i AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT

"*I' l' "*3 NRC-04 92 040

2. AMENDMENT /MODlflCATION NO.
3. EFFECTIVE DATE
4. REQUISITION / PURCHASE REQ. NO.
5. PROJECT NO.

(!f applicable)

Twelve (12)

$ @ 2 0 1996 RFPA dtd. 6/24/96 RES-C96 118

6. ISSUED BT CODE
7. ADMINISTERED Sy CODEI (if other than Item 6)

US Nuclear Regulatory Commission DivIsionofcontracts U.S. Nuclear Regulatory Conunission Division of Contracts Washington, DC 20555 washington, DC 20555

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP code) 9A. AMENDMENT OF SOLICITATION NO.

The Pennsylvania State University Office of Sponsored Programs 110 Technology Center 98* DATED (SEE ITEM 11)

University Park, PA 16802 Technical

Contact:

A.J. Baratta 10A. MODIFICATION OF CONTRACT / ORDER NO.

TeleMone: (814) 865 0044 x

NRC0492040 108. DATED (SEE ITEM 13)

CODE l FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS O The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of offers O is extended, licitation or as amendedOfferors must acknowledge receipt of this amendment prior to the hour and O is not extended.

date specified in the so by one of the following methods: (a) By completing Items 8 and 15, stT1 returning co By acknowled ng receipt of this amendnent on each copy of the of fer submitted

  • or (c) pies of the amendnent; (b By se rate letter or te egram which i tudes a reference to the solicitation and amerdent rubers. FAILUR$ OF YOUR ACKN EDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEXPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendnent you desire to change sn offer already submitted such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitatlon and this amendnent, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)

BER: 66013115005 JCN: L1971 APPN: 31x0200.660 BOC: 252A ODLICATE S12,000.00

13. THl$ ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS / ORDERS, IT MODIFIES THE CONTRACT / ORDER NO. AS DESCRIBED IN ITEM 14.
p. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN i

THE CONTRACT ORDER NO. IN ITEM 10A.

l B. THE ABOVE NUMBERED CONTRACT / ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as cP arges in paying X

office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.1u3(b).

C. THIS SUPPLLMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

Mutual consent of the parties.

D. OTHER (Specify type of modification and authority)

Mutual agreement of both parties.

E. IMPORTANT: Contractor O is not, @ is required to sign this docunent and return 2

copies to the issuing office.

14. DESCRIPTION OF AMENDMENT / MODIFICATION (Organized by UCF section headings, including solicitation / contract l

l subject matter where feasible.)

l See pages 2-3 for description of modification.

DV l

Dl l

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and ef fect.

7 5A. NAME AND TITLE OF $1GNER (Type or print) r16A. NAME AND, TITLE OF CONTRACTING OFFICER (Type or print)

Robe Kl11oren, Director, OSP

$ Mar I. Mace, g ntr3cting Officer 158.,p Rd CTOR/OF N

15C. DATE SIGNED 1 68. U, STATES OF

. ICA 16C. DA E SI NED (Sigriture' of person authorired to si )

(Signature of CUntVacting Of fic

/

NSN 7540-01-152-8070 30-105 STANDARD FORM 3 0 (REV.10-83) i PREVIOUS EDITION UNUSABLE Prescribed by GSA I

FAR (48 CFR) 53.243 l

9610010053 960920 PDR CONTR NRC-04-92-040 PDR

/'

~

'o NRC-04-92-040 Modification No.12 Page 2 of 3 The purpose of this modification is to (1) incor) orate a within-scope change l

in accordance with the attached statement of wort and PSU's technical proposal dated August 22. 1996. (2) increase the contract ceiling by $12.124 from l

$774.783 to $786,907. (3) provide funding in the amount of $12,000, and (4) change the Project Officer designated for this contract. Accordingly, the contract is modified as follows:

1.

Under Section B.3 " Consideration and Obligation -- Cost Reimbursement (JUN 1988) Alternate I (JUN 1988)." paragraphs a. and b. are deleted in l

their entirety and the following is substituted in lieu thereof:

"a.

The total estimated cost to the Government for full performance of this contract is $786.907.

b.

The amount presently obligated by the Government with respect to this contract is $786.783."

2.

Section C. " Statement of Work" is revised to add the effort as set forth in the attachment to this modification.

3.

