Provides Addl Info as Suppl to TS Change Requests 188 & 189.Summary of RPS & ESFAS Functions Actuated & Rept on Setpoint Methodology for Overtemp T Withheld
ML20129F793
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 09/26/1996
From: Link B
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML19355E414 List:
References
VPNPD-96-075, VPNPD-96-75, NUDOCS 9610020093
Download: ML20129F793 (2)


Text

v-T Wisconsin Electnc POWER COMPANY 231 W Mchegon, PO Box 2046. Mdwoukee WI 53201 2046 (414)221 2345 VPNPD-96-075 10 CFR 50.4 10 CFR 50.90 September 26,1996 Document Control Desk US NUCLEAR REGULATORY COMMISSION Mail Station PI-137 Washington, DC 20555 Gentlemen:

DOCKETS 50-266 AND 50-301 SUPPLEMENT TO TECliNICAL SPECIFICATIONS CilANGE REOUESTS 188 AND 189 POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 By letters dated June 4,1996, Wisconsin Electric Power Company, Licensee for the Point Beach Nuclear Plant, submitted Technical Specifications Change Requests 188 and 189. These requests proposed amendments to the Point Beach Technical Specifications that were identified by analyses performed in support of Unit 2 operations following replacement of steam generators this fall. The revisions proposed in Change Request 188 modify Technical Specification Section 15.2.3, " Limiting Safety System Settings and Protective Instrumentation,"

and Section 15.5.3, " Design Features - Reactor." The revisions proposed in Change Request 189 modify Sections 15.2.1, " Safety Limit, Reactor Core;" 15.2.3, " Limiting Safety System Settings, Protective Instrumentation;" and 15.3.1.G, " Operational Limitations."

We are providing additional information as attachments to this letter. This additional information includes the following:

Setpoint uncertainty analysis for the proposed Technical Specification setting for Steam Generator low-low level which shows that appropriate margins between the safety analysis acceptance criteria and Technical Specification limits are maintained.

An error in the steam generator tube rupture dose analysis results was discovered and has been corrected in the FS AR. mark-up for the steam generator tube rupture accident.

An additional Technical Specifications basis is being changed in Section 15.3.4. This basis contains a value for secondary side water volume in a steam generator for the Westinghouse Model 44 steam generator which will no i

longer be used at PBNP when the Unit 2 steam generators are replaced.

Clarification of the FSAR mark-up that showed the total primary heat output changing from 1518.5 MWt to 1524.5 MWt.

'fDf'1 610056 ylL ly

[t1 Ock OF f Cb.MibMm 9610020093 960926 f

I IM PDR ADOCK 05000266-P pyg We%muiderpessur

P.

l....,

Document Control Desk September 26,1996

(

1 Page 2 I

The previously provided uncertainty analysis related to the Overtemperature and Overpower-delta-T setpoints contained information which is proprietary to the Westinghouse Electric Corporation. Accordingly, we requested that this information be withheld from public disclosure. We are providing a non-proprietary version of this material together with an affidavit in accordance with the requirements of 10 CFR 2.790.

- We have determined that the proposed amaadments do not involve a significant hazards consideration, authorize a significant change in the types or total amounts of any effluent release, or result in any significant increase in individual or cumulative occupational exposure. Therefore, we conclude that the proposed amendments meet the requirements of 10 CFR 51.22(c)(9) and that an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared. The original "No Significant Hazards" determinations for operation under the proposed Technical Specifications remain applicable.

Our replacement outage is presently scheduled to commence on October 5,1996. We request approval of these changes by October 31,1996, with implementation to occur prior to startup of Unit 2 from the outage. This will l

casure the amendments are implemented and appropriate training is performed prior to operation.

l If you require additional information, please contact us.

Sincerely, y

. Bob Link Vice President l

Nuclear Power j

CAC cc: NRC Resident inspector i

NRC Regional Administrator PSCW l

Subscribed to and sworn fore me on this Mday of S,

.1996.

0%1 b

ry I blic, state of Wisconsin

- My conunission expires 0 /27 f 9(,