ML20129D618
| ML20129D618 | |
| Person / Time | |
|---|---|
| Site: | Big Rock Point File:Consumers Energy icon.png |
| Issue date: | 09/20/1996 |
| From: | Caldwell J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Donnelly P CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| Shared Package | |
| ML20129D626 | List: |
| References | |
| NUDOCS 9609300143 | |
| Download: ML20129D618 (2) | |
See also: IR 05000155/1996005
Text
.
. - -
_
_
_
_ . _ .
h
l
i
j
J
\\\\
\\
September 20, 1996
l
l
P. M. Donnelly, Plant Manager
Big Rock Point Nuclear Plant
'
Consumers Power Company
10269 US 31 North
Charlevoix, MI 49720
SUBJECT:
NRC INTEGRATED INSPECTION REPORT 50-155/96005(DRP)
Dear Mr. Donnelly:
On July 26, 1996, the NRC completed an inspection at your Big Rock Point
Nuclear Plant. The enclosed report presents the results of that inspection.
During the 5-week period covered by this inspection, operations, maintenance,
and engineering activities were generally performed in a satisfactory manner.
,
Your staff has recently taken initiatives to improve work planning; however,
based on observations pertaining to maintenance work on plant technical-
specification-required equipment, continued attention is needed in this area.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of
this letter and its enclosures will be placed in the NRC Public Document Room
!
(PDR).
j
Sincerely,
James L. Caldwell, Acting Director
Division of Reactor Projects
Docket No. 50-155
License No. DPR-6
Enclosure:
Inspection Report No. 50/155/96005(DRP)
See attached distribution
Document:
R:\\insprpts\\ powers \\bigr\\brp96005.drp
3 = i.. . .
,.,t.
.
e
t. t wie.t. to th. h.. =ca - c.,y with t .st.en/
i n - c.,y .sth .stech/.aei
w-
0FFICE
RIII
Rill
A
,
NAME
Kropp. M l
Gr Mildwell
(
g
DATE
09//4/96
09/h/96
0FFICIAL LECORD COPY
.
gc09
.g\\
.
- er 28as!!!888?ss
G
f.
!
P. M. Donnelly
-2-
'
Distribution:
j
cc w/ enc 1:
Robert A. Fenech, Vice President,
Nuclear Operations
James R. Padgett, Michigan Public
Service Commission
,
Michigan Department of Public Health
l
Department of Attorney General (MI)
1
Docket File w/ encl
OC/LFDCB w/enci
DRP w/ encl
'
RIII PRR w/ encl
PUBLIC IE-01 w/ enc 1
A. B. Beach, w/ encl
j
CAA1 (E-Mail)
W. L. Axelson, w/ encl
B. L. Burgess, w/enci
1
j
i
!
I
,
l
.
.-
-.
_
_
.
l
-s
,
,
l
- /*"8d'y$T
UNITED STATES
,
NUCLEAR REGULATORY COMMISSION
i
j
E
REGION m
E
E
801 WARRENVILLE ROAD
%
/
USLE. ILUNOIS 60532-4351
.....
September 20, 1996
i
i
l
P. M. Donnelly, Plant Manager
l
Big Rock Point Nuclear Plant
i
Consumers Power Company
1
10269 US 31 North
!
Charlevoix, MI 49720
SUBJECT:
NRC INTEGRATED INSPECTION REPORT 50-155/96005(DRP)
Dear Mr. Donnelly:
i
On July 26, 1996, the NRC completed an inspection at your Big Rock Point
Nuclear Plant.
The enclosed report presents the results of that inspection.
During the 6-week period covered by this inspection, operations, maintenance,
and engineering activities were generally performed in a satisfactory manner,
j
Your staff has recently taken initiatives to improve work planning; however,
based on observations pertaining to maintenance work on plant technical-
l
specification-required equipment, continued attention is needed in this area.
%
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of
this letter and its enclosures will be placed in the NRC Public Document Room
(PDR).
Sincerely,
[d,.
/
/ ames L. Caldwell, Acting Director
Division of Reactor Projects
,
.
i
.
Docket No. 50-155
License No. DPR-6
.
Enclosure:
l
Inspection Report
t
l
No. 50/155/96005(DRP)
i
,
P
See Attached Distribution
.
l'
s
,
i
'
P. M. Donnelly-
2-
-
Distribution:
cc w/ encl: Robert A. Fenech, Vice President,
Nuclear Operations
James R. Padgett, Michigan Public
Service Commission
Michigan Department of Public Health
Department of Attorney General (MI)
e
.
O
F
i
!
l
l
! \\.
.
- I
,