ML20129C961

From kanterella
Jump to navigation Jump to search
Responds to 960910 Memo Re Request That NRC Ensure That Extensive SG Testing at Plant Performed Using state-of-art Plus Point Probes
Date released: 05/22/2020 Download: ML20129C961


Discusses Request for Extensive Testing by NRC of SG at Hnp. Testing Should Be Performed for Safety Reasons
ML20129D056
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 09/10/1996
From: Bassilakis R
AFFILIATION NOT ASSIGNED
To: JACKSON S A, THE CHAIRMAN
NRC COMMISSION (OCM)
References
Download: ML20129D056 (3)
Responds to 960910 Memo Re Request That NRC Ensure That Extensive SG Testing at Plant Performed Using state-of-art Plus Point Probes
ML20129C957
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 10/23/1996
From: Miraglia F
NRC (Affiliation Not Assigned)
To: BASSILAKIS R
AFFILIATION NOT ASSIGNED
References
Download: ML20129C957 (5)