ML20129G061

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Apr 1985
ML20129G061
Person / Time
Site: Farley 
Issue date: 04/30/1985
From: Mcdonald R, Woodard J
ALABAMA POWER CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8507170516
Download: ML20129G061 (5)


Text

..

k4 1

?

I l

l JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE

SUMMARY

OF OPERATIONS APRIL, 1985 There were no unit shutdowns or significant power reductions during the month of April:

The following major safety-related maintenance was performed in the month of April:

1.

Miscellaneous corrective and preventive maintenance was performed on the diesel generators.

2.

Replacement of containment tendon field anchors is complete.

A total of 130 vertical and sevea horizontal tendon field anchors have been removed, inspected and replaced.

1 l

t I

i l

Fue:q.

g33j I

.m

_-._7-_--

4 n

1 'v OPERATING DATA REPORT DOCKET NO. 50-364 lI DATE May 3.

1985 COMPLETED BY J D. Woodard

~

)

TELEPHONE nos) a90-5156 OPERATING STATUS I

1. Unit Name:

b anh M-Niav - l'n i e ?

1) Cumulative data since I
2. Reporting Pened. Anril. 1985 7-30-81, date of commercial 2652 j

3, Licensed Theneel Power (MWt):

860

4. Namepiste Rating (Genes MWe):

i 029

$. Domes Electrical Rating (Net MWe):

850.Z

6. Maxiseum Dependable Capeaty (Gross MWe):

i 0

1

7. Maximuse Dependable Capacity (Net MWe):

I

8. If Changes Occur in Capacity Ratings (Items Number 3 Tjuough 7) Since Last Report. Give Reasons:

i N/A N/A l

9. Power Level To Which Restricted. lf Any (Net MWe):

j

10. Rennens For Reetnctions. lf Any:

L'/A l

l

!O This Month Yr. to Dete Cuniulative I

719 2,879 32.904

!!. Hours la Reporting Pened 719*0 1.099.8 28,018.3

12. Nuneber Of Hours Reactor Was W O'O O*O 138 0 i
13. Reacter Reserve Shutdown Hours
14. Hours Generator On Line 719.0 I.055.0 z/,o33.i j
15. Unit Reestve Shutdown Hours 0.0 0.0 0.0
16. Gross Thennel Energy Generated (MWH) 1,861,582 2,470,023 69,322,77i 625,238 817,420 22,703,tuz j
17. Gross Electrieel Energy Generated (MWH) 3"'994 150,47Z 21.569.394 j
18. Net Electrieel Energy Generated (MWH) i
19. Unit Service Factor 100,0 36.6 g4,0 f
20. Unit Availability Facto, 100.0 36.6 84.o 1
21. Unit Capacity Factor (Using MDC Nt) 102.7 32.3 60.9 100.0 31.4 79,I i
22. Unit Capacity Factor (Using DER Nt) 0.0 2.6 5,4 i
23. Unit Forced Outage Rate

~

. Shutdowns Scheduled Over Next 6 Months (Type. Dete and Duration of Eachl:

24 4

N/A 1

1 i

25. If Shut Down At End Of Report Period. Estbnated Date of Startup:

N/A.

t

26. Units in Test Saatus (Prior to Commercial Operation):

Forecast Achieved

-i INITIAL CRITICALITY ns-nn_a1 05-08-R1 INITIAL ELECTRICITY 05-24-81 05-25-81 COMMERCIAL OPERATION 08-01-81 07-30-81

]

(9/77i

DOCXIT NO.

s n-an t, 2

un,r

[

DATT. M"V I*

I985 J. D. Woodard COMPLETED BY l

(205) 899-5156 TELEPHONE April, 1985 MONTl!

DAY AVERACE DAILY POWER LEVEL DAY AYERACE DAILY POWER LEVEL plWe Net)

OlWe Net) i g,

824 17 811 839 830 2

gg M 1 - -- -

_ -..... _ g 9 _

g30 3

831 830 4

791 830 3

21 6

827

, g, 828 838 824 7

g 842 827 g

4 9

845 23-827 10 Ala 26 A?R 833 828 gg g

810 12 23 821 828 824 g3 828 826 g4 30 15 83I 38 16 834 i

INSTRUCT.ONS On tids formst. fist the averste daily umt power icvet in MW'e Net for each day in the repoeting month. Campute to

, the nessert whole me;swait.

O O

O 30-364 UN4T StM11 DOWNS AND POWER REIMICIl0NS DOCKETNO. J. M. Farley - Unit.2 ggggyggg DATE May 3.

1985 COMPLETED sY 1 D. Woodard-REPORT MONfil Anrf1 14Rs TELEPl80NE (205) 899-5156 "t.

u

=

j~I 3s3 Evens

[i Acikas su

  • EG ticasse E,

Cause & Casseceive No.

Ibse

[

f

-[

j;fgg Nepsw #

g p,,,,,,g,g,,,,,,

in U u

e-d THERE WERE NO UNI E SHUTD MNS OR SI ;NIFICANT POL ER R1 DUCTIONS DURING THE MONTH OF APRIL.

I 2

3 4

F: Fusced Meason:

MeshoJ:

Exhibit G. las suctions S: Selieduled A-Equipocas Failuse(Emplain) 1 -Manual for Psepasasstai of Dasa B-Maintenance of Test 2 Maamal Scram.

Entry sheets foe t.iccusee C-Refuehag 3 Automatic Scraen.

Event Rep wa (t.ER n file (NUREG-D Reguiassay Ress:ection 4 Osleet (Emplain) 0161)

E4hiesaior Ts46ains A license Esamination F-Adadaistsasive 5

G Ope asianial Essur (Eng.laisa)

Eshdait I Same Souue

('J/77) 11Othc (Explain) 1

I.

i t.

is a4

. Altbams Power Company 6C0 Norm 18th Street Post Office Box 2641 04rmingham. Alabama 35291 Telephone 205 78M090 R. P. McDoneed Senior Vice President Fhntndge Bwiding

/\\lilkX)[ll3lDWCf ry s w,-o e,cn z, 4-m May 13, 1985 Docket No. 50-364 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

RE: Joseph M. Farley Nuclear Plant Unit 2 Monthly Operating Data Report Attached are two (2) copies of the April 1985 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 2, required by.Section 6.9.1.10 of Appendix A of the Technical Specifications.

If you have any questions, please advise.

Yours very t ly,,

b R. P. Mcdonald RPM /KWM: sam Enclosures xc: Director, IE (10 copies)

Director, RII (1 copy) te m. m n -

a m

_ _. __ _ _ _ _.________-_____-__.____________-___---____.-j