ML20129C068
| ML20129C068 | |
| Person / Time | |
|---|---|
| Issue date: | 07/17/1985 |
| From: | Zech G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| To: | Rossi E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| REF-QA-99900741 NUDOCS 8507290337 | |
| Download: ML20129C068 (1) | |
Text
July 17, 1985 MEMORANDUM FOR:
Ernie Rossi, Chief Events Analysis Branch Division of Emergency Preparedness and Engineering Response FROM:
Gary G. Zech, Chief Vendor Program Branch Division of Quality Assurance, Vendor and Technical Training Center Programs
SUBJECT:
REQUEST FOR FOLLOWUP ON P0TENTIALLY GENERIC PROBLEM REGARDING LOOSE CRIMPED CONNECTIONS OBSERVED AT CLINTON BATTERY CHARGERS MANUFACTURED BY POWER CONVERSION PRODUCTS, CRYSTAL LAKE, ILLIN0IS
Reference:
Region III Action Item 84-379 DEPER Potentially Generic Item 84-36, 10 CFR Part 21 Item 85-146 The enclosed report 99900741/85-01 documents the results of an inspection conducted at Power Conversion Products (PCP) on May 22 and 23, 1985, and addresses the potentially generic item regarding the loose crimped connections reported in Region III Morning Report dated October 19, 1984.
We do not consider this item to be generic.
oriqmal Sl9ned by 7.c stone M ary G. Zech, Chief U Vendor Program Branch j
Division of Quality Assurance, Vendor and Technical Training Center Programs
Enclosure:
Report S9900741/85-01 DL"vTRIBUTION: w/o enclosure J EB:IE:09 (99900741/85-01)
VPB Reading DQAVT Reading EMerschoff KNaidu
] g,L J
VPBlDQAVT
.S B:00AVT PB:DQAVT 9[@
KNaidu: sam EMerschoff GGZech 7/ 3/85 F/3 /85 kl0/85 8h 8507290337 850717 PDR GA999 EMVPDWER 99900741 PDR E