 tilSTRUCT1011S On this format, list the average daily unit power level in Mlle-Net for each day in the reporting month.

Compute to the nearest whole negawatt.

l-l i-

UNIT SHUTDOWS AND POWER REDUCTIONS DOCKET NO.

50-29 UNIT YAIREE RONE REPORT M0llTH MARCH,1995 BATE 850402 COMPLETED BY S. HIPPLE TELEPHONE (617) 872-8100 Method Licensee Cause & i.orrective Duration 2 Di Shutting Event Systee Component Action to No.

Date Type (Hourst Reason Down Reactor 3 Report 4 Code 4 Code 5 Prevent Recurrence 85-4 3/12/85 S

18.00 Be 1

N/A N/A N/A N/A e Power reduction to repack bearing on 82 Boiler Feed Pump.

l l

1 2

3 4

F: Forced Reason:

Method:

Exhibit 6-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-flaintenance or Test 2-Manual Scras.

Entry Sheets for Licence C-Refueling 3-Automatic Scrae.

Event Report (LER) File D-Regulatory Restriction 4-Other (Explain)

(NURES-0161)

-E-Dperator Training & Licensed Examination F-Adeinistrative 5

6-Operational Error (Explain)

Exhibit ! - Saoe Source H-Other (Explain)

r-DOCKET NO.

50-29 INilT YANKEE RONE MTE 850402 COMPLETED BY S. INIIPPLE TELEPHONE 1 617) 872-0100 REPORT NONTH MARCH, 1985

SUMMARY

OF OPERATING EIPERIENCES 3/12/85 0600 Reduced lead to repair 92 Boiler Feed Pump t

I -

4 1

n A

l I

d

e.

YANKEE ATOMIC ELECTRIC COMPANY w " hone (6")s'-s'oo TWX 710-380-7619 p

y 1671 Worcester Roact Framing. sam, Massachusetts 01701 Yb'

[e Gi ;')

L 'r f.1 April 2, 1985 17.R.4.2 FYR 85-42 United States Nuclear Regulatory Commission Director, Office of Management Information and Program Control Washington, D. C. 20555

Dear Sir:

Submitted herewith is the Monthly Statistical Report for the Yankee Atomic Power Station for the month of March 1985.

Very truly yours, YANKEE ATOMIC ELECTRIC COMPANY M

L. H. Heider Vice President / Manager of Operations LHH/smh cc: Region I Office of Inspection and Enforcement

' l

+-

1 9

Q s

YANKEE ATOMIC NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 84-03 FOR THE MONTH OF MARCH 1985 l

l l

l l

l t

l