ML20129F714

From kanterella
Jump to navigation Jump to search

Forwards SE Re Reinspection Results for Core Shroud Vertical Welds for Plant,Unit 1
ML20129F714
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 10/24/1996
From: Jabbour K
NRC (Affiliation Not Assigned)
To: Beckham J
GEORGIA POWER CO.
Shared Package
ML20129F719 List:
References
TAC-M95359, NUDOCS 9610290197
Download: ML20129F714 (3)


Text

_

l October 24, 1996 Mr. J. T. B:ckham, Jr.

Vice President - Plant Hatch Georgia Power Company P. O. Box 1295 Birmingham, Alabama 35201 l

SUBJECT:

SAFETY EVALUATION OF THE REINSPECTION RESULTS FOR THE CORE SHROUD VERTICAL WELDS - EDWIN I. HATCH NUCLEAR PLANT, UNIT 1 (TAC NO. M95359)

Dear Mr. Beckham:

1 By letter dated May 7,1996, you submitted the reinspection results and flaw evaluations for the core shroud vertical welds of Hatch Nuclear Plant, Unit 1.

You reported the discovery of indications associated with welds V5 and V6.

i Also, by letter dated July 16, 1996, you supplemented the original submittal with your response to the staff's request for additional information.

Based i-on your evaluation of the indications, using linear elastic fracture mechanics and limit load analysis, you concluded that the indications are well below the allowable lengths.

4 Based on the enclosed safety evaluation, the NRC staff finds that your flaw evaluation is acceptable.

This completes our action regarding the above TAC.

If you have any questions regarding this matter, please contact me at (301) 415-1496.

Sincerely, original signed by Kahtan N. Jabbour, Senior Project Manager Project Directorate 11-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation Docket No. 50-321

Enclosure:

As stated PUBLIC PDII-2 r/f i

l SVarga DF0l JZwolinski OGC, 0-15818 ACRS, TWF EMerschoff, RII PSkinner, RII CECarpenter Tor:ceiveacopyofthisdocument,indicateJnthebox:

"C" = copy without attachment / enclosure "E" = Copy with attacAment/ enclosure.

"N" = No copy 0FFICE PM:PD22:DRPE E LA:PD&2hf3/ ABf:fiplVl PDiM2 /l l

NAME KJABBOUR:cdw LBERRYJ V R$fCfiHAfl HBERi QW/

DATE

/.

/96

/ 0 / M '/96

/ O /;M496

' 1:'/ h /96

/

/96

/

/96 J0CUMENT NAME: G:\\ HATCH \\ VERTICAL. LEE /

/q OFFICIAL RECORD COPY 9610290197 96 er4d P

'1024EJ2 NPS RLE CENTEPi COPY

fpRfC\\

p" 4%

UNITED STATES j

j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20565-0001 4

October 24, 1996 Mr. J. T. Beckham, Jr.

Vice President - Plant Hatch Georgia Power Company P. O. Box 1295 Birmingham, Alabama 35201

SUBJECT:

SAFETY EVALUATION OF THE REINSPECTION RESULTS FOR THE CORE SHROUD j

VERTICAL WELDS - EDWIN I. HATCH NUCLEAR PLANT, UNIT 1 (TAC N0. M95359)

J

^

Dear Mr. Beckham:

By letter dated May 7,1996, you submitted the reinspection results and flaw evaluations for the core shroud vertical welds of Hatch Nuclear Plant, Unit 1.

You reported the discovery of indications associated with welds V5 and V6.

Also, by letter dated July 16, 1996, you supplemented the original submittal with your response to the staff's request for additional information.

Based on your evaluation of the indications, using linear elastic fracture mechanics and limit. load analysis, you concluded that the indications are well below the allowable lengths.

Based on the enclosed safety evaluation, the NRC staff finds that your flaw

]

evaluation is acceptable. This completes our action regarding the above TAC.

If you have any questions regarding this matter, please contact me at (301) 415-1496.

Sincerely, bMt. M.

Kahtan N. Jabbour, Senior Project Manager Project Directorate II-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation Docket No. 50-321

Enclosure:

As stated

s,

a Mr. J. T. Beckham, Jr.

Georgia Power Company Edwin I. Hatch Nuclear Plant cc:

Mr. Thomas P. Mozingo Mr. Ernest L. Blake, Jr.

Program Manager Shaw, Pittman, Potts and Trowbridge Nuclear Operatior.s 2300 N Street, NW.

Oglethorpe Power Corporation Washington, DC 20037 2100 East Exchange Place P. O. Box 1349 Mr. D. M. Crowe Tucker, Georgia 30085-1349 Manager Licensing - Hatch Georgia Power Company Charles A. Patrizia, Esquire P. O. Box 1295 Paul, Hastings, Janofsky & Walker Birmingham, Alabama 35201 10th Floor 1299 Pennsylvania Avenue Mr. L. Sumner Washington, DC 20004-9500 General Manager, Nuclear Plant Georgia Power Company Mr. Jack D. Woodard P. O. Box 439 Senior Vice President Baxley, Georgia 31513 Georgia Power Company P. O. Box 1295 Resident Inspector Birmingham, Alabama 35201 U.S. Nuclear Regulatory Commission 11030 Hatch Parkway North Chairman Baxley, Georgia 31513 Appling County Commissioners County Courthouse Regional Administrator, Region II Baxley, Georgia 31513 U.S. Nuclear Regulatory Commission 101 Marietta Street, NW. Suite 2900 Steven M. Jackson Atlanta, Georgia 30323 Senior Engineer - Power Supply Municipal Electric Authority Mr. Charles H. Badger of Georgia Office of Planning and Budget 1470 Riveredge Parkway, NW i

Room 610 Atlanta, Georgia 30328-4684 3

270 Washington Street, SW.

Atlanta, Georgia 30334 Warren Bilanin, EPRI Task Manager i

3412 Hillview Ave.

Harold Reheis, Director Palo Alto, California 94303 Department of Natural Resources 205 Butler Street, SE., Suite 1252 Robin Dyle, Technical Chairman Atlanta, Georgia 30334 BWRVIP Assessment Task Southern Nuclear Operating Company Post Office Box 236 40 Inverness Center Parkway Birmingham, Alabama 35201