ML20129F661
| ML20129F661 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 09/27/1996 |
| From: | Hannon J NRC (Affiliation Not Assigned) |
| To: | Link R WISCONSIN ELECTRIC POWER CO. |
| References | |
| NUDOCS 9610020050 | |
| Download: ML20129F661 (2) | |
Text
-
Mr. Robert E. Link, Vice President September 27, 1996 Nuclear Power Department i
Wisconsin Electric Power Company
'231 West Michigan Street, Room P379 Milwaukee, WI 53201 l'
l
SUBJECT:
CHANGE OF NRC PROJECT MANAGER FOR THE POINT BEACH NUCLEAR PLANT, UNIT NOS. 1 AND 2 l
Dear Mr. Link:
4 Effective October 13, 1996, NRC Project Directorate responsiblity for the j
Point Beach Nuclear Plants, Unit Nos. I and 2 will be transferred from Project Directorate III-3 to Project Directorate III-1.
Project Management responsibility will be transferred from Allen Hansen to Linda Gundrum, i
All. direct correspondence for the Project Manager should be sent to:
I Linda L. Gundrum (Point Beach)
U. S. Nuclear Regulatory Commission Mail Stop OWFN/13-D-18 j
Washington, DC.'20555 l
I can be reached at (301) 415-1340.
The telephone number for Ms. Gundrum is (301) 415-1380.
4 Please revise your records to reflect these changes.
Sincerely, i
Original signed by:
John N. Hannon, Director Project Directorate III-l 4
j Division of Reactor Projects - III/IV Office of Nuclear Reactor Regulation 1
Docket Nos. 50-266 and 50-301 cc: See next page DISTRIBUTION:
Docket File PUBLIC g'D PDIII-3 Reading OGC ACRS JCaldwell, RIII M. Chaney DOCUMENT NAME: G:\\PTBEACH\\PMCHG.LTR To eoeshe e espy of this desumeew. Indsete in the ben:
"C" = Copy without encloeuves *E' = Copy with enclosures "N" = No copy 0FFICE PDIII-3:LA L
POIII-3:PM l C PDIII-1:D/;l NAME OFoster-Curteen LGundrum M S JHannon VI DATE 09fff96
/AS - 09k7/96 09/fA/96 0FFICIAL RECORD COPY 0129.!.8 M A
r_
Mr. Robert E. Link, Vice President Point Beach Nuclear Plant Wisconsin Electric Power Company Unit Nos. I and 2 cc:
Ernest L. Blake, Jr.
Shaw, Pittman, Potts & Trowbridge 2300 N Street, N.W.
Washington, DC 20037 Mr. Gregory J. Maxfield, Manager Point Beach Nuclear Plant Wisconsin Electric Power Company 6610 Nuclear Road Two Rivers, Wisconsin 54241 Mr. Ken Duveneck Town Chairman Town of Two Creeks 13017 State Highway 42 Mishicot, Wisconsin 54228 Chairman Public Service Commission of Wisconsin P.O. Box 7854 Madison, Wisconsin 53707-7854 Regional Administrator U.S. NRC, Region III 801 Warrenville Road Lisle, Illinois 60532-4531 l
Resident Inspector's Office U.S. Nuclear Regulatory Commission 6612 Nuclear Road Two Rivers, Wisconsin 54241 Ms. Sarah Jenkins Electric Division Public Service Commission of Wisconsin P.O. Box 7854 Madison, Wisconsin 53707-7854 4
i l