Section F.5. " Place of Delivery -- Reports" paragraph (a) is revised to read as follows:

"(a) Project Officer (1 copy)

Dave Ebert US Nuclear Regulatory Commission Division of Systems Technology. T10-G6 l

Office of Nuclear Regulatory Research Washington. DC 20555" 4.

Section G.2. " PROJECT OFFICER AUTHORITY (JUN 1988)." paragraph (a) is deleted in its entirety and the following is substituted in lieu thereof:

"(a) The Contracting Officer's authorized representative hereinafter referred to as the Project Officer for this contract is:

Name:

Dave Ebert Address:

US Nuclear Regulatory Commission Division of Systems Technology. T10-G6 Office of Nuclear Regulatory Research Washington, DC 20555 Telephone:

(301) 415-6501"

NRC-04-92-040 Modification No.12 Page 3 of 3 A summary of obligations for this contract from award date through the date of 1

i this action is given below:

Total FY92 obligation:

$100.000.00 Total FY93 obligation:

$130.000.00 Total FY94 obligation:

$225.000.00 Total FY95 obligation:

$ 92.143.00 Total FY96 obligation:

$239.640.00 Cumulative Total of NRC Obligations:

$ 786.783.00 This modification obligates FY96 funds in the amount of $12.000.

All other terms and conditions of this contract remain unchanged.

Attachment:

(1) l

't

=

G e

Attachment Statement of Work - Modification 12

" Separator / Dryer Model Corrections," Under Section C.1.3.2. A.1 of Contract No. NRC-04-93-040 Backaround The separator / dryer component in TRAC-BF1 consists of three different models -

an ideal separator, a simple separator, and a mechanistic separator.

These l

model the steam separation process in increasing levels of complexity.

l Throughout the development of these models, numerous problems with execution l

were reported.

These include failure to converge and very small time step l

requirements.

The accuracy of the models is based on a comparison with steam l

separator performance data obtained by GE and reported in references 1 through 4.

References 1 and 2 include detailed comparisons of model performance with l

GE separator data.

l The models in the current version of TRAC-BF1 were reviewed and recent changes made to the code discussed with the code developers (reference 5).

These reviews and discussions identified a number of problems.

These 3roblems are consistent with those reported on numerous occasions by ICAP mem)ers during l

their assessments of the TRAC-BF1 code. Based on this review of the GE developed models and the numerical scheme used to solve the equations a number of deficiencies were identified.

These include inappropriate numerics that are incom)atible with the numerics in the main code, inability to simulate certain a) normal conditions such as separator flooding, and errors in implementation of the GE models.

Scone of Work l

'The contractor shall:

Perform a complete rewrite of the separator model numerics and coding.

Investigate alternative solution schemes and correct the separator / dryer l

errors noted.

Assess the updated models against the test data in references 1 and 2, and the ICAP reports which identified the problems.

(The ICAP reports include comparison of the TRAC calculations with actual plant data during transients in which the separator plays a critical role.)

Assessment of the mod 31s against data from EPRI (references 6 and 7) may be necessary.

References:

i 1.

Cheung, Y.K., J. Paraweswaran, and J.C. Shaug, "BWR Refill-Reflood Program Task 4.7 - Model Development TRAC-BWR Component Models." GE Report, NUREG/CR-2574, April 1983.

l 2.

Giles, M.

M.,

" Trac-BWR Completion Report: Generalized Leak Path and Separator Component Models " INEL Report, IS-NSMD-83-012. April 1983.

i 3.

Giles M. M.

Updated TRAC-BWR Completion Report Generalized Leak Path and Separator Component Models " INEL. Report, SAAMD-83-029. November 1983.

4.

Giles. M. M.

" Implicit SEPD," INEL Report SE-RST-85-0007, 1985.

5.

Weaver, W., Private Communication,1994.

6.

Waldman, J. P., "An evaluation of the RETRAN-02 Steam Separator Model,"

l MS Thesis. The Pennsylvania State University, 1985.

7.

Waldman, J. P., G. E. Robinson, and A. J. Baratta. "An evaluation of the RETRAN-02 Steam Separator Model," Proceedings of the Fourth International RETRAN Conference (1986).

Estimated Comoletion Date 10/30/96 I

Reoortino Reauirements and Deliverables i

A letter report outlining the results of the work performed on the separator / dryer models is due upon completion of work, but no later than 10/30/96.

1 e

_