4 W OPERATING DATA REPORT DOCKET NO 50-341 UNIT FERMI-2 DATE 05-14-85 ,

COMPLETED BY A.E. Wegele TELEPHONE (313) 586-5313 OPERATING STATUS

1. REPORTING PERIOD Apri1 GROSS HOURS IN REPORTING PERIOD NA
2. CURRENTLY AUTHORIZED POWER LEVEL (MWe) 165 MAX DEPEND CAPACITY (MWe Net)

DESIGN ELECTRICAL RATING (MWe Net) 1150

3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe Net)
4. REASONS FOR PISTRICTION (IF ANY)

THIS MONTH YR TO DATE CUMULATIVE

5. NUMBER OF HOURS REACTOR WAS CRITICAL 0 0 0
6. REACTOR RESERVE SHUTDOWN HOURS 0 0 0
7. HOURS GENERATOR ON LINE 0 0 0
8. UNIT RESERVE SHUTDOWN HOURS 0 0 0
9. GROSS THERMAL ENERGY GENERATED (MWH) 0 0 0
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 0 0
11. NET ELECTRICAL ENERGY GENERATED (MWH) 0 0 0
12. REACTOR SERVICE FACTOR NA NA NA
13. REACTOR AVAILABILITY FACTOR HA NA NA
14. UNIT SERVICE FACTOR NA NA NA
15. UNIT AVAILABILITY FACTOR NA NA NA
16. UNIT CAPACITY FACTOR (Using MDC) NA NA NA
17. UNIT CAPACITY FACTOR (Using Design MWe) NA NA NA
18. UNIT FORCED OUTAGE RATE NA NA NA
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH)
20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP 05-17-85
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) FORECAST ACHIEVED INITIAL CRITICALITY 05-17-85 INITIAL ELECTRICITY 06-18-85 COMMERCIAL OPERATION 09-30-85
  • TO be determined 8507170507 850430 p PDR R

ADOCK 05000341 PDR

/

M- \t I

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-341 UNIT FERMI-2 DATE 05-14-85 .

COMPLETED BY A.E. Wege1e TELEPHONE (313) 586- 5313 MONTH April I' l

- DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL [

(MWe-Net)- .(MWe-Net) 1 0 17 0 t 2 0 18 0 3 0 19 0-  !

4 0 20 0- l

5. 0 21 0  ?

6 0 22 0  ;

7 0 23 0 8 0 24 0

+

9- 0 25 - 0 4

10_ 0 26 0 i

-11 0 27 0 ,-

12 0 28 :0- ,

l- 13 0 29 0 14 0 30 0 15 -0 31 0 16 0 j

1 l

_ - - . ~ . . . . _ - _ _._ _ _ _ _ . _ _ . _ _ . _ _ . _ _ _ _ _ . - - _ . _ - - . . _ _ _ . _ _ _ . . _ _ . _ __. _ , ___ _ _. - .-

DOCKET'NO.. 50-341 UNIT SHUTDOWNS AND POWER-REDUCTIONS. UNIT NAME FERMI 2-DATE 05-14-85 COMPLETED BY. A.E. Wegole REPORT MONTH Apri! . TELEPHONE (313). 586 5313 -

.n wms. o < ; meo; .

=i p..mo,~=wmSxm.

wal i.. -

i i.

==m.

mom, om xs-o es i m .

.mo..

.vo  :

moz40 mms cM.. .

w'.l.. E! E -! C*l .

NO  !

DATE l

ho . ~ = .

@ E O M E C l~

m m n. m o o... ..

CORRECTIVE ACTIONS / COMMENTS l i  ;  ;  ; i.  ;

e i . . i. . . .

-- .l .None- l -l, r - . . . . . . ,

.i. . . . . . .

, t

' l_  !  !-  !  !  !  !

i

'(1) REASONS I

A. EQUIPMENT FAILURE (EXPLAIN) .E. OPERATOR TRAINING AND LICENSE EXAMINATION B. MAINT OR TEST F. ADMINISTRATIVE C. REFUELING. .

G. OPERATIONAL ERROR (EXPLAIN)

D. REGULATORY' RESTRICTION- H. OTHER (EXPLAIN)

(2) METHOD.

. , 1. ' MANUAL 3. AUTOMATIC SCRAM

. y  : 2. MANUAL SCRAM 4. OTHER (EXPLAIN)

( I w . -- - - , - - - - - , -,_

}- ..

D'eholt ~

Edison !E5?n*=

May 14, 1985 HP-85-471 U. S._ Nuclear Regulatory CommiGGion Attention: Director, Office of Resource Management Washington, D.C. 20555 Gentlemen:

Reference:

Fermi 2 NRC Operating License No. NPF-33

Subject:

Monthly Operatina Status Report for April 1985 Enclosed for your information and use is the Fermi 2 Honthly Operating Status Report for April 1985. The report includes the Operating Data Report, Average Daily Unit Power Level, and the Summary of Unit Shutdowns and Power Reductions identified in DRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 6.9.1.6.  !

If you have any questions, please contact us.

Sincerely,

"/

R. S. Lenart Superintendent Nuclear Production Enclosure cc: Mr. P. M. Byron Regional Administrator USNRC Region III 799 Roosevelt Road Glen-Ellyn, IL_60137 I