-.. 7
~ ~,. -..-.,.~....- - - -.. ~ -..
~ -.
. -. -... - ~...~... _,....
-.. ~.. -,
SP49
'k UNITED STATES y
j NUCLEAR REGULATORY COMMISSION 2
WASHINGTON, D.C. 2066dWIO01 f
+#
September 25, 1996 Mr. Joseph Virgona, Project Manager U.S. Department of Energy Grand Junction Project Office e
l 2597 B 3/4 Road i
Grand Junction, Colorado 81501 i
SUBJECT:
FORMAT FOR ANNUAL INSPECTION REPORTS FOR UMTRCA TITLE I SITES
.j
Dear Mr. Virgona:
The U.S. Nuclear Regulatory Commission staff has completed its review of the U.S. Department of Energy's (DOE) proposed _ format for annual inspection 1
reports for Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I_
-1 sites. The 1996 annual inspection report for the UMTRCA Title I Lowman,.
l Idaho, project disposal site was prepared by DOE in the proposed format and j
provided to the NRC staff.for its review.
It is the NRC staff's understanding
' that, if it is found to be acceptable, DOE will submit future annual site
' inspection reports in the proposed format for sites placed under the NRC general license at 10 CFR 40.27.
Based on its review, the NRC staff-finds, in general; the format to be acceptable. The staff does, however,'have a couple of recommendations.
First, Criterion 12 of Appendix A to 10 CFR Part 40 requires that inspection results-for_.'all sites be reported within 90 days of the'last site inspection in that calendar year. However, for sites at which unusual damage or.
disruption is discovered during the inspection, a preliminary site, inspection q
- report is required within 60 days. The NRC staff recommends that site inspection reports identify upfront which type'of report that it-is.
Secondly, the NRC staff recommends that the first page of each inspection report contain a summary of the inspection observations and findings and reference the " Conclusions and Recoaniendations" section of the report-(Section 3.0 in the Lowman inspection r,eport) for details.
fd llYo g3m-SY 9610020163 960925 PDR WASTE WM-54 PDR uz'0014
d t
September 25, 1996 4
e i
l J. Virgona i If you have any questions about this letter, please contact Mr. James Park of my staff. He can be reached at (301) 415-6699.
i Sincerely, 4
j
/s/ Daniel Gillen For J. Hol6nich Joseph J. Holonich, Chief Uranium Recovery Branch j
Division of Waste Management Office of Nuclear Material
~
Safety and Safeguards i
cc:
J. Gatrell, DOE HQ C. Jones, Rust Geotech
}.
M. Plessinger, Rust Geotech 1
l DISTRIBUTION:
PUBLIC (FiliiE55Eif7 NMSS r/f
'RB r/f CAbrams u
AGarcia DOCUMENT NAME:
S:\\DWM\\ URB \\JRP\\ANNLREPT.LTR 1
0FC URB d-URB /% f C
URB Q /9,
1
. wiw w g NAME JPark DGillbn JHolonich DATE 9/2e[96
-9 /1I/96 Of 9/2f/96 0FFICIAL RECORD COPY i
a i
l t