ML20129E595

From kanterella
Jump to navigation Jump to search
Ack Receipt of Re Rev 29 to Physical Security Plan for Plant Under Provision of 10CFR50.54(p)
ML20129E595
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 10/23/1996
From: Stephen Dembek
NRC (Affiliation Not Assigned)
To: Feigenbaum T, Harpster T
CONNECTICUT YANKEE ATOMIC POWER CO.
References
NUDOCS 9610280108
Download: ML20129E595 (3)


Text

Oct6ber 23, 1996

{

Mr. Ted C. Feigenbaum Executive Vice President and Chief Nuclear Officer c/o Mr. Terry L'. Harpster Director - Nuclear. Licensing Services P.O. Box 128 Waterford, CT 06385

SUBJECT:

10 CFR 50.54(P) SUBMITTAL FOR HADDAM NECK PLANT

Dear Mr. Feigenbaum:

This letter acknowledges receipt of Connecticut Yankee Atomic Power Company's (CYAPC0) letter dated February 23, 1996, which transmitted Revision 29 to the Physical Security Plan for the Haddam Neck Plant under the provisions of 10 CFR 50.54(p).

Based on CYAPC0's determination that the changes do not decrease the overall ,

effectiveness of your security plan and after limited review of the changes, i no NRC approval is required, in accordance with 50.54(p). Implementation of  !

these changes will be subject to inspection to_ confirm that the changes have not decreased the overall effectiveness of your security plan.

The enclosures to CYAPC0's letter contain. Safeguards Information of a type specified in 10 CFR 73.21 and will be withheld from public disclosure. In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of' CYAPC0's letter, less enclosure (s), will be placed in the NRC Public Document Room.

Sincerely, (Original Signed By)

Stephen Dembek, Project Manager Northeast Utilities Project Directorate Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket No. 50-213 cc: See next page Distributio.n:  ;

Docket Files EKoup ,

5 D

PUBLIC SVarga  :

PDI-3 RF JZwolinski '

PSGB r/f TMartin i OGC i AC'c JFRt.gge , RI hgQY l l

DOCUMENT NAME: G:\DEMBEK\HADMNECK.54p g$ fkk.k. b

  • SEE PREVIOUS CONCURRENCE 4 v.

.h . ...y . w. docum.nt. kime. . in th. boa: c copy without .it. chm.nt/enewsur. r . Copy wnh attachm.ntierclosur. N - Na popy 0FFICE PSAB:D)fM C 3C:PSGB:NRR LA:NUPD \M), PM:NUPD n 0:$ P7 NAME EWElr ee lt LJCunningham

  • LBerry A Q' SDembek d h J g_ PMdkei(

DATE 10/ 1.2,/96 10/21/96 10/1/k'/96 10/1 3 /96 10/ Q /96

~

9610290108 961023 PDR ADOCK 05000213 F PDR

ssw ay l g

[p 4 UNITED STATES g j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20665-0001 l

o

% ,, ,# October 23, 1996 Mr. Ted C. Feigenbaum Executive Vice President and Chief Nuclear Officer c/o Mr. Terry L. Harpster Director - Nuclear Licensing Services P.O. Box 128 Waterford, CT 06385

SUBJECT:

10 CFR 50.54(P) SUBMITTAL FOR HADDAM NECK PLANT Dear Mr. Feigenbaum-This letter acknowledges receipt of Connecticut Yankee Atomic Power Company's (CYAPCO) letter dated February 23, 1996, which transmitted Revision 29 to the Physical Security Plan for the Haddam Neck Plant under the provisions of 10 CFR 50.54(p).

Based on CYAPCO's determination that the changes do not decrease the overall effectiveness of your security plan and after limited review of the changes, no NRC approval is required, in accordance with 50.54(p). Implementation of these changes will be subject to inspection to confirm that the changes have not decreased the overall effectiveness of your security plan.

The enclosures to CYAPCO's letter contain Safeguards Information of a type specified in 10 CFR 73.21 and will be withheld from public disclosure. In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of CYAPC0's letter, less enclosure (s), will be placed in the NRC Public Document Room.

Sincerely,

/

Stephen Dembek, Project Manager Northeast Utilities Project Directorate Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket No. 50-213 cc: See next page l

4

.I T. Feigenbaum Haddam Neck Plant Northeast Utilities Service Company cc:

Lillian M. Cuoco, Esq. Mr. S. E. Scace, Vice President Senior Nuclear Counsel Nuclear Reengineering Implementation Northeast Utilities Service Company Northeast Utilities Service Company P.O. Box 270 P.O. Box 128 Hartford, CT 06141-0270 Waterford, CT 06385 Mr. Kevin T. A. McCarthy, Director Regional Administrator Monitoring and Radiation Division Region I Department of Environmental Protection U.S. Nuclear Regulatory Commission 79 Elm Street 475 Allendale Road Hartford, CT 06106-5127 King of Prussia, PA 19406 Mr. Allan Johanson, Assistant Director Board of Selectmen Office of Policy and Management Town Office Building Policy Development and Planning Division Haddam, CT 06438 80 Washington Street Hartford, CT 06106 Resident Inspector Haddam Neck Plant Mr. J. J. LaPlatney c/o U.S. Nuclear Regulatory Commission Haddam Neck Unit Director 361 Injun Hollow Road Connecticut Yankee Atomic Power Company East Hampton, CT 06424-3099 362 Injun Hollow Road East Hampton, CT 06424-3099 Mr. A. M. Callendrello Licensing Manager - Haddam Neck Mr. D. B. Miller, Jr. North Atlantic Energy Service Corp.

Senior Vice President P.O. Box 300 Nuclear Safety and Oversight Seabrook, NH 03874 Northeast Utilities Service Company P.O. Box 270 Mr. James S. Robinson Hartford, CT 06141-0270 Manager, Nuclear Investments and Administration Mr. E. A. DeBarba New England Power Company Vice President - Nuclear Technical Services 25 Research Drive Northeast Utilities Service Company Westborough, MA 01582 P.O. Box 128 Waterford, CT 06385 Mr. B. D. Kenyon President - Nuclear Group Mr. F. C. Rothen Northeast Utilities Service Company Vice President - Nuclear Work Services P. O. Box 128 Northeast Utilities Service Company Waterford, CT 06385 P.O. Box 128 Waterford, CT 06385