ML20129E144

From kanterella
Jump to navigation Jump to search
Forwards Byron Unit 1 SG Eddy Current Insp Rept Cycle 7, Refueling Outage (B1R07),Apr-June 1996
ML20129E144
Person / Time
Site: Byron 
Issue date: 09/24/1996
From: Wozniak D
COMMONWEALTH EDISON CO.
To:
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20129E148 List:
References
BYRON-96-5155, NUDOCS 9609300311
Download: ML20129E144 (2)


Text

- _ _ - _ - - _.

Commonwealth lifison Compan) 11)run Generating Mation 1460 North German Church Hoad

11) ron,11. 61010979 i Tri H15-23 6 5111 September 24,1996 LTR: BYRON-96-5155 FILE: 3.11.0530 Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Document Control Desk

SUBJECT:

Comed Byron Station Unit 1 Steam Generator Eddy Current Examination During 81R07 - 90 Day Summary Report Byron Nuclear Power Station, Unit 1 Facility Operating License PF-37 NRC Docket No. 50-454

REFERENCE:

LER 454: 96-003 4

BYRON-96-5081 Please find attached a report for the Byron Unit 1 Steam Generator examination performed during Cycle 7 refueling outage (B1R07) during April-June 1996. This report is being submitted in compliance with the requirements of Mandatory Appendix IV of Section XI of the ASME Boiler and Pressure Vessel Code,1983 Edition through Summer 1983 Addenda in accordance with Byron Technical Specification 4.0.5.

y ',

fgl'

, mO k

9609300311 960924 I

PDR ADOCK 05000454 O

PDR A t!nicom com;un>

i

BYRON-96-5155 N..

If there are any additional questions, please contact Marcia Lesniak, Nuclear Licensing Administrator at (630)663-6484.

Sincerely, Ld b

David B.'Wozniak Q Site Engineering Manager Byron Nuclear Power Station DBW/cb Attachment cc:

A, B. Beach, NRC Regional Administrator, Rlll G. F. Dick, Jr., Byron Project Manager-NRR Sonia Burgess, Senior Resident inspector, Byron Office of Nuclear Safety - IDNS 4

L 1

i p:\\sec\\byrttr\\9&155. doc

-