s
-,
-
9
4
4
.
September 24,1996
'
Mr. Donald Reid
Vice President, Operations
'
Vermont Yankee Nuclear Power Corporation
RD 5, Box 169
Ferry Road
Brattleboro, Vermont 05301
SUBJECT:
NRC INTEGRATED INSPECTION REPORT 50-271/96-08
Dear Mr. Reid:
.
l
l
On August 31,1996, the NRC completed an inspection at your Vermont Yankee reactor
j
facility. The enclosed report presents the results of that inspection.
During the 7-week period covered by this inspection period, the conduct of activities, in
i
general, at the Vermont Yankee facility reflected safety-conscious operations, sound
engineering and maintenance practices, and careful radiological work controls.
i
Overall, plant operations staff performance continued to be good as activities progress
towards the end of Cycle 18 operations and the planned refuel outage. Inspector review
l
determined that your staff 'was implementing a Security Program that effectively protects
j
public health and safety. Also in the functional area of plant support, we found that VY
has an overall effective program for radioactive material and radiological waste
,
- _
management and transportation. In addition, the UFSAR had been apprapriately
i
maintained regarding radioactive waste systems.
l
Efforts have been noted to improve performance in the engineering functional area.
i
)
However, the effectiveness of these efforts have not yet been confirmed, and will be
addressed during future engineering inspections. During the Apper. dix R follow-up
inspection, the inspector determined that the design modifications were of good quality,
,
well supported with sound technical design basis, and in conformance with the established
i
'
design control procedures. The inspector noted that the VY staff had made good progress
in addressing Appendix R program-related problems.
1
l
No reply to this report is necessary and your cooperation with us is appreciated.
i
Sincerely,
<
9610010190 960924
ADOCK 0500
1
gDR
Richard J. Conte, Chief
Reactor Projects Branch 5
'
,
Division of Reactor Projects
Enclosure: NRC Inspection Report 50-271/96-08
j
-
g/
Docket No. 50-271
-
.-..... -
-
-
.-.
.
.
,
,
=
Mr. Donald A. Reid
2
'
cc w/ encl:
)
R. Wanczyk, Plant Manager
J. Thayer,' Vice President, Vermont Yankee Nuclear Power Corp.
,
l
J. Duffy, Licensing Engineer, Vermont Yankee Nuclear Power Corporation
J. Gilroy, Director, Vermont Public Interest Research Group, Inc.
!
D. Tefft, Administrator, Bureau of Radiological Health, State of New Hampshire
'
Chief, Safety Unit, Office of the Attorney General, Commonwealth of
j
!
R. Gad, Esquire
!
G. Bisbee, Esquire
!
T. Rapone, Massachusetts Executive Office of Public Safety
State of New Hampshire, SLO Designee
!
State of Vermont, SLO Designee
(
. Commonwealth of Massachusetts, SLO Designee
]
Distribution w/ encl:
Region i Docket Room (with concurrences)
'
PUBLIC
Nuclear Safety Information Center (NSIC)
NRC Resident inspector
D. Screnci, PAO
R. Conte, DRP
H. Eichenholz
C. O'Daniell,' DRP
Distribution w/enci (VIA E-MAIL):
W. Dean, OEDO
. S. Bajwa, PDI-1, NRR
R. Correia, NRR
R. Frohm, Jr., NRR
inspection Program Branch, NRR (IPAS)
,
l
DOCUMENT NAME: G:\\ BRANCH 5\\VY9608. INS
Ta receive e copy of this docu,nont, bubcate in the bos:
'C" = Copy without ettechment/ enclosure
"E" = Copy with attachment / enclosure
- N" = No copy
OFFICE
Rl/DRP
l
Rl/DRP y
j
/
l
l
l
%
NAME
WCook )0 {Q/
RConteg jy4/
DATE
09/18/96 (/
09 @ 6(/
09/ /96
09/ /96
09/ /96
OFFICIAL RECORD COPY
.
_-.
-,.
-
- . . .
-- ..
.
-
_
. . _ _ -