Forwards Insp Rept 50-271/96-08 on 960714-0831.No Violations Noted
ML20129E889
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 09/24/1996
From: Conte R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Reid D
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML20129E892 List:
References
NUDOCS 9610010190
Download: ML20129E889 (2)


See also: IR 05000271/1996008

Text

s

-,

-

9

4

4

.

September 24,1996

'

Mr. Donald Reid

Vice President, Operations

'

Vermont Yankee Nuclear Power Corporation

RD 5, Box 169

Ferry Road

Brattleboro, Vermont 05301

SUBJECT:

NRC INTEGRATED INSPECTION REPORT 50-271/96-08

Dear Mr. Reid:

.

l

l

On August 31,1996, the NRC completed an inspection at your Vermont Yankee reactor

j

facility. The enclosed report presents the results of that inspection.

During the 7-week period covered by this inspection period, the conduct of activities, in

i

general, at the Vermont Yankee facility reflected safety-conscious operations, sound

engineering and maintenance practices, and careful radiological work controls.

i

Overall, plant operations staff performance continued to be good as activities progress

towards the end of Cycle 18 operations and the planned refuel outage. Inspector review

l

determined that your staff 'was implementing a Security Program that effectively protects

j

public health and safety. Also in the functional area of plant support, we found that VY

has an overall effective program for radioactive material and radiological waste

,

_

management and transportation. In addition, the UFSAR had been apprapriately

i

maintained regarding radioactive waste systems.

l

Efforts have been noted to improve performance in the engineering functional area.

i

)

However, the effectiveness of these efforts have not yet been confirmed, and will be

addressed during future engineering inspections. During the Apper. dix R follow-up

inspection, the inspector determined that the design modifications were of good quality,

,

well supported with sound technical design basis, and in conformance with the established

i

'

design control procedures. The inspector noted that the VY staff had made good progress

in addressing Appendix R program-related problems.

1

l

No reply to this report is necessary and your cooperation with us is appreciated.

i

Sincerely,

<

9610010190 960924

ADOCK 0500

1

gDR

Richard J. Conte, Chief

Reactor Projects Branch 5

'

,

Division of Reactor Projects

Enclosure: NRC Inspection Report 50-271/96-08

j

-

g/

Docket No. 50-271

-

.-..... -

-

-

.-.

.

.

,

,

=

Mr. Donald A. Reid

2

'

cc w/ encl:

)

R. Wanczyk, Plant Manager

J. Thayer,' Vice President, Vermont Yankee Nuclear Power Corp.

,

l

J. Duffy, Licensing Engineer, Vermont Yankee Nuclear Power Corporation

J. Gilroy, Director, Vermont Public Interest Research Group, Inc.

!

D. Tefft, Administrator, Bureau of Radiological Health, State of New Hampshire

'

Chief, Safety Unit, Office of the Attorney General, Commonwealth of

j

Massachusetts

!

R. Gad, Esquire

!

G. Bisbee, Esquire

!

T. Rapone, Massachusetts Executive Office of Public Safety

State of New Hampshire, SLO Designee

!

State of Vermont, SLO Designee

(

. Commonwealth of Massachusetts, SLO Designee

]

Distribution w/ encl:

Region i Docket Room (with concurrences)

'

PUBLIC

Nuclear Safety Information Center (NSIC)

NRC Resident inspector

D. Screnci, PAO

R. Conte, DRP

H. Eichenholz

C. O'Daniell,' DRP

Distribution w/enci (VIA E-MAIL):

W. Dean, OEDO

. S. Bajwa, PDI-1, NRR

D. Dorman, PM, NRR

R. Correia, NRR

R. Frohm, Jr., NRR

inspection Program Branch, NRR (IPAS)

,

l

DOCUMENT NAME: G:\\ BRANCH 5\\VY9608. INS

Ta receive e copy of this docu,nont, bubcate in the bos:

'C" = Copy without ettechment/ enclosure

"E" = Copy with attachment / enclosure

  • N" = No copy

OFFICE

Rl/DRP

l

Rl/DRP y

j

/

l

l

l

%

NAME

WCook )0 {Q/

RConteg jy4/

DATE

09/18/96 (/

09 @ 6(/

09/ /96

09/ /96

09/ /96

OFFICIAL RECORD COPY

.