ML20129G305

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Apr 1985
ML20129G305
Person / Time
Site: Monticello 
Issue date: 04/30/1985
From: Musolf D, Myrabo A
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8507180013
Download: ML20129G305 (5)


Text

m

-Y g'

O OPERATING DATA REPORT DOCKET NO.

50-263______

DATE 1-85____

COMPLETED BY A. L. Myrabo TELEPHONE 612/295-5151 OPERATING STATUS INotes l

1. Unit Name : ________________________Monticelto l

l

2. Reporting period: ___________________ APRIL l

l

3. Licensed Thermal Power (MWt): ____________1670 l

l

4. Nameplate Rating (Gross MWe): _____________569 l

l

5. Design Electrical Rating (Net MWe): _____545.4 I

l

6. Maximum Dependable Capacity (Gross MWe): __564 1

1

7. Maximum Dependable Capacity (Net MWe):

____536 1

_______________________l

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since.Last Report, Give Reasons:

~

9. Power Level To Which Restricted, If Any (Net HWe): ___N/A___________________
10. Reasons For Restrictions, If Any: __N/A_____________________________________

This Month Yr.-to-Date Cumulative

11. Hours In Reporting Period

_____719

_____2879

____121272

12. Number Of Hours Reactor Was Critical

___710.6

___2445.1

__ 92360.5

13. Reactor Reserve Shutdown Hours

_____0.0

______0.0

_____940.7

14. H- -

Generator On-Line

___706.0

___2375.6

__ 90378.6

15. C

'eserve Shutdown Hours

_____0.0

______0.0

_______0.0 16.

. Therma L Energy Generated (MWH)

_1155115

_ 3824920

_145058734

17. Gross Electrical Energy Generated (MWH) __393970

__1311793

__46496846

18. Net Electrical Energy Generated (MWH)

__379526

__1261457

__44436340

19. Unit Service Factor

__ 98.2%

___ 82.5%

____ 74.5%

20. Unit Avaltability Factor

__ 98.2%

___ 82.5%

____ 74.5%

21. Unit Capacity Factor (Using MDC Net)

__ Y8.5%

___ 81.7%

____ 68.4%

22. Unit Capacity Factor (Using DER Net)

__ 96.8%

___ 80.3%

____ 67.2%

23. Unit Forced Outage Rate i.8%

0.7%

5.2%

24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each)

_1986 Refueling outage - Apr i l 12, 1986 - 33 days _______________________

25. If Shut Down At End Of Report Period, Estimated Date Of Startup:____________
26. Units In Test Status (Prior to Commercial Operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 8507180013 850430 PDR ADOCK 05000263 PDR R

g

\\l

s AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-263______

UNIT MonticelLo__

)

DATE 5

'i-85 COMPLETED BY A. L. Myrabo i

TELEPHONE 612/295-5151 1

MONTH ______ APRIL DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) i

__._______553____________

17

__________549____________

2

__________554____________

18

__________550____________

3

__________553____________

19 '

__________545____________

4

__________554____________

20

__________548____________

5

__________553____________

21

__________531____________

99

__________546____________

6

__________559____________

7

__________539____________

23

__________550____________

8

__________554____________

24

__________543____________

9

_____..____552____________

25

__________549____________

10

__________552____________

26

__________547____________

ii

__________297____________

27

__________550____________

12

__________274____________

28

__________520____________

13

__________456____________

29

__________549____________

14

__________546____________

30

__________549____________

15

__________551____________

31 16

__________549____________

INSTRUCTIONS On this format, List the average da i Ly uni t power Level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

(

s' NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE 50-263______

DOCKET NO.

DATE 5-1-85____

COMPLETED BY A. L. Myrabo TELEPHONE 612/295-5151 MONTH ______ APRIL 4-1-85 to Power Operation.

4-10-85 4-11-85 Load rejection / scram caused by system electrical grid problems.

4-12-85 to Power operation.

4-30-85 SPENT FUEL STORAGE UPDATE Fuel assemb Lies in core 484 Fuel assemb Lies in spent fuel storage pool 844 Licensed capacity 2237 Date of Last refueling that can be 1997 discharge with present capacity Note: Power operation defined as essentially 100% of rated power except for weekend Load drops for specified survellLance testing.

,j 50-2s3 DOCKET NO.

UNIT SHUTDOWNS AND POWER REDUCTIONS Monticello UNIT NAME DATE 5-1-85 COMPLETED BY A. L. Myrmhn REPORT Af0NTil APRIL TELEPHONE 619 / 90s_si si

=

Licensec g,

Cause & Corrective jg "k

]Y)

No.

Date,

gg 4

.3. s 5 Esent 3J E-]

Action to H

x:

5 gji =!

Report =

mO

,E Prevent Recerrence e

v d

5 4-11-85 F

13.0 H

3 N/A ZZZZ ZZZZZZ Generator load rejection / reactor scram due to. utility electrical'.

system transmission line problems.

?

I T

1 2

3 4

F: Forced Reason:

Method:

Exhibit G Instructions S: Schedaded A Equipment Failure (Explain) 14tanual for Preparatism of Dasa Bataintenance of Test 2-Manual Scram.

Entry Sheets for Licensee

3. Automatic Scram.

Event Report ILER) File INUREG.

C. Refueling D-Regulatory Restriethm 4-Other ( Explain) 0161) e E-Operator Temining & License Examinathm F-Administrative 5

G. Operational Error (Explaint Exhibit 1 Same Source 19!77)

Il-Other (Explaint O

T v-Northern States Power Company 414 NN:ollet Mall Minneapons. Minnesota 55401 Telephone (612) 330-5500 May 15, 1985 Director, Office of Resource Management U S Nuclear Regulatory Ccsemission Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Monthly Operating Report April, 1985 Attached are twelve copies of the Monthly Operating Report for April, 1985 for the Monticello Nuclear Generating Plant.

D Mw David Musolf Manager of Nuclear Su ort Services DMM/jk cc: Regional Administrator-III, NRC NRR Project Manager, NRC NRC Resident Inspector l

MPCA Attn: J W Ferman Attachment i

h t